1030 3rd Avenue, Manhattan
Co-op · 176 units · built 1983 · Block 1396, Lot 33.
Building permits
- Alteration, filed Oct 29, 2026, estimated cost $159K, described as “Perform interiorrenovations in existing apartment #26C at the 26FLOOR.”
- Alteration, filed Aug 17, 2026, estimated cost $75K, described as “Renovation of existing apartment as per plans herewith filed. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 3, 2026, estimated cost $250K, described as “General construction to include minor demo and renovations to an existing apartment as per drawings filed herewith, no change in use, egress or occupancy under this application.”
- Alteration, filed Feb 17, 2026, estimated cost $338K, described as “Interior renovation of existing commercial space at existing cellar and 1ST floor as per plans filed herewith. Partition, finish and fixture work. No change in use and egress.MEP to be filed under separate application.”
- Alteration, filed Oct 20, 2025, estimated cost $3K, described as “Minor alteration to bathroom; converting a tub to a standing shower. Plumbing to be filed separately under an laa. No change of use, egress or occupancy.”
- Alteration, filed Aug 29, 2025, estimated cost $187K, described as “Interior renovation of apartment 21C on the 21 floor. No change in use egress or occupancy.”
- Alteration, filed Mar 8, 2025, estimated cost $55K, described as “Application filed for amended certificate of occupancy for change of use/occupancy in the cellar for accessory commercial kitchen to 1ST floor eating and drinking establishment. This application will supersede # 122375189. Related app. #…”
- Alteration, filed Feb 7, 2025, estimated cost $11K, described as “Apartment renovation including modification and installation of plumbing fixtures.”
- Alteration, filed Feb 7, 2025, estimated cost $72K, described as “Apartment renovation including modification and installation of partitions, flooring, ceiling, cabinetry, and lighting. No change in use, egress, or occupancy.”
- Alteration, filed Jan 15, 2025, estimated cost $180K, described as “Minor non-structural partition layout changes and new finishes, fixtures and equipment throughout”
- Alteration, filed Jun 10, 2024, estimated cost $137K, described as “Renovation of apartment 34A. No change in use, egress or occupancy.”
- Alteration, filed Oct 20, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 20, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 1, 2023, estimated cost $1.4M, described as “Garage and Vault Repairs as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Oct 17, 2022, estimated cost $24K, described as “Interior renovation of existing apartment #15A on 15 floor as per plans submitted. No change in use, egress or occupancy.”
- Alteration, filed Oct 17, 2022, estimated cost $12K, described as “Plumbing worktype is filed in conjuction with #M00780979-I1 as per plans submitted. No change in use, egress or occupancy.”
- Alteration, filed Feb 25, 2022, estimated cost $41K, described as “Modifications to existing plumbing work including remove, install & replace fixtures in apts #14C and #14D combination as per TPPN 3/97. No change to use, egress or occupancy.”
- Alteration, filed Feb 25, 2022, estimated cost $208K, described as “Minor interior partition removals and construction in conjunction with apts #14C & #14D combination as per TPPN 3/97. Remove one kitchen, create laundry area & modify closets. Install new lighting. No change to use, egress or occupancy.”
- Alteration, filed Dec 29, 2021, estimated cost $24K, described as “Remove replace and install new Plumbing fixtures in apt no #4E at 4th Floor. all as per plan. no change on use egress or occupancy.”
- Alteration, filed Mar 17, 2021, estimated cost $35K, described as “Modifications to the existing plumbing system (Apt 6AB) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Mar 17, 2021, estimated cost $178K, described as “Minor demolition with installation of new interior partitions and architectural finishes (Apt 6AB) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 31, 2020
- Alteration, filed Aug 4, 2020, estimated cost $5K, described as “Minor plumbing work filed conjunction with job number # 140910352. No changes in use, egress, or occupancy in this application.”
- Alteration, filed Jun 9, 2020, estimated cost $21K, described as “Replacement of plumbing fixtures in unit 14E on the 13th floor. No change to use egress or occupancy.”
- Alteration, filed Feb 11, 2020, estimated cost $15K, described as “Proposed plumbing work at an existing bathroom, half-bath and a kitchen”
6 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $46,727,550
- 2026–27 tax
- $4,641,449
- Market value (city estimate)
- $103,839,000
- Taxable value
- $41,522,726
- Assessed land
- $9,450,000
- Assessed improvements
- $37,277,550
Tax breaks
- Co-op and condo abatement, with no end date, a $523,588 credit this tax year.
Zoning
C1-9: floor area ratio 14.83 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 10, 2026: $3,050,000
- Aug 28, 2026: $1,600,000
- Jul 30, 2026: $3,450,000
- Jul 30, 2026: $1,900,000
- Apr 28, 2026: $962,500
- Apr 10, 2026: $1,272,500
- Mar 23, 2026: $900,000
- Jan 27, 2026: $2,673,000
- Nov 19, 2025: $2,550,000
- Oct 30, 2025: $1,712,000
The 10 most recent of 69 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- ARGONAUT COFFEE HOUSE (City Planning P1977M0503): Completed, decided Nov 3, 1977. RENEWAL 1 YR-CONSENT FOR UNENCLOSED SIDEWALK CAFE