## Building permits

- Alteration, filed Aug 29, 2025, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 19, 2024, described as “Installation of temporary pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Aug 2, 2024, estimated cost $1K, described as “Installation of temporary debris chute. No change in use, egress or occupancy.”
- Alteration, filed Jun 6, 2024, estimated cost $59K, described as “Install new chimney liner and extension as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jun 6, 2024, estimated cost $59K, described as “Install new chimney liner and offset as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jun 6, 2024, estimated cost $59K, described as “Install new chimney liner and extension as per plans. No change in use, occupancy, or egress.”
- Alteration, filed Jun 6, 2024, estimated cost $59K, described as “Install new chimney liner as per plans. No change in use, occupancy or egress.”
- Alteration, filed Apr 2, 2024, estimated cost $5K, described as “Installation of 300PSF sidewalk shed, construction fence and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.”
- Alteration, filed Mar 18, 2024, estimated cost $68K, described as “This Alteration application is being filed for the replacement of boiler and hot water pump. There are no change in use, egress or occupancy.”
- Alteration, filed Mar 18, 2024, estimated cost $68K, described as “This Alteration is being filed for the replacement of boiler & hot water pump. There are no change in use, egress or occupancy under this application.”
- Alteration, filed Mar 18, 2024, estimated cost $68K, described as “This Alteration application is being filed for the replacement of boiler and hot water pump. There are no change in use, egress or occupancy.”
- Alteration, filed Mar 18, 2024, estimated cost $68K, described as “This Alteration application is being filed for the replacement of boilers and hot water pumps. There are no change in use, egress or occupancy.”
- Alteration, filed Mar 8, 2024, estimated cost $1.2M, described as “This Alteration is being filed for the replacement of rooftop air handler units, chillers, removal of chiller water pumps. There are no change in use, egress or occupancy.”
- Alteration, filed Mar 8, 2024, estimated cost $128K, described as “This Alteration is being filed for the installation of new dunnage support beams and platform of an existing rooftop. There are no change on use, egress or occupancy.”
- Alteration, filed Mar 7, 2024, estimated cost $20K, described as “This Alteration application is being filed for the replacement of water heater & domestic water pump. There are no change in use, egress or occupancy.”
- Alteration, filed Feb 24, 2024, estimated cost $63K, described as “Herewith filing for underground plumbing work as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 23, 2024, estimated cost $120K, described as “Partial demolition means & methods and related stabilization as per plans. This application is filed in conjunction with M00955745-I1.”
- Alteration, filed Feb 14, 2024, estimated cost $66K, described as “Support of excavation, underpinning and monitoring of SOE and adjacent structures.”
- Alteration, filed Jan 2, 2024, estimated cost $20K, described as “2 Boiler installation in conjunction with Alteration”
- Alteration, filed Jan 2, 2024, estimated cost $1.0M, described as “Mechanical work in conjunction with Alteration”
- Alteration, filed Nov 20, 2023, estimated cost $544K, described as “New rear extension and elevator and stair bulkhead; combine with other buildings on the lot and change use from residential to offices. No dwelling units in the building will be occipied during construction. Pl and sp work here by filed.”
- Alteration, filed Nov 10, 2023, estimated cost $3.1M, described as “The Proposed project is adding this portion (146 E 62nd St.) to the existing Mellon foundation building (136-144 E 62nd St.). New Rear extension and elevator and stair bulkhead and change use.”
- No Work, filed Oct 10, 2023, described as “The event is for the foundation's president to welcome staff back to the facility”
- Alteration, filed Aug 10, 2023, estimated cost $1.3M, described as “Interior demo and renovation of building, No change in use, egress, or occupancy.”
- No Work, filed Apr 28, 2023, described as “The event is for the foundation's president to welcome staff back to the facility”

17 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1013960048/140-e-62-street.

## Property taxes

- Assessment: $4,099,050
- Market value (city estimate): $9,109,000
- Taxable value: $0
- Assessed land: $2,370,600
- Assessed improvements: $1,728,450

## Tax breaks

- Nonprofit exemption (charitable), with no end date, about $444,665 a year below the full tax.

## Zoning

R8B (part of the lot is C1-8X): floor area ratio 2.57 built, 4.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.