## Building permits

- Alteration, filed Oct 10, 2025, estimated cost $15K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 3RD fl (apt 3B) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 6, 2025, estimated cost $258K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 15TH fl (unit 15AB) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 24, 2024, estimated cost $3K, described as “Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Jun 14, 2024, estimated cost $3K, described as “Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 21, 2024, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed May 2, 2024, estimated cost $426K, described as “Repair facade as per drawings filed. No change in use, ocupancy, or egress.”
- Alteration, filed May 1, 2024, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 4, 2024, estimated cost $17K, described as “Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 15TH fl (unit 15AB) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 29, 2024, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 19, 2023, estimated cost $118K, described as “Interior renovation of apartment 5DE on the 5TH floor. No change in use, egress, or occupancy.”
- Alteration, filed Oct 11, 2023, estimated cost $90K, described as “Modification of existing Sprinkler system at Cellar, 1st & 2nd floors of existing Commercial space. No change to use, egress or occupancy.”
- Alteration, filed Oct 3, 2023, estimated cost $52K, described as “Modification of existing Plumbing system at Cellar, 1st & 2nd floors of existing commercial space. No change to use, egress or occupancy.”
- Alteration, filed Oct 3, 2023, estimated cost $320K, described as “Limited Mechanical Alterations for Commercial Space Renovation. No change to use, egress or occupancy.”
- Alteration, filed Sep 27, 2023, estimated cost $519K, described as “Interior Renovation of existing Commercial space at cellar, first floor &, second floor. No change to use, egress or occupancy.”
- Alteration, filed Aug 2, 2023, estimated cost $45K, described as “Modification of existing Sprinkler system at 1st & 2nd floors of existing retail space. No change to use, egress or occupancy.”
- Alteration, filed Aug 2, 2023, estimated cost $79K, described as “Limited Mechanical Alterations for Retail Space Renovation. to replace existing units. No change to use, egress or occupancy.”
- Alteration, filed Jun 2, 2023, estimated cost $379K, described as “Interior Renovation of existing commercial space at first floor &, second floor. No change to use, egress or occupancy.”
- Alteration, filed Feb 24, 2023, estimated cost $831K, described as “Replacing existing two chillers with two new 150 ton variable water cooled chillers in the SC1 as per plans filed herewith.”
- Alteration, filed Dec 15, 2022, estimated cost $13K, described as “Installation of five (5) new sprinkler heads, relocation of 21 sprinkler heads.”
- Alteration, filed Nov 3, 2022, estimated cost $38K, described as “Modification to plumbing work as per plans. No change to use, egress or occupancy.”
- Alteration, filed Nov 3, 2022, estimated cost $160K, described as “Remove and construction non bearing interior partitions, doors and ceiling, NO CHANGE IN USE, EGRESS OR OCCUPANCY.”
- Alteration, filed Aug 3, 2022, estimated cost $120K, described as “Remove non-bearing partitions, doors and ceiling and branch duct and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 2, 2022, estimated cost $25K, described as “Remove plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 29, 2022, estimated cost $7K, described as “Plumbing work in conjunction with merging apartments 10G & 10H.”
- Alteration, filed Mar 29, 2022, estimated cost $15K, described as “Combination of apartments 10G & 10H.”

7 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1013747502/502-park-avenue.

## Building history

- Major Renovation — Conversion, filed Oct 17, 2001, permit issued - entire job/work, 124 units added, 32 stories
- Alteration, filed Aug 13, 1998, permit issued - entire job/work, described as “We propose to reduce the number of perso ns on the first floor and obtai a new certificate of occupancy. There is no work to be done. We also propose to change the use on the fourth floor to include an eating and drinking place w/o…”
- Major Renovation — Conversion, filed Mar 5, 1997, permit issued - entire job/work, 175 units added, 31 stories, described as “No work to be done under this appl. Application filed to show paint room in existing storage as per n.y.c. Fire dept.request.”
- Major Renovation — Conversion, filed May 19, 1994, permit issued - entire job/work, 172 units added, 31 stories, described as “Expand existing art gallery on third flo or. Amend certificate of oc ncy to increase occupancy load on the 3R d floor as required by increased are construction work filed separately.”
- Alteration, filed Feb 2, 1994, permit issued - entire job/work, described as “Change use to physical culture establishemnt, relocate interior partition and plumbing fixtures, install new convenience stair, install new HVAC equipment and ductwork.”
- Major Renovation — Conversion, filed Feb 26, 1992, permit issued - entire job/work, 150 units added, described as “On 1ST flr- create new retail space from part of existing eating and dri king establ., open retial store to adjoi ning bldg by installing a fire rated do r. New office space on cellar, mezz. Ren ovate kitchen, storage and offices and…”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $52,833,603
- 2026–27 Tax: $6,060,739
- Market value (city estimate): $117,407,990
- Taxable value: $50,183,132
- Assessed land: $9,720,004
- Assessed improvements: $43,113,599
- Condo units with their own tax lots: 150

## Zoning

C5-3 (part of the lot is C5-2.5): floor area ratio 17.48 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 12, 2026: $1,200,000, Apt 15H
- Mar 30, 2026: $911,334, Apt 14K
- Aug 18, 2025: $7,300,000, Apt ST10, sold with other lots
- Jul 7, 2025: $1,573,058, Apt 14K
- Jan 7, 2025: $1,075,000, Apt 14J
- Dec 23, 2024: $1,200,000, Apt 15F
- Dec 11, 2024: $1,050,000, Apt 5H
- Nov 21, 2024: $2,800,000, Apt 6D
- Nov 19, 2024: $1,115,500, Apt 14F
- Nov 13, 2024: $1,040,000, Apt 11K

The 10 most recent of 40 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Change to an Earlier Grant (Board of Standards and Appeals 30-02-BZII): Change to an Earlier Grant, Granted, filed Jan 28, 2013, decided Jun 18, 2013. Extension of Term of a previously granted special permit (§73-36) for the continued operation of a physical culture establishment (New York City Sports Club) which expired on July 23, 2012; Amendment to permit the modification of approved…
- Variance or Special Permit (Board of Standards and Appeals 30-02-BZ): Variance or Special Permit, Granted, filed Jan 17, 2002, decided Jul 23, 2002. Special Permit (§73-36) to permit the legalization of an expansion of an existing physical culture establishment, located within portions of the basement, first floor, second floor mezzanine and second floor, of a thirty-two story…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology