829 Park Avenue, Manhattan
Co-op · 41 units · built c. 1911 · Block 1410, Lot 69.
Building permits
- Alteration, filed Oct 30, 2026, estimated cost $703K, described as “Renovation of the existing duplex apartment 2D/3D on the 2ND and 3RD floors, including minor mechanical work and installtion of interior finishes. No change in use, egress or occupancy.”
- Alteration, filed Oct 20, 2026, described as “Industrial rope access for facade inspections. No changes in the means of egress.”
- Alteration, filed Oct 7, 2026, estimated cost $165K, described as “Interior renovation of apartment 8A, associated with the GC scope. No change in use, egress, or occupancy under this application.”
- Alteration, filed Jun 23, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Jun 18, 2025, estimated cost $187K, described as “Renovation of existing residence unit 4A, located on the 4th and 5th floors of a multiple dwelling building. architecture work type. There is to be no change of use or occupancy”
- Alteration, filed Jun 17, 2025, estimated cost $205K, described as “Interior renovation to existing Duplex Apt. #11B. Work to include non-structural demolition, general construction, and finishes. No change in egress or occupancy.”
- Alteration, filed Jun 4, 2025, estimated cost $3K, described as “Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 4, 2025, estimated cost $634K, described as “Facade repairs as per plans. No change to use, egress, or occupancy.”
- Alteration, filed May 13, 2025, estimated cost $28K, described as “Plumbing work filed in conjunction with the renovation of an existing dwelling unit as per plans. No change of use, occupancy or egress.”
- Alteration, filed May 9, 2025, estimated cost $100K, described as “Interior renovation of existing apartment 1E in the cellar level of 829 park ave - installation of new non-load bearing partitions, fixtures and finishes. No change in use, occupancy or egress. No exterior work.ms & pl to filed as…”
- Alteration, filed May 8, 2025, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 8, 2025, estimated cost $3K, described as “Installation of a temporarily shanty per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 8, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 6, 2025, estimated cost $3K, described as “Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 24, 2024, estimated cost $165K, described as “The scope of work is at ground level and includes the removal and replacement of the existing exterior north facing metal fence and service gate on east 76TH street with a new painted metal fence, service gate, & loading gate.”
- Alteration, filed Jul 18, 2024, estimated cost $44K, described as “Remove existing 5,000 gallon wrapped oil tank. No change in means of egress, use group or occupancy.”
- Alteration, filed Oct 11, 2023, estimated cost $40K, described as “Mechanical work as per plans. No change of use, egress or occupancy under this application.”
- Alteration, filed Oct 10, 2023, estimated cost $36K, described as “Plumbing work as per plans. No change of use, egress or occupancy under this application.”
- Alteration, filed Oct 10, 2023, estimated cost $266K, described as “Interior renovation of an existing duplex apartment, including minor partition changes. No change of use, egress or occupancy under this application.”
- Alteration, filed May 17, 2023, estimated cost $49K, described as “Application filed herewith for installation of new HVAC system. Filed in conjunction with Alt CO # M0799876. No change in use, egress or occupancy.”
- Alteration, filed May 17, 2023, estimated cost $35K, described as “Application filed herewith for removing/replacing/relocate of plumbing fixtures. Filed in conjunction with Alt CO #M07999876. No change in use, egress or occupancy.”
- Alteration, filed May 17, 2023, estimated cost $47K, described as “Applic. is filed to modify the exist. spr. systm for the cellar level only. New spr. heads (30 total) being installed for the proposed tenants gym, laundry rm and egress corridor. Filed in conjunc with Alt CO #M07999876. No change in use,…”
- Alteration, filed Oct 27, 2022, estimated cost $12K, described as “To file MS work. Install new HVAC Unit and obtain equipment use permits for apt 9C. No Change in use, egress or occupancy under this application.”
- Alteration, filed Oct 14, 2022, estimated cost $100K, described as “Filing for the accessory tenant's fitness room in the cellar, as per plans filed herewith. Relocate existing bathroom and relocation of interior non-bearing partitions. This application is being filed to supersede alt i applic. #101375682.”
- Alteration, filed Sep 9, 2022, estimated cost $540K, described as “Filing herewith for HVAC modifications within existing apartment 10 AC. No change in use egress or occupancy. Plumbing and architectural applications filed separately”
13 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $16,022,700
- 2026–27 tax
- $1,505,029
- Market value (city estimate)
- $35,606,000
- Taxable value
- $14,033,387
- Assessed land
- $2,965,500
- Assessed improvements
- $13,057,200
Tax breaks
- Co-op and condo abatement, with no end date, a $240,757 credit this tax year.
Zoning
R10: floor area ratio 8.82 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 4, 2026: $2,800,000
- Jul 9, 2026: $3,100,000
- Jun 25, 2026: $2,200,000
- Apr 16, 2026: $3,750,000
- Feb 11, 2026: $3,025,000
- Feb 11, 2026: $3,900,000
- Jan 8, 2025: $2,650,000
- Oct 2, 2024: $3,500,000
- Jul 10, 2023: $2,250,000
- Sep 7, 2022: $2,812,500
The 10 most recent of 20 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Upper East Side Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.