# 784 Park Avenue, Manhattan

Co-op · 58 units · built c. 1929 · Block 1388, Lot 37.

On Umarelli: https://umarelli.org/nyc/1013880037/784-park-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1388: https://umarelli.org/nyc/manhattan/1388.md

## Building permits

- Alteration, filed Nov 9, 2026, estimated cost $213K, described as “Renovation of the of an existing apartment#15A on the 15th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jan 19, 2026, estimated cost $75K, described as “Proposed booster pump system and associated equipment enclosure to be located on the bulkhead roof of Apartment 21C. Development Design Architectural Set, indicating the proposed layout, enclosure, and select architectural details”
- Alteration, filed Jan 14, 2026, estimated cost $298K, described as “Filing application for the interior renovation work at apartment 8B on the 8th & 9th floors. No change in use egress or occupancy.”
- Alteration, filed Jul 30, 2024, estimated cost $75K, described as “Slab on Grade Settlement Repairs. No Change in Use, Egress, or Occupancy”
- Alteration, filed Apr 1, 2024, estimated cost $30K, described as “For installation of HVAC equipment in Apt #9C, AHU units 1,2 and 3 and ACCU-1, 2 abd 3 and ductwork..”
- Alteration, filed Feb 20, 2024, estimated cost $472K, described as “Renovation of Apt. 9C, general construction to include removal of interior finishes, new finishes and minor partition layout changes.plumbing and mechanical work types to be filed separately. No change to use, egress or occupancy.”
- Alteration, filed Dec 2, 2022, estimated cost $203K, described as “Herewith Filing Renovations in apartment 18A and accessory terrace as per shown on plans filed. No change in use, egress, occupancy proposed under this application.”
- Alteration, filed Dec 2, 2022, estimated cost $55K, described as “Herewith Filing modifications to existing Mechanical system in conjunction with interior renovations of Apartment 18A. No change in use, egress, occupancy proposed under this application.”
- Alteration, filed Aug 17, 2022, estimated cost $5K, described as “Installation of 300 psf sidewalk shed, roof protection and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 26, 2022, estimated cost $5K, described as “Suspended scaffold as shown on plans”
- Alteration, filed May 17, 2022, estimated cost $279K, described as “Inter. Renov.: removal & disposal of gwb, flr, clg & wall finishes. Installat'n of new gwb,floor, clg & wall finishes, all in existing residential duplex. No change to use, egress or occupancy. No enlargement, nor exterior work.”
- Alteration, filed May 17, 2022, estimated cost $21K, described as “Plumbing scope of work in-conjunction with interior renovation general construction application for duplex. No change to use, egress or occupancy. No enlargement, nor exterior work.”
- Alteration, filed May 16, 2022, described as “Installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.”
- Alteration, filed Mar 25, 2022, estimated cost $50K, described as “Mechanical work filed in conjunction with the renovation of of an existing duplex apartment as per plans filed herewith. Plumbing and architectural work filed separately. No change in use egress or occupancy.”
- Alteration, filed Mar 25, 2022, estimated cost $650K, described as “Renovation of an existing duplex apartment as per plans. Plumbing and mechanical work filed separately. No change of use, occupancy or egress.”
- Alteration, filed Mar 25, 2022, estimated cost $50K, described as “Plumbing work filed in conjunction with the renovation of an existing duplex apartment as per plans. architectural and mechanical work filed separately. no change of use egress or occupancy”
- Alteration, filed Apr 9, 2021, described as “Installation of pipe scaffolding. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Nov 17, 2020, estimated cost $18K, described as “Interior renovation in apt 18B to install ac units filed in conjunction with DOB now M00356507 and bis 140972570. No change to use, occupancy or egress.”
- Alteration, filed Nov 5, 2020, estimated cost $38K, described as “Plumbing fixtures in apt 18B in conjunction with ot bis and mh filing. No change to use, occupancy or egress.”
- Alteration, filed Oct 15, 2020, described as “Installation of sidewalk shed”
- Alteration, filed Jul 20, 2020, estimated cost $116K, described as “Installation of ductwork associated with apt renovation and installation of 2 ac units & hood exhausts to existing thru the wall vent. No change in use, egress or ocucpancy.”
- Alteration, filed May 15, 2020, estimated cost $56K, described as “Modification of plumbing fixtures in apt 21C as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 24, 2019, estimated cost $14K, described as “Mechanical work for new split system in unit 1A, 1B, 1C & 1D. No change to use, egress or occupancy.”
- Alteration, filed Aug 10, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 5, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $26,109,900
- 2026–27 tax: $2,335,438
- Market value (city estimate): $58,022,000
- Taxable value: $21,641,486
- Assessed land: $4,099,500
- Assessed improvements: $22,010,400

## Tax breaks

- Co-op and condo abatement, with no end date, a $356,546 credit this tax year.

## Zoning

R10 (part of the lot is R8B): floor area ratio 13.18 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 10, 2026: $9,200,000
- Dec 12, 2025: $3,425,000
- Dec 12, 2025: $4,300,000
- Oct 22, 2025: $1,600,000
- Apr 8, 2025: $4,400,000
- Feb 5, 2025: $6,100,000
- Jan 7, 2025: $3,195,000
- Oct 2, 2024: $4,995,000
- May 3, 2024: $4,950,000
- Mar 22, 2024: $850,000

The 10 most recent of 25 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Upper East Side Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
