726 Madison Avenue, Manhattan
Commercial · built c. 1932 · Block 1378, Lot 56.
Building permits
- Alteration, filed Apr 9, 2026, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 18, 2026, estimated cost $1K, described as “Filing herewith for use of mechanical means DS1 in conjunction with application #M01018955-I1. No change in use, egress, or occupancy.”
- Alteration, filed Feb 9, 2026, estimated cost $3.2M, described as “Exterior repair and restoration of facade, repair wood railing, curb replacement, brick cleaning as per plans (Project Ruby - Buildout Phase.) No change to use, egress or occupancy.”
- Alteration, filed Oct 16, 2025, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 27, 2025, estimated cost $413K, described as “Support of excavation for the construction of proposed elevator pits, grease interceptor and sump pit and column B1 expansion in the Cellar Level as per plans (Project Ruby.) No change to use, egress or occupancy.”
- Alteration, filed Jun 27, 2025, described as “Installation of temporary plywood fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 18, 2025, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 6, 2025, estimated cost $4K, described as “Installation of temporary roof enclosure as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 6, 2025, estimated cost $4K, described as “Installation of temporary betamax hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 6, 2025, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 10, 2025, estimated cost $324K, described as “Install (38) new heads, (1) jockey & (1) booster pump on the Cellar, (33) heads on the 1st Floor, (25) heads on the 2nd Floor, (48) heads on the 3rd Floor and associated Sprinkler Piping (Project Ruby Buildout.) No change to use, egress or…”
- Alteration, filed Mar 3, 2025, estimated cost $2.0M, described as “Installation of new bathroom fixtures, kitchen fixtures, roof drains, and sanitary, vent, domestic water, and storm piping distribution on the Cellar, 1-3rd Floors and Roof as per plans (Project Ruby - Buildout.)”
- Alteration, filed Mar 3, 2025, estimated cost $3.0M, described as “Install new rooftop AC units for ventilation and kitchen exhaust, Install new outdoor/indoor VRF system, ductwork, refrigerant piping on the cellar, 1-3 and roof as per plans (Project Ruby/ Buildout Phase.) No change to use, egress or…”
- Alteration, filed Feb 21, 2025, estimated cost $8.2M, described as “Change of use to 3-story building from bank to eating & drinking establishment. Place of Assembly on 2nd floor only.”
- Alteration, filed Feb 21, 2025, estimated cost $323K, described as “Structural Modifications and install new elevator pits on the Cellar, 1st - 3rd Floors and Roof as per plans (Project Ruby.) No change to use, egress or occupancy”
- Alteration, filed May 3, 2024, estimated cost $222K, described as “Structural Modifications: Remove portion of existing Cellar Slab and sections of Vault lid; Install vault sidewall, ceiling, SDBs removal. Shoring/bracing at (3) locations on the 1st Floor as per plans (Project Ruby.) No change to use,…”
- Alteration, filed May 1, 2024, estimated cost $5K, described as “Modifications to the existing Sprinkler System: (4) existing pendant sprinkler heads modified to upright heads on the 1st Floor as per plans (Project Ruby.) No change to use, egress or occupancy.”
- Alteration, filed May 1, 2024, estimated cost $18K, described as “Removal of plumbing fixtures: (1) sink and (1) DW in the Cellar; (1) WC and (1) Lav on 1st Floor; (2) Lavs, (2) WC and (1) UR on both the 2nd and 3rd Floors as associated CW/sanitary piping capped back to active mains as per plans (Project…”
- Alteration, filed May 1, 2024, estimated cost $310K, described as “Minor interior demolition: Remove ceiling area to fireproofing, remove finishes including flooring, plaster, drywall as indicated on the Cellar, 1-3rd and Roof; and Roof Mock Up (Project Ruby - Demo Phase.) No change to use, egress or…”
- Alteration, filed May 1, 2024, estimated cost $24K, described as “Modifications to the existing HVAC System: Removal of ductwork, rooftop AC units, piping, thermostats and controls on the cellar, 1-3 and roof as per plans (Project Ruby/ Demo Phase.) No change to use, egress or occupancy.”
Property taxes
- Assessment
- $3,284,550
- 2026–27 tax
- $356,308
- Market value (city estimate)
- $7,299,000
- Taxable value
- $3,284,550
- Assessed land
- $2,020,500
- Assessed improvements
- $1,264,050
Zoning
C5-1: floor area ratio 3.35 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Upper East Side Historic District (Historic District). 33 Landmarks Preservation Commission permits are on file.