# 1334 3rd Avenue, Manhattan

Co-op · 165 units · built 1957 · Block 1411, Lot 40.

On Umarelli: https://umarelli.org/nyc/1014110040/1334-3-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1411: https://umarelli.org/nyc/manhattan/1411.md

## Building permits

- Alteration, filed Jul 23, 2026, estimated cost $20K, described as “Proposed new storefront replacement as shown on drawings. No change to occupancy use or egress.”
- Alteration, filed Jul 23, 2026, estimated cost $73K, described as “Proposed demolition and removal work limited to the selective non-load-bearing interior partitions and associated finishes to create an open tenant space for future fit-out. No change to occupancy use or egress.”
- Alteration, filed Feb 29, 2024, estimated cost $61K, described as “Renovation of unit 14J as per plans including minor partition and plumbing work. No work on facade, no change in bulk, and no work visible from the street.”
- Alteration, filed Feb 13, 2024, estimated cost $10K, described as “Plumbing work in apt. No's. 3F & 3G to be filed conjunction with application # M00944053. No change to use, egress, or occupancy.”
- Alteration, filed Dec 8, 2023, estimated cost $8K, described as “Interior renovation which includes a combination of units 4A and 4L as per tppn #3/97. Removal of kitchen in one of the units. Removal of partition between units. No change to use, egress or occupancy.”
- Alteration, filed Oct 6, 2023, estimated cost $40K, described as “Combination of apts 3F and 3G under tppn 3/97. No change to use, occupancy or egress.”
- Alteration, filed Aug 25, 2023, estimated cost $106K, described as “Interior renovation of apartment #18G on the 18 floor of a existing multi-family elevator buildings. No change in egress or occupancy.”
- Alteration, filed Aug 25, 2023, estimated cost $22K, described as “Plumbing work type in aparment 18G, submitted in conjuction with construction work #M00827681-I1”
- Alteration, filed May 24, 2023
- Alteration, filed Feb 25, 2023, estimated cost $47K, described as “Combination of apts. 18A and 18H per tpp 3/97 as shown on submitted plans. No change in occupancy, use or egress.”
- Alteration, filed Feb 24, 2023, estimated cost $5K, described as “Plumbing work in conjunction with combination of apts. 18A/18H on 18th floor. No change in occupancy, use or egress.”
- Alteration, filed Aug 18, 2022, estimated cost $18K, described as “Application filed for plumbing modifications/additions on the 1ST floor (alchemy 43) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 18, 2022, estimated cost $20K, described as “Application filed for mechanical modifications/additions on the 1ST floor (alchemy 43) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 13, 2022, estimated cost $110K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 1ST floor (alchemy 43) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 16, 2022, estimated cost $12K, described as “Install storefront awning as per plans”
- Alteration, filed May 26, 2022, estimated cost $9K, described as “Install 3 awning signs as per plans.”
- Alteration, filed Jan 26, 2022, estimated cost $3K, described as “Erect illuminated accessory business wall sign; copy reading "Citizens with Logo"”
- Alteration, filed Jan 20, 2022, estimated cost $49K, described as “Plumbing work in apt 14d”
- Alteration, filed Jan 20, 2022, estimated cost $100K, described as “Interior renovation in apt 14D”
- Alteration, filed Dec 7, 2021, estimated cost $30K, described as “Renovation of apartment 10B”
- Alteration, filed Nov 9, 2021, estimated cost $3K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Mar 10, 2020, estimated cost $15K, described as “Plumbing work at 7 a & 7 b of existing 17 story building filed here with in conjunction with job #123570643. No change in use, egress and certificate of occupancy.”
- Alteration, filed Mar 2, 2020, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 10, 2020, estimated cost $40K, described as “Herewith filing new alt 2 plumbing application, work to be preformed in existing unit 15J on the 15TH floor. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.”
- Alteration, filed Nov 20, 2019, estimated cost $50K, described as “Plumbing work in apts.8j & 8k”

4 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1014110040/1334-3-avenue.

## Property taxes

- Assessment: $28,204,200
- 2026–27 tax: $2,862,718
- Market value (city estimate): $62,676,000
- Taxable value: $26,471,504
- Assessed land: $4,095,000
- Assessed improvements: $24,109,200

## Tax breaks

- Co-op and condo abatement, with no end date, a $440,220 credit this tax year.

## Zoning

C1-9 (part of the lot is R8B): floor area ratio 12.03 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 17, 2026: $1,465,000
- Jun 11, 2026: $1,188,000
- Jun 9, 2026: $600,000
- Jun 3, 2026: $750,000
- Jan 26, 2026: $1,750,000
- Dec 17, 2025: $728,000
- Aug 27, 2025: $1,485,000
- Jul 17, 2025: $650,000
- Jul 9, 2025: $775,000
- Apr 16, 2025: $453,333

The 10 most recent of 77 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- JIM M (City Planning P1997M0686): Completed, decided Jun 13, 1997. RENEWAL-UNENCLOSED SIDEWALK CAFE WITH 20 SEATS FOR 5-YEARS

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
