# 117 East 72nd Street, Manhattan

Co-op · 20 units · built c. 1928 · Block 1407, Lot 8.

On Umarelli: https://umarelli.org/nyc/1014070008/117-east-72-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1407: https://umarelli.org/nyc/manhattan/1407.md

## Building permits

- Alteration, filed Apr 28, 2026, estimated cost $50K, described as “Interior renovation of Apt 2W on the 2nd floor. Work to include installation of new wall, new pantry doors, lighting fixtures, and associated Plumbing work that will be filed as a DOB NOW Subsequent filing. No change in use, egress, or…”
- Alteration, filed Mar 21, 2025, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 19, 2025, estimated cost $263K, described as “Perform minor interior partition demolition & construction work inconjunction with 6TH floor apartment renovation. Reconfigure kitchen, bathrooms & powder room. Install & modify closets. Relocate laundry area. Install new lighting.”
- Alteration, filed May 17, 2024, described as “Installation of temporary stair tower as per plan. No change in use, egress, or occupancy.”
- Alteration, filed Dec 22, 2023, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Nov 30, 2023, described as “Installation and use of suspended scaffold for facade repair and inspection”
- Alteration, filed Jul 31, 2023, estimated cost $28K, described as “Plumbing application filed herewith for Apartment Renovations as per drawings.”
- Alteration, filed Jul 28, 2023, estimated cost $40K, described as “General Construction for Apartment Renovations as per drawings filed herewith.”
- Alteration, filed Jul 27, 2023, estimated cost $4K, described as “Installation of temporary betamax hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 27, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 12, 2023, estimated cost $779K, described as “Filing for facade work as per plans filed herewith. No change to use, occupancy or egress.”
- Alteration, filed Apr 28, 2023, estimated cost $1K, described as “Installation of temporary roof protection as per plan. No change in use,egress or occupancy.”
- Alteration, filed Apr 28, 2023, described as “Installation of temporary sidewalk shed as per plan. No change in use,egress or occupancy”
- Alteration, filed Apr 18, 2023, estimated cost $10K, described as “Installation of temporary beta hoist as per plan. No change in use,egress or occupancy.”
- Alteration, filed Feb 23, 2023, estimated cost $117K, described as “Change in partition locations and new ceilings in apt 2W. No change to use, occupancy or egress”
- Alteration, filed Feb 9, 2023, estimated cost $5.4M, described as “This application is filed for Interior and exterior renovation including enlargement. New CO will be obtained during sign-off. No change in use, egress, or occupancy.”
- Alteration, filed Aug 15, 2019, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”

## Building history

- Alteration, filed May 18, 2015, signed off Feb 15, 2017, units 19 to 20, described as “Convert doctors office to apartment”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $10,731,150
- 2026–27 Tax: $1,164,068
- Market value (city estimate): $23,847,000
- Taxable value: $10,337,186
- Assessed land: $2,115,000
- Assessed improvements: $8,616,150

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $120,120 credit this tax year.

## Zoning

R10A: floor area ratio 9.99 built, 10.00 allowed by base zoning.

## Recent sales

- Jan 8, 2026: $3,350,000
- Jul 22, 2024: $13,276,750
- Jun 1, 2023: $4,000,000
- Jan 5, 2023: $21,000,000
- Dec 19, 2022: $3,100,000
- Oct 20, 2022: $3,950,000
- Jun 6, 2019: $5,200,000
- Apr 3, 2019: $10,000,000
- May 10, 2018: $3,400,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Upper East Side Historic District Extension (Historic District). 44 Landmarks Preservation Commission permits are on file.