# 136 East 79th Street, Manhattan

Co-op · 26 units · built c. 1929 · Block 1413, Lot 57.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1014130057/136-east-79-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1413: https://umarelli.org/nyc/manhattan/1413.md

## Building permits

- Alteration, filed Oct 12, 2026, estimated cost $5K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 27, 2026, estimated cost $3K, described as “Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 17, 2026, estimated cost $50K, described as “Exterior work modification of existing openings and one window replacement. No change to use, egress or occupancy.”
- Alteration, filed Jun 4, 2026, described as “Installation of a suspended scaffold for facade inspection and repair as per plan submitted”
- Alteration, filed Apr 24, 2026, estimated cost $245K, described as “Renovation of the of an existing apartment#4B on the 4th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Feb 23, 2026, estimated cost $188K, described as “Masonry and facade restoration as indicated on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jan 30, 2026, estimated cost $285K, described as “Renovation of the of an existing apartment#8A on the 8th floor. Work includes non-structural demolition, general construction and new opening as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jan 20, 2026, estimated cost $4K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 17, 2025, described as “Installation of a suspended scaffold for facade repair/inspection as per plan submitted.”
- Alteration, filed Apr 18, 2025, estimated cost $200K, described as “Work in includes interior and exterior general construction work in Apt 6b, as well as partial demolition to create openings for mechanical units in the exterior wall. No change to egress, use, or occupancy.”
- Alteration, filed Mar 26, 2025, estimated cost $400K, described as “Renovation of apt. 6A to include removal and installation of partitions, doors, flooring and finishes. Bricking up of an existing exterior opening. Exterior work for new kitchen exhaust. No change to use, egress, or occupancy is involved.”
- Alteration, filed May 7, 2024, estimated cost $30K, described as “Installation of mechanical systems in apartment 5B on the fifth floor. No change in use egress or occupancy.”
- Alteration, filed Feb 2, 2022, estimated cost $10K, described as “Connect gas cooktop on existing roughing as per plans to separate apts. 10A & 10B previously combined under DOB application#: 120760042. Gc work filed under job# M00668447-I1. No change in use, egress or occupancy under this application”
- Alteration, filed Feb 2, 2022, estimated cost $10K, described as “Infill opening between apartments 10A & 10B to re-create two separate apartments previously combined under DOB application#: 120760042. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 22, 2021, estimated cost $267K, described as “Facade repairs as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Nov 30, 2020, estimated cost $20K, described as “Proposed installation of a temporary sidewalk shed at the street level and supported scaffold at roof level. Work shall comply with 2014 building codes, chapter 33. No changes in use, egress, or occupancy.”

## Property taxes

- Assessment: $14,097,600
- 2026–27 Tax: $1,408,012
- Market value (city estimate): $31,328,000
- Taxable value: $13,298,670
- Assessed land: $1,642,500
- Assessed improvements: $12,455,100

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $245,893 credit this tax year.

## Zoning

R10A: floor area ratio 11.53 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Mar 30, 2026: $3,680,000
- Mar 26, 2026: $4,600,000
- Mar 5, 2026: $2,050,000
- Jan 30, 2026: $5,600,000
- Aug 27, 2025: $9,900,000
- Aug 1, 2025: $3,650,000
- Jun 2, 2025: $4,750,000
- Feb 6, 2025: $3,862,500
- Feb 3, 2025: $2,000,000
- Oct 13, 2023: $4,050,000

The 10 most recent of 14 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
