# 140 E 62nd Street, Manhattan

Commercial · built c. 1899 · Block 1396, Lot 25.

On Umarelli: https://umarelli.org/nyc/1013960025/140-e-62-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1396: https://umarelli.org/nyc/manhattan/1396.md

## Building permits

- Alteration, filed Nov 3, 2026, estimated cost $1K, described as “Filing to correct Certificate of Compliance information submitted under #M00612630-I1. No change to use, occupancy, or egress”
- No Work, filed Oct 6, 2026, described as “Lecture Hall events”
- No Work, filed May 6, 2026, described as “Lecture Hall events”
- No Work, filed Feb 20, 2026, described as “Lecture Hall events”
- No Work, filed May 16, 2025, described as “Lecture presentations”
- Alteration, filed Feb 24, 2024, estimated cost $35K, described as “Herewith filing underground plumbing work as per plans. No change in use, egress or occupancy.”
- No Work, filed Oct 10, 2023, described as “Filing for a temporary place of assembly for lecture hall event 186 persons with 3 fire guard as indicated on the drawings, the will occur between october 9th to january 10 2024”
- No Work, filed Apr 27, 2023, described as “Filing for a temporary place of assembly for lecture hall event 183 persons with 3 fire guard as indicated on the drawings, this will occur on may 5TH to august 4TH 2023 between 9AM to 6PM”
- No Work, filed Dec 2, 2022, described as “Filing for a temporary place of assembly for lecture hall event 186 persons with 3 fire guard as indicated on the drawings, the will occur between 11AM to 12PM on december 14TH 2022.”
- Alteration, filed Oct 22, 2021, estimated cost $20K, described as “Installation of Temporary Structural Bracing to support Interior Demolition and Alteration work noted in Job Numbers M00540355 and M00536177. No change in Use, Egress or Occupancy.”
- Alteration, filed Oct 21, 2021, estimated cost $60K, described as “Filing herewith modification of HVAC system on floor 1 through 5TH and roof as indicated on the drawings. No change in use egrss or occupancy”
- Alteration, filed Oct 5, 2021, estimated cost $100K, described as “Filing herewith modification of plumbing on the 3RD 4TH, 5TH and the 6TH floor as indicated on the drawings. No change in use egress or occupancy”
- Alteration, filed Oct 5, 2021, estimated cost $80K, described as “Modification of sprinkler system on the cellar, 1ST thru 6TH floor, roof and mezzanine as indicated on the drawings. No change in use egress or occupancy.”
- Alteration, filed Jul 14, 2021, estimated cost $1.0M, described as “Filing herewith alteration type 1 for change of occupant on the 1ST,4TH , 5TH floor and mezzanine as indicated on the drawings new certificate of occupancy.”
- Alteration, filed Jun 28, 2021, estimated cost $100K, described as “Filing herewith structural work on the 1ST, 2ND 5TH and mezzanine as indicated on the drawings. No change in use egress or occupancy.”
- Alteration, filed Jun 24, 2021, estimated cost $500K, described as “Filing herewith interior renovation includes partitions, door, closets fixtures and finishes on the 1ST , 4TH 5THFLOOR and mezzanine as indicated on the drawings. No change in use egress or occupancy.”

## Property taxes

- Assessment: $2,649,600
- Market value (city estimate): $5,888,000
- Taxable value: $0
- Assessed land: $985,500
- Assessed improvements: $1,664,100

## Tax breaks

- Nonprofit exemption (charitable), with no end date, about $287,429 a year below the full tax.

## Zoning

R8B: floor area ratio 3.04 built, 4.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology