770 Park Avenue, Manhattan
Co-op · 42 units · built c. 1930 · Block 1387, Lot 37.
Building permits
- Alteration, filed Jun 18, 2026, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 12, 2026, estimated cost $100K, described as “Herewith filing minor construction work related to mechanical equipment replacement, as per plans submitted. There is no change to use, egress or occupancy.”
- Alteration, filed Apr 14, 2026, estimated cost $762K, described as “Renovation of an existing apartment. No change to use, occupancy or egress.”
- Alteration, filed Apr 9, 2026, estimated cost $250K, described as “Herewith filing architectural work as per plans. No change in use, egress or occupancy”
- Alteration, filed Sep 2, 2025, described as “Installation of suspended scaffold for facade inspection/repair.”
- Alteration, filed Apr 23, 2025, estimated cost $7K, described as “Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 23, 2025, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 23, 2025, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 4, 2025, estimated cost $256K, described as “Facade Repairs, no change in use, egress or occupancy.”
- Alteration, filed Sep 5, 2024, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter #33 of the NYC building code 2022. No change in use, occupancy, or egress under this application.”
- Alteration, filed Aug 12, 2024, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Jul 22, 2024, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy.”
- Alteration, filed Apr 3, 2024, estimated cost $60K, described as “Plumbing work proposed for an existing residential duplex. No change to use, occupancy or egress.”
- Alteration, filed Apr 3, 2024, estimated cost $65K, described as “Mechanical work proposed for an existing residential duplex. No change to use, occupancy or egress.”
- Alteration, filed Apr 3, 2024, estimated cost $30K, described as “Structural work proposed for an existing residential duplex. No change to use, occupancy or egress.”
- Alteration, filed Apr 3, 2024, estimated cost $331K, described as “Renovation of an existing residential duplex. A mechanical enclosure at the roof is proposed. No change to use, occupancy or egress.”
- Alteration, filed May 15, 2023, estimated cost $12K, described as “Plumbing modifications to apt 10D as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 10, 2023, estimated cost $155K, described as “Apartment renovations to apt 10D (strong residence) to include removal and installation of partitions, door and ceiling, and mechanical modifications as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 26, 2022, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 9, 2022, described as “Installation of temporary pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Aug 12, 2022, estimated cost $403K, described as “Facade repairs. No change in use, egress or occupancy.”
- Alteration, filed Jun 2, 2022, estimated cost $1K, described as “Installation of supported scaffoldng as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed May 23, 2022, estimated cost $12K, described as “Installation of two indoor air handling units with related duct work with new condensing units on exterior terrace with refrigerant piping for same for apartment 2D on the second floor. No change in occupancy or egress.”
- Alteration, filed May 17, 2022, estimated cost $60K, described as “Herewith filing structural work for windows and louver openings, as per plans submitted.”
- Alteration, filed May 13, 2022, estimated cost $45K, described as “Herewith filing the removal and installation of plumbing fixtures in unit 14D.”
9 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $30,294,900
- 2026–27 tax
- $2,790,306
- Market value (city estimate)
- $67,322,000
- Taxable value
- $25,818,680
- Assessed land
- $6,165,000
- Assessed improvements
- $24,129,900
Tax breaks
- Co-op and condo abatement, with no end date, a $421,288 credit this tax year.
Zoning
R10 (part of the lot is R8B): floor area ratio 12.48 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 14, 2026: $7,000,000
- Apr 8, 2026: $10,500,000
- Sep 18, 2025: $7,550,000
- Jun 17, 2025: $418,962
- Apr 21, 2025: $15,210
- Jul 10, 2023: $12,750,000
- Oct 24, 2022: $9,435,000
- Jun 27, 2022: $13,000,000
- Jul 16, 2021: $9,000,000
- Jun 23, 2021: $5,600,000
The 10 most recent of 14 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Upper East Side Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.