# 55 East 59th Street, Manhattan

Condominium · built 1985 · Block 1374, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1013747501/55-east-59-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1374: https://umarelli.org/nyc/manhattan/1374.md

## Building permits

- Alteration, filed Jun 30, 2026, estimated cost $1K, described as “Non-illuminated non-advertising double-face projecting accessory banner for educational institute - lalliance new york. No change of use, egress or occupancy.”
- Alteration, filed Jun 22, 2026, estimated cost $895K, described as “Interior renovation to existing office space, partial demolition and interior tenant fit out. Work include general construction. No change to use egress or occupancy. Mechanical, plumbing and sprinkler filed under subsequent filing.”
- Alteration, filed May 20, 2026, estimated cost $305K, described as “General Construction plans filed herewith to show interior alterations within tenant space (Suite 11B). No change to use. egress. or occupancy.”
- Alteration, filed Mar 11, 2026, estimated cost $35K, described as “Removal of exisiting convenience stair and infill of a non essential convenience stair opening at 11TH floor”
- Alteration, filed Feb 13, 2026, estimated cost $650K, described as “General construction plans filed herewith to show interior alteration within tenant space ste 11 on 11TH floor in existing building. No change to use, egress, or occupancy.”
- Alteration, filed Oct 17, 2025, estimated cost $10K, described as “Interior removals as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Oct 17, 2025, estimated cost $56K, described as “Installation of partitions to separate units as per plans filed herewith. Tenant Build outs will be filed under separate applications. No change to use, egress or occupancy.”
- Alteration, filed Aug 4, 2025, estimated cost $7K, described as “Herewith filing plumbing work as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 4, 2025, estimated cost $64K, described as “Herewith filing mechanical work as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 21, 2025, estimated cost $707K, described as “Herewith filing architectural work as per plans. No change in use, egress or occupancy.”
- No Work, filed Jun 10, 2025, described as “Private TPA for 190 persons”
- Alteration, filed May 21, 2025, estimated cost $17K, described as “Mechanical modifications taking place on the CEL and 2nd floors as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 9, 2024, estimated cost $126K, described as “Sprinkler modifications taking place on the 2nd, 3rd and 4th floor as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 9, 2024, estimated cost $120K, described as “Plumbing modifications taking place on the 2nd, 3rd and 4th floor as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 9, 2024, estimated cost $540K, described as “Mechanical modifications taking place on the 2nd, 3rd and 4th floor as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 9, 2024, estimated cost $1.2M, described as “General construction modifications taking place on the 2nd, 3rd and 4th floors as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 22, 2024, described as “Installation of outriggers for facade repair and inspection”
- Alteration, filed Jun 3, 2024, estimated cost $90K, described as “Filing to convert a retail space and combine with an existing eating and drinking space at the 1st floor with a new accessory commercial kitchen at the cellar and cellar mezzanine.”
- Alteration, filed Oct 18, 2023, estimated cost $500K, described as “Filing for facade repairs as shown on drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 11, 2023, estimated cost $5K, described as “Installation of 300PSF sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the NYC building code 2022. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 7, 2023, estimated cost $435K, described as “Interior fit-out of deli (eating and drinking establishment) on the first floor, cellar, & mezzanine as per plans filed herewith. No change of use, egress, and occupancy.”
- Alteration, filed Apr 5, 2021, estimated cost $9K, described as “Installing temporary sprinklers heads and branch piping during construction in accordance with DOB bulletin 2020-012 ib. No change in use, egress, or occupancy.”
- Alteration, filed Oct 24, 2019, estimated cost $280K, described as “HVAC Work on the 18th Floor as per plans filed. No change to use, egress or occupancy is involved.”

## Building history

- Alteration, filed Jun 15, 2001, signed off Apr 11, 2003, described as “Change of use on 2nd floor form auction room to offices. Infill of 3rd fl. to add additional floor area, reflecting change to occupant load based on new floor area, as per plans filed herewith. Removal of requirement for horizontal exit on…”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $58,962,126
- 2026–27 Tax: $4,702,544
- Market value (city estimate): $131,026,956
- Taxable value: $43,726,545
- Assessed land: $10,381,499
- Assessed improvements: $48,580,627
- Condo units with their own tax lots: 39

## Tax breaks

- Nonprofit exemption (benevolent), with no end date, about $726,289 a year below the full tax.
- Nonprofit exemption (charitable), with no end date, about $534,225 a year below the full tax.
- Nonprofit exemption (museum), with no end date, about $226,506 a year below the full tax.

## Zoning

C5-2.5 (part of the lot is C5-3): floor area ratio 22.44 built, above the 12.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jan 26, 2026: $5,500,000, Apt 10, sold with other lots
- Aug 26, 2025: $5,000,000, Apt 10, sold with other lots
- Jun 30, 2025: $12,200,000, Apt 8, sold with other lots
- Jun 30, 2025: $5,400,000, Apt 15, sold with other lots
- Sep 27, 2016: $11,623,000, Apt 12
- Aug 2, 2016: $7,244,000, Apt 4B
- Apr 29, 2016: $13,900,000, Apt 15C H

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
