1156 3rd Avenue, Manhattan
Condominium · 163 units · built 1965 · Block 1402, Lot 7501.
Building permits
- Alteration, filed Apr 24, 2025, described as “Installation and use of suspended scaffold for facade restoration/ inspection as per plans submitted”
- Alteration, filed Dec 17, 2024, estimated cost $10K, described as “Mechanical work in the laundry room, no change in use, egress, and occupancy.”
- Alteration, filed Aug 27, 2024, estimated cost $25K, described as “Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 9, 2024, estimated cost $613K, described as “Facade restoration as indicated on the plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 7, 2024, described as “Installation and use of suspended scaffold for facade restoration/inspection as per plans submitted”
- Alteration, filed Aug 2, 2024, estimated cost $25K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 3, 2023, estimated cost $15K, described as “Interior Alterations to combine Apartments 3H & J. Alterations to non load bearing walls only. No change of use, egress or occupancy under this application.”
- Alteration, filed Mar 10, 2023, estimated cost $103K, described as “New gas fired hot water heater. Reconnect to existing low pressure gas line. No change in means of egress use group or occupancy”
- Alteration, filed Mar 9, 2023, estimated cost $1.2M, described as “Install (7) new electric chillers. Remove steam absorber, replacement (3) new pumps. Remove all abandoned equipment and piping not required. New electric service and switching gear. No change in means of egress use group or occupancy.”
- Alteration, filed Jul 5, 2022, estimated cost $2K, described as “Install 8' construction fence at above address.”
- Alteration, filed Feb 2, 2022, estimated cost $42K, described as “Installation of new plumbing fixtures related with: c cold water piping,hot water pipinh,re-circulation piping,sanitart drainage piping and sanitary vent piping. Pl filed in conjunction with NB app#”
- Alteration, filed Feb 2, 2022, estimated cost $28K, described as “Existing heatiing and cooling system. Existing supply and return duct to be demolished. New supplu and return duct”
- Alteration, filed Nov 13, 2021, estimated cost $69K, described as “Renovate existing walgreens store to be food retail store as per plans; minor partitions; new flooring at cellar & 1ST floor; paint throughout.”
- Alteration, filed Feb 6, 2020, estimated cost $7K, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
Property taxes
- Assessment
- $23,441,850
- 2026–27 tax
- $2,347,093
- Market value (city estimate)
- $52,093,000
- Taxable value
- $21,328,846
- Assessed land
- $3,793,500
- Assessed improvements
- $19,648,350
- Condo units with their own tax lots
- 2
Zoning
C1-9: floor area ratio 13.77 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 3, 2026: $1,375,000
- Aug 27, 2026: $575,000
- Jul 6, 2026: $697,500
- Jun 29, 2026: $550,000
- Jun 24, 2026: $685,000
- Jun 18, 2026: $430,000
- Apr 27, 2026: $539,000
- Apr 13, 2026: $925,000
- Mar 26, 2026: $560,000
- Mar 13, 2026: $550,000
The 10 most recent of 90 open-market sales since 2016, from the Department of Finance’s sales files.