1050 3rd Avenue, Manhattan
Co-op · 70 units · built 1963 · Block 1397, Lot 33.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Jun 19, 2026, estimated cost $46K, described as “Replace existing heat pump units with new units and connect to existing ductwork distribution. Install associated refrigerant and condensate piping. No change in use egress or occupancy.”
- Alteration, filed Jun 8, 2026, estimated cost $83K, described as “Garage repairs as indicated per drawings. There is no change to use, egress, or occupancy”
- Alteration, filed Jun 19, 2025, estimated cost $11K, described as “Plumbing work in apt 12C”
- Alteration, filed Jun 19, 2025, estimated cost $10K, described as “Renovation of apt 12C”
- Alteration, filed Aug 15, 2024, estimated cost $105K, described as “Medical Office Renovation”
- Alteration, filed Jun 21, 2022, estimated cost $22K, described as “Plumbing work in 7C”
- Alteration, filed Jun 21, 2022, estimated cost $70K, described as “Interior renovation of apt 7C”
- Alteration, filed May 3, 2022, estimated cost $120K, described as “Renovation of an apartment on the 8TH floor. New partitions, remodeled bathrooms and kitchen. Application re-filed to include all work already approved under application # 103436426 and to obtain letter of completion/sign-off.”
- Alteration, filed May 3, 2022, estimated cost $26K, described as “All existing plumbing fixtures to be replaced at existing locations for all bathrooms in apartment 8D on the 8TH floor. Removed one shower from bathroom to turn into a powder room. All appliances replaced at existing locations.”
- Alteration, filed Mar 22, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 25, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 9, 2021, estimated cost $171K, described as “Filing to facade repairs as per plans filed herewith. No change to use, occupancy or egress.”
- Alteration, filed May 27, 2021, estimated cost $10K, described as “Construction a non bearing wall in existing apartment. No change to use occupancy or egress”
- Alteration, filed Feb 5, 2020, estimated cost $15K, described as “Interior plumbing replacement to existing two bathrooms, one powder room. Addition of one washer/dryer (electric) In association with OT application 123866637”
- Alteration, filed Jan 6, 2020, estimated cost $4K, described as “New 3 compartment sink, floor sink, hand sink and ice machine.”
- Alteration, filed Nov 11, 2019, estimated cost $25K, described as “Modification of plumbing fixtures as shown on submitted plans. Remove 2 fixtures, install 2 new fixtures and replace 13 fixtures. No change in occupancy, use or egress.”
Property taxes
- Assessment
- $22,726,350
- 2026–27 tax
- $2,227,191
- Market value (city estimate)
- $50,503,000
- Taxable value
- $20,866,860
- Assessed land
- $3,141,000
- Assessed improvements
- $19,585,350
Tax breaks
- Co-op and condo abatement, with no end date, a $325,524 credit this tax year.
Zoning
C1-9: floor area ratio 14.66 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Recent sales
- Apr 20, 2026: $875,000
- Sep 3, 2025: $518,000
- Feb 24, 2025: $285,011
- Jul 2, 2024: $280,000
- May 19, 2023: $900,000
- Apr 11, 2023: $1,085,000
- Mar 23, 2023: $814,600
- Apr 29, 2022: $50,000
- Mar 30, 2022: $650,000
- Mar 8, 2022: $1,900,000
The 10 most recent of 32 open-market sales since 2016, from the Department of Finance’s sales files.