# 737 Park Avenue, Manhattan

Condominium · 64 units · built 1940 · Block 1406, Lot 7504.

On Umarelli: https://umarelli.org/nyc/1014067504/737-park-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1406: https://umarelli.org/nyc/manhattan/1406.md

## Building permits

- Alteration, filed Jul 29, 2025, estimated cost $125K, described as “Herewith file plans to renovate apt. 12E. Minor removal and construction of partitions and finishes. No change to use egress or occupancy.”
- Alteration, filed Jan 23, 2024, estimated cost $265K, described as “Renovate apt 16E, minor plumbing fixture work, no change to, use, exits or occupancy”
- Alteration, filed Jan 19, 2024, described as “Renewal”
- Alteration, filed May 17, 2023, estimated cost $500K, described as “General construction to unit 20a as per plans filed herewith. no change to use, egress or occupancy.”
- Alteration, filed Apr 21, 2023, estimated cost $40K, described as “New dropped ceilings and lighting as per architectural plans”
- Alteration, filed Aug 6, 2022, estimated cost $20K, described as “Herewith filing application to obtain a permit to demolish walls indicated on drawing A-100 in order to determine exact location of risers and other elements that would impact any proposed plan. Subsequent application to follow to submit…”
- Alteration, filed Jun 13, 2022, estimated cost $233K, described as “Facade Restoration Project. No change in use, egress or occupancy.”
- Alteration, filed Apr 21, 2022, estimated cost $5K, described as “Erect, maintain and dismantle heavy duty sidewalk shed as per plans filed herewith.”
- Alteration, filed Apr 20, 2022, estimated cost $5K, described as “Erect, maintain & dismantle of scaffold for facade repairs as per drawings attached herewith”
- Alteration, filed Nov 11, 2021, estimated cost $466K, described as “Apartment 2G--general construction inclusive of modifications to interior partitions for pre-tenant renovations. No change to use, egress, or occupancy.”
- Alteration, filed Nov 11, 2021, estimated cost $29K, described as “Apt. 2G--installation of plumbing fixtures for pre-tenant apartment renovation.”
- Alteration, filed Nov 11, 2021, estimated cost $25K, described as “Apt. 2G--installation of mechanical HVAC and heating equipment with related duct and piping for pre-tenant apartment renovation.”
- Alteration, filed Jun 22, 2021, estimated cost $160K, described as “Interior renovation includes Partitions with Finishes , flooring, finishes ceiling finishes , millwork and doors as indicated on plans”
- Alteration, filed Oct 8, 2019, estimated cost $15K, described as “Reconfigure existing bathroom. Filed in conjunction with job 140867569”
- Alteration, filed Sep 26, 2019, estimated cost $93K, described as “Install domestic water filtration system.”

## Property taxes

- Assessment: $32,614,968
- 2026–27 tax: $3,869,475
- Market value (city estimate): $74,382,999
- Taxable value: $32,124,947
- Assessed land: $3,842,710
- Assessed improvements: $28,772,258
- Condo units with their own tax lots: 69

## Tax breaks

- Co-op and condo abatement, with no end date, a $94,201 credit this tax year.

## Zoning

R10 (part of the lot is R8B): floor area ratio 13.69 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 31, 2026: $1,816,425, Apt 7F
- Jun 25, 2026: $3,500,000, Apt 10A
- Apr 8, 2026: $3,650,000, Apt 4E
- May 14, 2025: $13,750,000, Apt 15E
- Jun 27, 2024: $8,175,000, Apt 9C
- May 14, 2024: $2,800,000, Apt 3G
- Mar 7, 2024: $3,600,000, Apt 2G
- Nov 16, 2023: $13,000,000, Apt 11E
- Sep 11, 2023: $11,200,000, Apt 16E
- Apr 19, 2023: $5,741,719, Apt 2B

The 10 most recent of 37 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Upper East Side Historic District (Historic District). 34 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
