# 130 East 63rd Street, Manhattan

Condominium · 73 units · built 1960 · Block 1397, Lot 7504.

On Umarelli: https://umarelli.org/nyc/1013977504/130-east-63-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1397: https://umarelli.org/nyc/manhattan/1397.md

## Building permits

- Alteration, filed May 11, 2026, estimated cost $75K, described as “Interior renovation of unit 15E on the 015 floor. No change in use, occupancy, or egress.”
- Alteration, filed May 8, 2026, estimated cost $47K, described as “Application filed for interior removal of non-load bearing partitions, ceilings, and finishes in the cellar and on the 1ST floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 2, 2026, estimated cost $79K, described as “Herewith file plans for interior renovation of an existing apt unit 11A located on fifth floor. Work will involve general construction for new non-load bear partitions, new finishes throughout. No change in bulk occupancy or egress”
- Alteration, filed Feb 4, 2026, estimated cost $3K, described as “Propose to install new illuminated channel letters on aluminum raceway for existing commercial space. No change to use, egress or occupancy.”
- Alteration, filed Feb 2, 2024, estimated cost $34K, described as “Install replacement washer machines, gas piping, and water/sanitary piping as per plans. Install sprinkler heads for laundry room as per plans. No change to use, occupancy or egress.”
- Alteration, filed Sep 11, 2023, estimated cost $143K, described as “Interior renovation of residential apartment onthe fourteenth floor as per plans filed herewith. No change to occupancy, use or egress under this application.”
- Alteration, filed Jan 12, 2023, estimated cost $79K, described as “Herewith file plans for interior renovation of an existing apt unit 5A located on fifth floor. Work will involve general construction for new non-load bear partitions, new finishes throughout. No change in bulk occupancy or egress”
- Alteration, filed May 10, 2022, estimated cost $74K, described as “Herewith file plans for interior renovation of apt 6CD master bedroom and bathroom. General construction for new non-load bear partitions, new finishes. No change in use, egress and occupancy. Combination of apartments shall comply with…”
- Alteration, filed Jan 25, 2022, estimated cost $125K, described as “Interior renovations to existing apartment unit. No change in use, egress or occupancy”
- Alteration, filed Nov 11, 2021, estimated cost $23K, described as “Filing here with for plumbing work to be done at apt 12Dand 12E”
- Alteration, filed Sep 3, 2021, estimated cost $118K, described as “Filing herewith for the renovations and combining of apartments 12D and 12E”
- Alteration, filed Apr 1, 2021, estimated cost $3K, described as “Erect illuminated wall sign not within view of arterial highway or public park 1/2 acre or more. No change in use egress or occupancy”
- Alteration, filed Feb 10, 2021, estimated cost $11K, described as “Modification of plumbing related to renovation on 4TH floor in apt 4A as per plans. Application filed for plumbing work only all construction work filed under# M00447448. No change in use, egress or occupancy.”
- Alteration, filed Feb 10, 2021, estimated cost $190K, described as “Interior demo and installation of partitions associated with minor renovation in apt 4A as per plans filed herewith. Nochange in use, egress or occupancy.”
- Alteration, filed Oct 10, 2019, estimated cost $18K, described as “Herewith file plans for plumbing work for apt 6C located on 6TH floor. General construction approved under DOB job 123710172. New plumbing fixtures to be installed. No change in use, egress and occupancy.”
- Alteration, filed Jul 19, 2018, estimated cost $2K, described as “Non illuminated business accessory wall sign. No change to use, egress or occupancy”

## Building history

- Major Renovation — Conversion, filed May 5, 2000, permit issued - entire job/work, 73 units added, 15 stories, described as “Combine apts 14B &amp; 14D on 13TH floor as per plans filed herewith. This is a no work application. All work performed under alt 102206907. Obtain amended c of o.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $17,005,050
- 2026–27 Tax: $1,748,028
- Market value (city estimate): $37,789,000
- Taxable value: $15,325,108
- Assessed land: $3,676,500
- Assessed improvements: $13,328,550
- Condo units with their own tax lots: 2

## Zoning

C1-8X: floor area ratio 11.99 built, above the 9.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 28, 2026: $1,400,000
- Aug 12, 2026: $1,350,000
- Nov 20, 2025: $1,216,809
- Sep 22, 2025: $1,750,000
- Jun 5, 2025: $975,000
- Dec 17, 2024: $1,515,000
- Jun 18, 2024: $2,850,000
- Apr 30, 2024: $950,000
- Apr 24, 2024: $640,000
- Apr 8, 2024: $1,350,000

The 10 most recent of 49 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
