700 Park Avenue, Manhattan
Co-op · 48 units · built 1959 · Block 1384, Lot 32.
Building permits
- Alteration, filed Jun 5, 2026, estimated cost $165K, described as “Interior renovation of apartment 2B and suite 9 on the 2ND floor. No change to use, egress, or occupancy.”
- Alteration, filed Feb 3, 2026, estimated cost $160K, described as “Interior Renovations of Apartment Unit 10C as per plans. No change is Use, Egress or Occupancy under this application.”
- Alteration, filed Dec 9, 2025
- Alteration, filed Oct 10, 2025, estimated cost $175K, described as “Filing initiated for renovation of apartment 6C, including replacement of walls, doors,, kitchen cabinetry, casings, finishes, suspended ceilings, flooring, and lighting, as per plans filed herewith. No change in use, egress, and occupancy,”
- Alteration, filed Oct 10, 2025, estimated cost $48K, described as “Plumbing work associated with renovation of apt 6C, including replacement, relocation, and new installation of toilets, lavs, showers, tub, sink, and washer/dryer, per plans filed herein. No change in use, egress, or occupancy.”
- Alteration, filed May 19, 2025, estimated cost $18K, described as “Install new chimney liner for fireplace as per plans. No change to use, occupancy or egress.”
- Alteration, filed Mar 7, 2025, estimated cost $210K, described as “Remove/install new non-load bearing partitions and finishes. No change in occupancy, use or egress. Pl, ms & window replacements filed seperately.”
- Alteration, filed Jan 13, 2025, estimated cost $200K, described as “Interior renovation: to receive newwall/floor finish, millwork, new lighting & outlets.new kitchen's & bathrooms' fixtures and cabinets.no structural . Plumbing fixtures are to be replaced in the same location filed in laa by plumber.”
- Alteration, filed May 7, 2024, estimated cost $175K, described as “Apartment renovation including modification of interior non-load bearing partitions and hung ceilings. No change in occupancy, use or egress.”
- Alteration, filed Nov 1, 2023, estimated cost $30K, described as “Filing for bathroom renovation and removing a wall between kitchen and dining room in apartment 11B. No change to use, egress, or occupancy.”
- Alteration, filed Mar 8, 2023, estimated cost $100K, described as “Interior alteration to existing apartment”
- Alteration, filed Aug 19, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 12, 2022, estimated cost $500K, described as “Apartment renovation including modification of interior non-load bearing partitions and hung ceilings. No change in occupancy, use or egress.”
- Alteration, filed Jun 14, 2022, estimated cost $25K, described as “Filing herewith drawings indicating interior renovation to apartment 3B on the 3rd floor. No change in use, egress or occupancy under this application”
- Alteration, filed Apr 19, 2022, estimated cost $43K, described as “Exterior and masonry repairs as per drawings. No change in use, egress or occupancy is involved under this application.”
- Alteration, filed Apr 19, 2022, estimated cost $200K, described as “Interior alteration to existing apartment 15B”
- Alteration, filed Feb 15, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 10, 2021, estimated cost $10K, described as “Install (2) heat pumps for 20th floor penthouse 'A' solarium”
- Alteration, filed Nov 2, 2021, estimated cost $186K, described as “Interior renovation of an existing apartment (#9C) on the 9th floor. No change to use, egress or occupancy.”
- Alteration, filed Nov 2, 2021, estimated cost $44K, described as “Plumbing work associated with renovation of kitchen and bathrooms in Apt. #9C on the 9th floor. No change to use, egress or occupancy.”
- Alteration, filed Aug 20, 2021, estimated cost $86K, described as “Parial penthouse roof replacement and railing resetting as per drawings. No change in use, egress or occupancy is involved under this application.”
- Alteration, filed Apr 1, 2021, estimated cost $130K, described as “Renovation of an exisiting class A apartment, #5C; as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Apr 1, 2021, estimated cost $50K, described as “Replacement and installation of plumbing fixtures and finishes in conjunction with renovation of an existing class A apartment, #5C; as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Jan 28, 2021, estimated cost $6K, described as “Replace existing fan coil units throughout”
- Alteration, filed Jan 26, 2021, estimated cost $26K, described as “Renovation to existing duplex apartment 15C. Remove one bathroom and renovate existing kitchen, powder room, bathroom, and master bathroom.”
1 more, older permit is in this building’s full list on the map.
Property taxes
- Assessment
- $22,714,650
- 2026–27 tax
- $2,369,016
- Market value (city estimate)
- $50,477,000
- Taxable value
- $21,722,100
- Assessed land
- $4,212,000
- Assessed improvements
- $18,502,650
Tax breaks
- Co-op and condo abatement, with no end date, a $332,996 credit this tax year.
Zoning
R10 (part of the lot is R8B): floor area ratio 13.83 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 25, 2026: $4,315,213
- Mar 11, 2026: $2,350,000
- Dec 11, 2025: $350,000
- Oct 16, 2025: $350,000
- Aug 26, 2025: $1,980,000
- Aug 21, 2025: $375,000
- Mar 26, 2025: $1,868,500
- Nov 25, 2024: $2,750,000
- Sep 17, 2024: $3,550,000
- May 6, 2024: $1,950,000
The 10 most recent of 27 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Upper East Side Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.