900 5th Avenue, Manhattan
Co-op · 52 units · built 1958 · Block 1386, Lot 1.
Building permits
- Alteration, filed Sep 28, 2026, estimated cost $28K, described as “Garage restoration as per plans”
- Alteration, filed Aug 18, 2026, estimated cost $95K, described as “Interior renovation in apt. #14C. No change of use, egress or occupancy.”
- Alteration, filed Jun 5, 2026, estimated cost $70K, described as “Replace sinks & toilet, remove bidet, enlarge shower. Relocate washer/dryer. Replace kitchen cabinets & new closet shelving. Ceiling to remain. No changes to use, exterior, energy, egress or occupancy. Prior to 1968 code.”
- Alteration, filed Jun 3, 2026, estimated cost $444K, described as “Renovation of existing apartment at tenth floor level of 900 fifth avenue, as per attached plans. No change in occupancy, use, egress, floor area, volume or fire safety.”
- Alteration, filed Apr 24, 2026, estimated cost $500K, described as “Interior renovation of existing dwelling unit #4B on the 4th floor of a residential building. Architectural work only, no change to use, occupancy, or egress.”
- Alteration, filed Jul 4, 2024, estimated cost $281K, described as “Filing herewith drawings to propose an interior renovation of existing apartment # 14A. This application do not require a new or amended certificate of occupancy as there is no change in use, exists or occupancy.”
- Alteration, filed Jun 27, 2024, described as “Installation of suspended scaffold for facade work or inspection”
- Alteration, filed Jun 19, 2024, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 11, 2024, estimated cost $249K, described as “Limited facade restoration as per plans filed. No change in occupancy, use or egress.”
- Alteration, filed Jun 10, 2024, estimated cost $100K, described as “General construction associated with cellar restoration work as per plans filed. No change in occupancy, use or egress.”
- Alteration, filed May 30, 2024, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 23, 2024, estimated cost $255K, described as “Renovation of an existing apartment.#14B on the 14th Floor. Work to include non-structural demolition, general construction and mechanical as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Dec 19, 2023, estimated cost $291K, described as “Interior renovation in apt 18/19B filed in conjunction with DOB now pl and mh. No change to use, occupancy or egress.”
- Alteration, filed Nov 16, 2023, estimated cost $97K, described as “Removal and installation of plumbing fixtures in apartment 11A. No change in occupancy, egress or use.”
- Alteration, filed Nov 16, 2023, estimated cost $287K, described as “Interior gut renovation of existing apartment unit 11A. work include relocation of bathroom and bedroom and kitchen”
- Alteration, filed Nov 16, 2023, estimated cost $48K, described as “Install new HVAC system in apartment 11A. No change in use, egress or occupancy is involved.”
- Alteration, filed Oct 2, 2023, estimated cost $250K, described as “Renovation of an existing penthouse apartment. Work to include non-structural demolition, general construction, new and modify openings as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Apr 18, 2023, estimated cost $150K, described as “Interior renovation of existing dwelling unit #5B on the 5TH floor of the residential building. Architectural work only, no change to use, occupancy, or egress.”
- Alteration, filed Apr 18, 2023, estimated cost $35K, described as “Plumbing work in conjunction w/interior renovation of existing dwelling unit #5B on the 5th floor of a residential building, no change in use, occupancy, egress, or zoning.”
- Alteration, filed Aug 3, 2022, described as “Installation of temporary plywood fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 19, 2022, estimated cost $190K, described as “Structural repairs in sub-cellar and cellar as per plans filed. No change in occupancy, use or egress.”
- Alteration, filed Jul 13, 2022, estimated cost $975K, described as “"Herewith filing facade repair as per plans filed herewith. No change in occupancy, use or egress"”
- Alteration, filed Mar 29, 2022, estimated cost $35K, described as “Plumbing work in conjunction w/ interior renovation of existing dwelling unit #6b on the 6TH floor of residential building, no change in use, occupancy, egress, or zoning”
- Alteration, filed Mar 24, 2022, estimated cost $265K, described as “Interior renovation of existing dwelling unit #6B on the 6th floor of a residential building. Architectural work only, no change to use,occupancy, or egress..”
- Alteration, filed Feb 22, 2022, estimated cost $258K, described as “Interior renovations to existing apartment #7C. Work to include non-structural demolition, general construction & finishes, in-kind replacement of fan coil units & bathroom exhaust fans, as per plans filed herewith. No change in use,…”
8 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $26,622,450
- 2026–27 tax
- $2,813,757
- Market value (city estimate)
- $59,161,000
- Taxable value
- $25,089,200
- Assessed land
- $5,399,100
- Assessed improvements
- $21,223,350
Tax breaks
- Co-op and condo abatement, with no end date, a $307,262 credit this tax year.
Zoning
R10: floor area ratio 15.23 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 20, 2026: $2,200,000
- May 28, 2026: $125,000
- Apr 8, 2026: $1,500,000
- Apr 8, 2026: $20,365
- Mar 12, 2026: $2,825,000
- Jun 25, 2025: $3,400,000
- Apr 9, 2025: $2,100,000
- Mar 31, 2025: $4,125,000
- Jan 17, 2025: $2,325,000
- Dec 12, 2024: $4,150,000
The 10 most recent of 32 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Upper East Side Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.