# 1071 3rd Avenue, Manhattan

Co-op · 131 units · built 1963 · Block 1418, Lot 1.

On Umarelli: https://umarelli.org/nyc/1014180001/1071-3-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1418: https://umarelli.org/nyc/manhattan/1418.md

## Building permits

- Alteration, filed Oct 12, 2026, estimated cost $60K, described as “General construction taking place at Unit 14D, removal of the existing floors, kitchen, bathroom and related finishes. Installation of the new Kitchen cabinets, flooring, bathroom floors, tiles, painting and related finishes. No change in…”
- Alteration, filed Aug 12, 2026, estimated cost $260K, described as “Proposed replacement of 2ND floor roof over parking garage as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 31, 2026, estimated cost $145K, described as “Garage repairs as per plans filed herewith. Includes repairs to correct ecb violation 35084363H. No change in use, egress or occupancy”
- Alteration, filed Apr 8, 2024, estimated cost $63K, described as “Dividing one (1) dwelling unit into two (2) dwelling units. No change to use or bulk.”
- Alteration, filed Aug 11, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 31, 2023, estimated cost $210K, described as “Renovation of apartment#5D,E on the fifth floor. work to include non-structural demolition, general construction and mechanical work. No change to use, egress or occupancy.”
- Alteration, filed May 22, 2023
- Alteration, filed Mar 24, 2023, estimated cost $135K, described as “Interior renovation to include demolition of existing and construction of new partitions and finishes as shown on plans in apartment 17D (16th Floor construction/17th Floor marketing). No change in use, egress, or occupancy.”
- Alteration, filed Mar 24, 2023, estimated cost $20K, described as “Work to include plumbing modifications as shown on plans. No change in use, egress or occupancy under this application.”
- Alteration, filed May 9, 2022, estimated cost $5K, described as “Bathroom renovation as indicated on drawings.”
- Alteration, filed May 9, 2022, estimated cost $5K, described as “Bathroom renovation as indicated on drawings.”
- Alteration, filed Aug 27, 2021, estimated cost $41K, described as “Interior renovation at apt. 6H, partition & plumbing work. No change in use egress or occupancy.”
- Alteration, filed Aug 27, 2021, estimated cost $10K, described as “Plumbing work in connection with job#: M00560544-I1.”
- Alteration, filed May 25, 2021, estimated cost $93K, described as “Exterior Facade Restoration as per Plans Filed Herewith. No Change in Use, Egress or Occupancy”
- Alteration, filed Apr 20, 2021, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 27, 2021, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 11, 2020, estimated cost $15K, described as “Plumbing work in connection with DOB#: 140963330.”
- Alteration, filed Feb 19, 2020, estimated cost $15K, described as “Plumbing work related to bathroom renovation in apartment 4F. No change to use, egress or occupancy.”
- Alteration, filed Nov 25, 2019, estimated cost $9K, described as “Replace fixtures on existing roughing. no change in use egress or occupancy.”

## Property taxes

- Assessment: $20,840,850
- 2026–27 tax: $2,090,645
- Market value (city estimate): $46,313,000
- Taxable value: $19,109,940
- Assessed land: $3,515,850
- Assessed improvements: $17,325,000

## Tax breaks

- Co-op and condo abatement, with no end date, a $287,728 credit this tax year.

## Zoning

C1-9 (part of the lot is R8B): floor area ratio 12.14 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jul 30, 2026: $450,000
- Jan 29, 2026: $400,000
- Jan 28, 2026: $538,000
- Sep 9, 2025: $265,000
- Aug 5, 2025: $492,000
- Jul 10, 2025: $770,000
- Jun 25, 2025: $775,000
- Jan 23, 2025: $1,400,000
- Oct 30, 2024: $1,150,000
- Sep 26, 2024: $475,000

The 10 most recent of 60 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
