907 5th Avenue, Manhattan
Co-op · 71 units · built c. 1915 · Block 1386, Lot 69.
Building permits
- Alteration, filed Jun 3, 2026, estimated cost $128K, described as “Minor interior renovation of the 12th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use egress or occupancy.”
- Alteration, filed Jun 26, 2025, estimated cost $184K, described as “Alteration Type II for interior renovation and combination of two apartments 3A & 3F to be 3AF. Remove one (1) kitchen & renovate one (1) bathroom as per plans. No change to Use, Occupancy, or Egress.”
- Alteration, filed May 16, 2025, estimated cost $217K, described as “Application filed to renovate apartment 5E to include modification of non load bearing partitions with new finishes. No change to use, egress or occupancy- Mechanical and plumbing being filed under subsequent application.”
- Alteration, filed Aug 1, 2024, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk rated 600 PSF for material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 1, 2024, estimated cost $3K, described as “Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 1, 2024, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 15, 2024, estimated cost $65K, described as “Partition, finish and fixture work at existing dwelling unit 6ADC at 6th floor. No change to use, egress or occupancy under this application.”
- Alteration, filed Jun 27, 2024, estimated cost $839K, described as “Interior renovation of existing Apartment 4B, as per plans. No change to Use, Occupancy or Egress.”
- Alteration, filed Apr 18, 2024, described as “Installation of swing stage scaffolding”
- Alteration, filed Apr 17, 2024, estimated cost $480K, described as “Masonry facade work as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Mar 1, 2023, estimated cost $80K, described as “Int Alteration to ex Res Apt (#4B). Modification to exist Mech System. (2) Fan Coil Units, (2) Condensing Units, Bathroom Exhaust. Installation of thru-window Mech equip/louvers on non-visible secondary east facade. No change in use,…”
- Alteration, filed Mar 1, 2023, estimated cost $20K, described as “Int Alteration to ex Residential Apt (#4B). Modifications to existing Plumbing System. New kitchen & bathrooms. No change in use, egress, occupancy.”
- Alteration, filed Feb 28, 2023, estimated cost $250K, described as “Int Alteration to ex Residential Apt (#4B). New non-load bearing partitions, ceilings, finishes. New kitchen & bathrooms. Replace entry door. Install thru-window Mech equip/louvers on non-visible secondary east facade. No change in use,…”
- Alteration, filed Dec 13, 2022, estimated cost $543K, described as “Replace finishes and fixtures in bathrooms and kitchen per plan. Removal and construction of non-load bearing partition walls per plan. New central HVAC per plan. Plumbing work filed on separate application. No change to use occupancy or…”
- Alteration, filed Dec 1, 2021, estimated cost $16K, described as “Plumbing fixture work to accommodate the apartment combination filed as per tppn 3/97.”
- Alteration, filed Dec 1, 2021, estimated cost $74K, described as “Construction & mechanical work related to the apartment combination being filed as per TPPN3/97. Combine two existing residential units at the 6th floor (units 6AD+6C). Partition, finish, fixture work. Mechanical work including new HVAC…”
- Alteration, filed Mar 9, 2021, estimated cost $20K, described as “Formally filing mechanical work for apt. 3A to renovate one (1) bathrooms, one (1) kitchen and one (1) powder room as per plans. Installation of new ptac units and air conditioning units as per plans.”
- Alteration, filed Mar 9, 2021, estimated cost $19K, described as “Formally filing plumbing work for apt. 3A, renovate one (1) bathroom, one (1) kitchen and add one (1) powder room as per plans. Add one (1) laundry closet. Replace plumbing fixtures as per plans.”
- Alteration, filed Mar 3, 2020, estimated cost $60K, described as “Formally filing mechanical work for apt. 6B, renovate two (2) bathrooms, one (1) kitchen and add one (1) powder room as per plans. Installation of new air conditioning units as per plans.”
- Alteration, filed Mar 3, 2020, estimated cost $28K, described as “Formally filing plumbing work for apt. 6B, renovate two (2) bathrooms, one (1) kitchen and add one (1) powder room as per plans. Replace plumbing fixtures as per plans.”
Property taxes
- Assessment
- $20,594,250
- 2026–27 tax
- $2,305,872
- Market value (city estimate)
- $45,765,000
- Taxable value
- $19,789,752
- Assessed land
- $4,725,000
- Assessed improvements
- $15,869,250
Tax breaks
- Co-op and condo abatement, with no end date, a $155,775 credit this tax year.
Zoning
R10: floor area ratio 10.24 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Mar 24, 2026: $2,350,000
- Jan 29, 2025: $3,800,000
- Jan 14, 2025: $37,500,000
- Aug 21, 2024: $140,000
- Mar 18, 2024: $999,999
- Nov 10, 2023: $3,100,000
- Jun 2, 2023: $7,000,000
- Apr 20, 2022: $3,060,000
- Dec 17, 2021: $3,825,000
- Dec 9, 2021: $185,000
The 10 most recent of 23 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Upper East Side Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.