960 5th Avenue, Manhattan
Co-op · 77 units · built c. 1928 · Block 1392, Lot 1.
Building permits
- Alteration, filed Jul 22, 2026, estimated cost $138K, described as “Proposed interior renovation of Kitchen and Pantry. Work includes replacement of existing appliances and plumbing fixtures with new; replacement of cabinets and countertops with new; replacement of ceiling, wall, and floor finishes with…”
- Alteration, filed May 26, 2026, estimated cost $102K, described as “Modification of general construction work in apartment 9CD as shown on submitted pans. No change in occupancy, use or egress.”
- Alteration, filed Apr 23, 2026, estimated cost $150K, described as “Filing herewith exterior work.”
- Alteration, filed Apr 15, 2026, estimated cost $1.2M, described as “Renovation of an existing apartment 15B. Demolition and construction of partitions, interior renovation of kitchen, and bathroom. All work is interior. Plumbing work filed under separate app. No change in use, occupancy or egress.”
- Alteration, filed Apr 6, 2026, estimated cost $200K, described as “Modifications to apt 12c and 12D including removal & installation of non-structural partitions, removal of existing windows & frames a& installation of new, & new, modified, & closing of openings in exterior wall. No change in use, egress…”
- Alteration, filed Mar 5, 2026, estimated cost $140K, described as “Install two split heat pump systems. Condenser outside the building and air handlers in kitchen with a coil installed in the existing makeup air unit”
- Alteration, filed Feb 20, 2026, estimated cost $30K, described as “Installation of thru-wall ac units and associated GC work, as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Nov 19, 2025, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 15, 2025, estimated cost $10K, described as “Installation of pipe scaffolding and window protection as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Jul 31, 2025, estimated cost $5K, described as “Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 31, 2025, estimated cost $5K, described as “Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 23, 2025, estimated cost $9.0M, described as “Interior construction work as shown on plans filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Jul 2, 2025, estimated cost $191K, described as “Interior renovations of apt. 14AB as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed May 16, 2025, estimated cost $8K, described as “Replacement of brick masonry at north elevation for fisp cycle 9C compliance”
- Alteration, filed Mar 27, 2025, estimated cost $120K, described as “Modification of High Pressure Steam Distribution and Installation of Pressure Reducing Valves.”
- Alteration, filed Dec 2, 2024, estimated cost $350K, described as “Interior renovation and combination of apartment 14A/15A with 14B. No change in use, occupancy, or egress.”
- No Work, filed Apr 26, 2024
- Alteration, filed Oct 13, 2023, described as “Installation of temporary plywood enclosure as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 9, 2023, estimated cost $31K, described as “Shoring of excavation for planter repairs in conjunction with job filing M00663956.”
- Alteration, filed Mar 21, 2023, estimated cost $5.6M, described as “Application filed for renovation of Apt 1B/2B as shown on plans”
- Alteration, filed Feb 23, 2023, estimated cost $125K, described as “Interior renovation of the first floor kitchen and cellar storage space, involving new non-load bearing partitions, ceiling repairs and lighting, new wall and floor finishes no change of use or egress under this application.”
- Alteration, filed Feb 22, 2023, estimated cost $618K, described as “Renovation of apartment 5A on the 005 floor. Addition of new daikin system with heat pump. No change in use, occupancy, or egress.”
- Alteration, filed Feb 22, 2023, estimated cost $335K, described as “Renovation of apartment 5A on the 005 floor and staff room on the 004 floor. Plumbing work. No change in use, occupancy, or egress.”
- Alteration, filed Feb 15, 2023, estimated cost $4.7M, described as “Interior renovation of apartment #5A (5TH floor) and staff rooms (4TH floor). No change to use, occupancy, egress, or zoning.”
- Alteration, filed Feb 8, 2023, estimated cost $251K, described as “Enlarging existing openings in masonry wall, replacement of windows to match historical sizes, removal of juliet balconies. No change to use, occupancy, egress, or zoning.”
29 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $28,191,600
- 2026–27 tax
- $3,184,541
- Market value (city estimate)
- $62,648,000
- Taxable value
- $26,727,762
- Assessed land
- $7,065,000
- Assessed improvements
- $21,126,600
Tax breaks
- Co-op and condo abatement, with no end date, a $140,125 credit this tax year.
Zoning
R10 (part of the lot is R8B): floor area ratio 9.64 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- May 18, 2026: $1,150,000
- Dec 4, 2025: $2,400,000
- Dec 4, 2025: $1,100,000
- Nov 15, 2025: $3,450,000
- Nov 15, 2025: $150,000
- Jun 10, 2025: $2,495,000
- May 27, 2025: $4,000,000
- Mar 12, 2025: $150,000
- Jan 9, 2025: $53,500,000
- Dec 23, 2024: $2,700,000
The 10 most recent of 35 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Upper East Side Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.