# 807 5th Avenue, Manhattan

Hotel · built c. 1915 · Block 1376, Lot 69.

On Umarelli: https://umarelli.org/nyc/1013760069/807-5-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1376: https://umarelli.org/nyc/manhattan/1376.md

## Building permits

- Alteration, filed Dec 29, 2025, estimated cost $1K, described as “Installation of steel pipe scaffolding as per plans. No change in egress, use, or occupancy.”
- Alteration, filed Oct 27, 2025, estimated cost $370K, described as “General construction related to repair/ renovation of existing elevator shaft. Work to include mh,pl, st and fo scope. No change to use/ egress nor occupancy.”
- Alteration, filed Jun 24, 2024, estimated cost $2K, described as “Filing herewith construction fence for small portion of frontage to secure gate/entryway during gate/ entryway repairs.”
- Alteration, filed Jun 21, 2024, estimated cost $5K, described as “Grease trap replacement as per plans filed herewith.”
- Alteration, filed Feb 20, 2024, estimated cost $450K, described as “Herewith filing facade work as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 2, 2024, estimated cost $4K, described as “Storage of material / equipment / debris on top of heavy duty sidewalk shed not exceed 50 psf. Shed filed under separate application. Storage shall comply with CH#33 of the NYC bc. No change in use, occupancy or egress under this…”
- Alteration, filed Feb 2, 2024, estimated cost $47K, described as “Temporary pipe scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 20, 2023, estimated cost $300K, described as “Repair/replace ramp per plans filed herewith. No change to sue egress nor occupancy.”
- Alteration, filed Aug 31, 2023, estimated cost $35K, described as “Minor demo and temporary shoring related to fo/st work filed separately, as per plans filed herewith. No change to use egress nor occupancy.”
- Alteration, filed Aug 14, 2023, estimated cost $31K, described as “Heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 28, 2023, estimated cost $175K, described as “Filing herewith general construction renovations as per plans filed. No change to use, egress nor occupancy. Related work types st, fo, mh and pl/sp to be filed as subsequent applications.”

## Property taxes

- Assessment: $3,991,500
- 2026–27 tax: $368,580
- Market value (city estimate): $8,870,000
- Taxable value: $3,397,680
- Assessed land: $1,561,050
- Assessed improvements: $2,430,450

## Zoning

R10: floor area ratio 2.96 built, 10.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Knickerbocker Club Building: Individual Landmark, Upper East Side Historic District (Historic District). 48 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
