# 112 East 75th Street, Manhattan

House of Worship · built 1968 · Block 1409, Lot 68.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1014090068/112-east-75-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1409: https://umarelli.org/nyc/manhattan/1409.md

## Building permits

- No Work, filed Jun 3, 2024, described as “Temporary Place of Assembly Sanctuary”
- No Work, filed Mar 12, 2024, described as “Temporary Place of Assembly Sanctuary”
- No Work, filed Nov 30, 2023, described as “Temporary Place of Assembly Sanctuary”
- No Work, filed Oct 18, 2023, described as “Temporary Place of Assembly Sanctuary”
- Alteration, filed Oct 18, 2023, estimated cost $300, described as “Install exterior non-illuminated wall sign (temple israel)”
- No Work, filed Sep 7, 2023, described as “Temporary Place of Assembly Sanctuary”
- Alteration, filed Jan 19, 2023, described as “Installation of temporary sidewalk shed as per plan. No change in use,egress or occupancy”
- No Work, filed Dec 8, 2022
- Alteration, filed Dec 1, 2022, described as “Installation of temporary pipe scaffold from ground floor and from the roof to building structure on top of the roof. As per plan. No change in use, egress or occupancy.”
- Alteration, filed Oct 19, 2022, estimated cost $1K, described as “Installation of temporary roof protection as per plan. No change in use,egress or occupancy.”
- Alteration, filed Aug 5, 2022, estimated cost $1K, described as “Installation of temporary work platform as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jun 1, 2022, estimated cost $1K, described as “Installation of temporary concrete barricade & plywood fence as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jun 1, 2022, described as “Installation of temporary plywood fence as per plan. No change in use, egress or occupancy.”
- Alteration, filed Mar 1, 2022, estimated cost $3.0M, described as “Modification to HVAC system as per plans filed herewith.”
- Alteration, filed Feb 15, 2022, estimated cost $4.4M, described as “Interior Renovation as per plans filed herewith. No change in use, egress or occupancy under this filing.”
- Alteration, filed Jan 24, 2022, estimated cost $8.3M, described as “Filing of ALT1 application for the proposed change of use of existing temple at the above captioned property.”

## Building history

- Alteration, filed Jan 27, 2004, signed off Jul 15, 2013, described as “Interior renovation in conjunction with new place of assembly layouts, change of egress and increase to exist- ing occupancy load at cellar as shown on plans filed herewith. Obtain amended c of o.”
- Alteration, filed Aug 8, 2001, plan exam - disapproved, described as “Renovate and enlarge synagogue building. Relocate non bearing partitions install shaft for new elevator.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $10,322,550
- Market value (city estimate): $22,939,000
- Taxable value: $0
- Assessed land: $4,495,500
- Assessed improvements: $5,827,050

## Tax breaks

- Nonprofit exemption (house of worship), with no end date, about $1,119,790 a year below the full tax.

## Zoning

R8B: floor area ratio 3.62 built, 4.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Upper East Side Historic District (Historic District). 21 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
