# 124 East 79th Street, Manhattan

Condominium · 66 units · built 1985 · Block 1413, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1014137501/124-east-79-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1413: https://umarelli.org/nyc/manhattan/1413.md

## Building permits

- Alteration, filed Oct 8, 2025, estimated cost $239K, described as “General construction is proposed in the existing unit #14A/B on the 14th floor. Subsequent plumbing application to be filed. All per submitted plans. No changes to use, egress, or occupancy under this application.”
- Alteration, filed Mar 24, 2025, estimated cost $105K, described as “Install replacement split ac system to serve apartment 9D as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 13, 2025, estimated cost $256K, described as “Apartment 10BD renovation as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Oct 9, 2024, estimated cost $3K, described as “Filing for plumbing fixture renovations as per apartment combination of 10BD. No change in use, egress or occupancy.”
- Alteration, filed Feb 1, 2024, estimated cost $132K, described as “Combination of apartments # 2A and 2B under tppn #3/97. Demolition of interi or partition, install new partition, and mechanical system as shown on plans. No change to use, egerss or occupancy”
- Alteration, filed Apr 13, 2023, estimated cost $125K, described as “Install replacement split ac system as per plans. Install two (2) replacement exhaust fans on roof. No change in use, egress or occupancy.”
- Alteration, filed Jan 3, 2023, estimated cost $8K, described as “Install a new washer and electric dryer in an existing closet at APt 5E as per plans , no change in use, egress or occupancy”
- Alteration, filed Nov 2, 2022, estimated cost $700K, described as “Facade repairs. No change to use, occupancy or egress.”
- Alteration, filed Oct 24, 2022, estimated cost $213K, described as “Filing herewith to replace the roof. No change to use, occupancy or egress.”
- Alteration, filed Jul 26, 2022, estimated cost $12K, described as “Installation of heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 26, 2021, estimated cost $15K, described as “Combination of apartments 15A, 15B and 15F on 15th floor, as per TPPN #3/97. Plumbing work done under application 101570701 permitted and signed off. Electeric stoves to be removed in 2 apartments.”
- Alteration, filed May 21, 2021, estimated cost $10K, described as “Combination of units 12C and 12D. Remove/replace non-bearing partitions to join units 12C and d. No change to use, egress or occupancy as per directive 14 of 1975.”
- Alteration, filed Aug 13, 2020, estimated cost $16K, described as “Plumbing work associated with interior renovation. Installation of new fixtures and replacing other fixtures. No change in use, egress or occupancy”
- Alteration, filed May 25, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $14,677,197
- 2026–27 Tax: $1,371,603
- Market value (city estimate): $32,615,989
- Taxable value: $12,519,895
- Assessed land: $2,708,994
- Assessed improvements: $11,968,203
- Condo units with their own tax lots: 66

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $138,104 credit this tax year.

## Zoning

R10A: floor area ratio 9.37 built, 10.00 allowed by base zoning.

## Recent sales

- Jun 25, 2025: $3,850,000, Unit PHB
- Jun 20, 2025: $2,100,000, Apt 8D
- May 28, 2025: $790,000, Apt 7A
- May 28, 2025: $1,130,000, Apt 14A
- Jan 8, 2025: $2,550,000, Apt 10B, sold with other lots
- Jun 20, 2024: $990,000, Apt 5B
- Dec 21, 2023: $1,795,000, Apt 6D
- May 2, 2023: $500,000, Apt 2A
- May 2, 2023: $800,000, Apt 2B
- Jan 19, 2023: $735,000, Apt 3A

The 10 most recent of 32 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- C-O-P (City Planning P1993M0174): Completed, decided Oct 1, 1993. DISPOSITION OF AN UNOCCUPIED CONDO STUDIO APT IN A 22-STORY\*BLDG (1 PARCEL)
- THE BELGRAVIA (City Planning P1985M0992): Completed, decided Nov 21, 1985. CHAIRMAN'S CERT OF AMENDMENT TO NEIGHBORHOOD IMPROVEMENT\*PROGRAM PURS TO SPEC PERMIT FOR HOUSING QUALITY C840213ZSM
- 124-130 E79TH ST (City Planning P1984M0183): Completed, decided Jul 25, 1984. SPEC PERM (ZR74-95-HOUSING QUALITY) TO CONST A 21 STORY\*BLDG W/67 UNITS

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
