# 30 East 65th Street, Manhattan

Co-op · 63 units · built 1959 · Block 1379, Lot 51.

On Umarelli: https://umarelli.org/nyc/1013790051/30-east-65-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1379: https://umarelli.org/nyc/manhattan/1379.md

## Building permits

- Alteration, filed Apr 4, 2025, estimated cost $39K, described as “Minor construction renovation to apt. 2C on 2ND flr. Scope of work does not require change in egress.”
- Alteration, filed Sep 4, 2024, estimated cost $15K, described as “Interior renovation of existing residential apartment #2D on 2nd floor. Architectural work type. No change in use, occupancy, egress or zoning under the application.”
- Alteration, filed Jul 25, 2024, estimated cost $188K, described as “Sidewalk Replacement as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $5K, described as “Combination of existing unit and 50 sq of corridor. No change to occupancy use or egress under this application.”
- Alteration, filed Apr 22, 2024, estimated cost $450, described as “Non-illuminated non-advertising accessory sign - boucheron. No change of use, egress, or occupancy.”
- Alteration, filed Mar 19, 2024, estimated cost $2.5M, described as “Store renovation (boucheron) work to include storefront, partition, ceiling and door modifications as indicated on plans. No change in use, egress or occupancy,”
- Alteration, filed Nov 30, 2023, estimated cost $440K, described as “Interior renovation associated with the apartments 8E and 8D combination as shown on plans filed herewith. no change to use, egress or occupancy.”
- Alteration, filed Oct 25, 2023, estimated cost $141K, described as “General construction to renovate apt 5D on the 5TH floor. Work will include new partitions & finishes, and new plumbing fixtures. No change in use, egress, or occupancy under this filing.”
- Alteration, filed May 31, 2023, estimated cost $122K, described as “Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Aug 8, 2022, estimated cost $41K, described as “Filing for replacement of plumbing fixtures on existing roughing in apt 11c, 11th floor. no change in use, egress, nor occupancy.”
- Alteration, filed May 11, 2022, estimated cost $290K, described as “Renovation of retail space on 1ST floor and storefront work as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Apr 22, 2022, estimated cost $120K, described as “Interior demo for proposed office space as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Mar 25, 2022, estimated cost $18K, described as “Job filed for apartment interior renovation with minor plumbing fixture replacements in kind. No change of use, egress, or occupancy under this application.”
- Alteration, filed Mar 25, 2022, estimated cost $95K, described as “Job filed for apartment interior renovation with minor layout modifications, plumbing fixture replacements in kind, replace lighting fixture, and finish upgrades.no change of use, egress, or occupancy under this application.”
- Alteration, filed Feb 8, 2022, estimated cost $170K, described as “Interior renovation of apartment 6B on the 6TH floor. No change in use, egress or occupancy.”
- Alteration, filed May 9, 2021, estimated cost $1K, described as “Cap and remove gas stove in apt 7A. Architectural work filed under M00515526-I1. No change to occupancy use or egress under this application.”
- Alteration, filed May 5, 2021, estimated cost $10K, described as “Combination of apartment 7A and 7B as per plans filed herewith. No change to occupancy use or egress under this appliction.”
- Alteration, filed Apr 23, 2021, estimated cost $10K, described as “Plumbing work to be done in apartment 14A as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Apr 23, 2021, estimated cost $10K, described as “Interior renovation on apt 14A as per plans filed herewith.related plumbing work filed separately. No change to use, egress or occupancy”
- Alteration, filed Mar 9, 2021, estimated cost $225, described as “Install exterior non-illuminated wall sign (alexander mcqueen)”
- Alteration, filed Jan 12, 2021, estimated cost $64K, described as “Replacement of four rooftop fans and associated ductwork.”
- Alteration, filed Mar 20, 2020, described as “Filed to legalize Existing Condenser Unit at the roof deck over garage and Air Handling Unit in Doctors Office waiting area. Installation of new refrigerant tubing from Condenser to handling unit.”

## Building history

- Alteration, filed Jul 29, 2013, permit issued - entire job/work, units 68 to 63
- Major Renovation — Conversion, filed Sep 13, 2007, permit issued - entire job/work, 20 units added, 15 stories, described as “App. Filed to secure a temp. C of o as per extension of BSA application 308 64 bz. No work under this application”
- Major Renovation — Conversion, filed Mar 3, 2006, plan exam - disapproved, 20 units added, 15 stories, described as “Application filed in order to secure extension of BSA appliation 308 64 bz. New temporary certification of occupancy REQUI9RED. No work under the app lication.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $20,517,750
- 2026–27 Tax: $2,087,003
- Market value (city estimate): $45,595,000
- Taxable value: $18,318,980
- Assessed land: $3,681,000
- Assessed improvements: $16,836,750

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $189,131 credit this tax year.

## Zoning

C5-1 (part of the lot is R8B): floor area ratio 12.20 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Oct 6, 2026: $2,375,000
- Mar 9, 2026: $1,505,000
- Dec 19, 2025: $1,900,000
- Oct 31, 2025: $2,625,000
- Jul 8, 2025: $1,860,000
- Dec 17, 2024: $2,150,000
- Oct 17, 2024: $1,300,000
- Aug 14, 2024: $3,125,000
- Nov 6, 2023: $1,120,075
- Nov 6, 2023: $1,100,000

The 10 most recent of 28 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Upper East Side Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- Change to an Earlier Grant (Board of Standards and Appeals 308-64-BZ): Change to an Earlier Grant, Granted, filed Jun 2, 2006, decided Sep 12, 2006. Extension of Term/Waiver of a variance for the use of 15 surplus attended transient parking spaces within a multiple dwelling presently located in a C5-1/R8/MP zoning district. The original grant of the variance by the Board of Standards…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
