# 875 Park Avenue, Manhattan

Co-op · 46 units · built c. 1912 · Block 1412, Lot 71.

On Umarelli: https://umarelli.org/nyc/1014120071/875-park-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1412: https://umarelli.org/nyc/manhattan/1412.md

## Building permits

- Alteration, filed Sep 28, 2026, estimated cost $835K, described as “Renovation of existing residential apartment 11C on 011 Floor. Work includes relocation of non-structural partitions and finishes. Mech work includes the installation of a new AC system with heat pump condensers. No change in use, egress,…”
- Alteration, filed Aug 3, 2026, estimated cost $170K, described as “Propose to perform a interior renovation work in the Apt. 9B on 9th Floor. No change in USe, Egress and occupancy.”
- Alteration, filed Jul 21, 2026, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 7, 2026, estimated cost $45K, described as “Interior renovation of existing bathroom in apartment 5AB on the 005 floor. No change in use, occupancy, or egress.”
- Alteration, filed Jun 30, 2026, estimated cost $380K, described as “Interior renovation of unit 9C including removal and installation of partitions as per plans and installation of condenser and air handlers. No change in use, egress, or occupancy”
- Alteration, filed Jun 17, 2026, described as “Installation of suspended scaffold for facade inspection/repair.”
- Alteration, filed Jun 11, 2026, estimated cost $150K, described as “Limited facade restorations as per plans filed. No change in occupancy, use or egress.”
- Alteration, filed Sep 25, 2024, estimated cost $36K, described as “Temporary shoring work as per plans. No change in occupancy, use or egress.”
- Alteration, filed Mar 29, 2024, estimated cost $132K, described as “General demolition, construction, & electrical modifications to the ninth floor apartment #9E in this 13 story elevator building as shown on plans. No change in structure, egress or use.”
- Alteration, filed Mar 14, 2024, estimated cost $36K, described as “Renovate existing bathroom in apartment 5C; work to include removing and installing non-bearing partition work and finishes. No change to use, egress or occupancy.”
- Alteration, filed Mar 22, 2023, estimated cost $1K, described as “Filing to establish the previous combination of units 8A/B as per construction work completed/signed off under Alt. 102886254. Please refer to scope of work on plans as well as comments section on PW1. No change to use, egress or occupancy…”
- Alteration, filed Apr 28, 2022, estimated cost $75K, described as “New split system HVAC. Install Six (6) Air Handling Units and related piping within Apt 5C, and One (1) Heat Pump mounted on a stand in the Exterior Rear Yard. No change in Use, Egress or Occupancy.”
- Alteration, filed Apr 15, 2022, estimated cost $60K, described as “Proposed construction work in dwelling unit 9B in connection with separation from merged dwelling units 9AB.restore unit 9B to its original condition (restore kitchen) and replace existing ac unit with new air conditioning and air handler…”
- Alteration, filed Jan 30, 2022, estimated cost $55K, described as “Proposed construction work in dwelling unit 9B in connection with separation from merged dwelling units 9AB.restore unit 9B to its original condition (restore kitchen)minor plumbing and electrical no change in use,egress or occupancy”
- Alteration, filed Nov 19, 2021, estimated cost $45K, described as “Plumbing modifications to apartment 11A as shown per plans filed herewith. Filed in conjuction with DOB now interior gc/ms application M00585875 and exterior gc application M00585904. No change in egress, occupancy, or use.”
- Alteration, filed Nov 18, 2021, estimated cost $20K, described as “New exterior openings for louver install to apartment 11A as shown per plans filed herewith. Filed in conjunction with DOB now interior gc/ms application M00585875 and plumbing application M00585891. No change in egress, occupancy, or use.”
- Alteration, filed Nov 18, 2021, estimated cost $215K, described as “Interior renovation and mechanical modifications of apartment 11A as shown per plans filed herewith. Filed in conjuction with DOB now exterior gc application M00585904 and plumbing application M00585891. No change in egress, occupancy, or…”
- Alteration, filed Apr 16, 2021, estimated cost $157K, described as “Interior renovation of existing kitchen in apartment 5C on floor 005. Architectural work. There is to be no change of use, occupancy, or egress.”
- Alteration, filed Apr 16, 2021, estimated cost $6K, described as “Installation and modification of plumbing fixtures at existing apartment 5C on floor 005. Plumbing work. There is to be no change of use, occupancy, or egress.”
- Alteration, filed Apr 16, 2021, estimated cost $15K, described as “Interior renovation of existing kitchen. Addition of exhaust duct to exterior. Mechanical work. There is to be no change of use, occupancy or egress.”
- Alteration, filed Mar 4, 2021, estimated cost $500K, described as “Filing interior renovation in existing residential apartment 6B as per plan filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Mar 4, 2021, estimated cost $150K, described as “Filing modification of existing mechanical system as per plan filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Mar 4, 2021, estimated cost $100K, described as “Filing modification of existing plumbing system for renovation of residential apartment 6B as per plan filed herewith. No change in use, egress, and occupacny.”
- Alteration, filed Mar 3, 2021, estimated cost $20K, described as “Installation of beta max material hoist operated within pipe scaffold tower as per plan and in accordance with chapter 33 of NYC 2014 Building code. No change in use, egress or occupancy”
- Alteration, filed Jan 27, 2021, estimated cost $32K, described as “New chimney flue for unit 3D, no change in occupancy, use or egress.”

6 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1014120071/875-park-avenue.

## Property taxes

- Assessment: $24,232,500
- 2026–27 tax: $2,351,217
- Market value (city estimate): $53,850,000
- Taxable value: $21,675,070
- Assessed land: $4,135,500
- Assessed improvements: $20,097,000

## Tax breaks

- Co-op and condo abatement, with no end date, a $345,126 credit this tax year.

## Zoning

R10: floor area ratio 10.35 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jul 15, 2026: $5,275,000
- Jun 18, 2026: $3,537,500
- Jun 10, 2026: $3,600,000
- Feb 18, 2026: $2,850,000
- Jun 3, 2025: $5,350,000
- Feb 14, 2024: $3,900,000
- Dec 28, 2023: $1,967,150
- Jun 20, 2023: $5,550,000
- Feb 23, 2023: $11,500,000
- Jun 29, 2022: $8,550,000

The 10 most recent of 19 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Upper East Side Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
