# 181 East 65th Street, Manhattan

Condominium · 93 units · built 2000 · Block 1400, Lot 7501.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1014007501/181-east-65-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1400: https://umarelli.org/nyc/manhattan/1400.md

## Building permits

- Alteration, filed Jun 12, 2026, estimated cost $597K, described as “Filing to combine apartments 27A and 27B. Remove and install interior partitions, finishes etc. Remove kitchen at apartment 27B. No change in use, egress or occupancy.”
- Alteration, filed Aug 4, 2025, estimated cost $29K, described as “#8973 - Minor structural modifications to interior column. No change in egress, use, or occupancy.”
- Alteration, filed Nov 4, 2024, estimated cost $20K, described as “Removing & replacing existing plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy under this appliaction. General construction filed separately”
- Alteration, filed Nov 4, 2024, estimated cost $156K, described as “Interior renovation of existing apt #4B. No change to use, egress or occupancy under this application. Plumbing work filed separately.”
- Alteration, filed Sep 4, 2024, estimated cost $20K, described as “Installation of sprinkler heads and related piping as per plans.”
- Alteration, filed Aug 8, 2024, estimated cost $30K, described as “Infill three openings, two on the first floor and one in the cellar.”
- Alteration, filed Jul 3, 2024, estimated cost $100K, described as “Filing for the acessory elevator installation at the penthous b. No change in use, egress or occupancy.”
- Alteration, filed Jul 2, 2024, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed May 24, 2024, estimated cost $60K, described as “Filing plumbing work as per plans”
- Alteration, filed May 23, 2024, estimated cost $55K, described as “Remove Existing Domestic Hot Water Heaters and associated venting. Existing gas main, gas branch piping, and gas valve to Remain. Install 2 New Domestic Hot water Heaters with new venting. No Change to the Use, Occupancy, or Egress.”
- Alteration, filed Apr 10, 2024, estimated cost $181K, described as “Facade repairs. No change in egress, use or occupancy.”
- Alteration, filed Apr 5, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 22, 2024, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in, egress, use, or occupancy.”
- Alteration, filed Mar 5, 2024, estimated cost $72K, described as “Interior renovation to the penthouse B as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Feb 29, 2024, estimated cost $30K, described as “Removal and relocation of interior partitions with related removal and replacement of ceiling and floor finishes with replacement of bathroom and kitchen plumbing fixtures and appliances in Apt 18B on the 18th Floor. No change in occupancy…”
- Alteration, filed Jan 11, 2024, estimated cost $140K, described as “The addition of mechanical equipment to the system for the penthouse.”
- Alteration, filed Nov 29, 2023, estimated cost $50K, described as “Filing for general construction as per plans”
- Alteration, filed Oct 5, 2023, estimated cost $288K, described as “Renovation of an existing apartment#27A on the 27th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 28, 2023, estimated cost $5K, described as “Supported pipe scaffild as shown on the plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Sep 20, 2023, estimated cost $10K, described as “Filing for mechanical work as per plans”
- Alteration, filed Sep 12, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Aug 11, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 29, 2023, estimated cost $150K, described as “Apt. #23A, install minor interior partitions and new finishes. No change in egress, occupancy, or use.”
- Alteration, filed Apr 25, 2023, estimated cost $21K, described as “Installation of two condensing units on the roof with a total capacity of 6 tons. No change to egress, use, or occupancy.”
- Alteration, filed Jan 30, 2023, estimated cost $685K, described as “Architectural work in conjunction with interior renovation of the apt 31B; 29TH floor”

25 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1014007501/181-east-65-street.

## Building history

- Alteration, filed Jan 30, 2020, permit issued - entire job/work, described as “Filing ALT1 application to construct medical office and change 2NF floor use from c (mercantile) to b (offices) as per plans filed herewith. Plumbing filed under DOB now job M00225709 and mechanical under M00231707.”
- New Building — Tower, filed Jun 30, 1998, signed off Jul 8, 2005, 89 units, 32 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $38,457,451
- 2026–27 Tax: $4,173,363
- Market value (city estimate): $85,461,005
- Taxable value: $36,369,860
- Assessed land: $3,444,746
- Assessed improvements: $35,012,705
- Condo units with their own tax lots: 95

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $222,041 credit this tax year.

## Zoning

C1-9: floor area ratio 17.59 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Oct 8, 2026: $6,300,000, Apt 18B
- Oct 6, 2026: $4,250,000, Apt 6B
- Oct 5, 2026: $4,550,000, Apt 5A
- Sep 24, 2026: $2,895,000, Apt 8C
- Jul 8, 2026: $3,450,000, Apt 5B
- Jan 20, 2026: $2,100,000, Apt 20C
- Jun 16, 2025: $7,450,000, Apt 27B
- Dec 13, 2024: $2,900,000, Apt 16C
- Oct 7, 2024: $2,200,000, Apt 19C
- Jul 15, 2024: $6,300,000, Apt 19A

The 10 most recent of 51 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 1120 THIRD AVE (City Planning P1987M0906): Completed. 87-066M: VARIANCE FOR PROF OFFICES USE GR6-IN AN R8B LANDMARK DIST. TB1400. TL37.
- SIGN OF THE DOVE (City Planning P1997M0753): Completed, decided Oct 9, 1997. RENEWAL-UNENCLOSED SIDEWALK CAFE WITH 38 SEATS FOR 5-YEARS
- SIGN OF THE DOVE (City Planning P1992M0629): Completed, decided May 13, 1992. RENEWAL-UNENCLOSED SIDEWALK CAFE WITH 52 SEATS FOR 5-YEARS

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
