# 1131 3rd Avenue, Manhattan

Co-op · 256 units · built 1961 · Block 1421, Lot 1.

On Umarelli: https://umarelli.org/nyc/1014210001/1131-3-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1421: https://umarelli.org/nyc/manhattan/1421.md

## Building permits

- Alteration, filed Mar 17, 2026, estimated cost $261K, described as “Interior alteration of existing dwelling unit 20M. No change of use, egress or occupancy”
- Alteration, filed Jun 2, 2025, estimated cost $33K, described as “Combination of apts 20H and 20K on the 19TH floor under tppn 3/97 filed in conjunction with DOB now pl no change to use, occupancy or egress.”
- Alteration, filed Jan 15, 2025, estimated cost $51K, described as “Interior renovation of apartment 15L as per plans filed herewith, to replace job 103147587 and resolve pswo. Plumbing laa filed under M01159094-I1.”
- Alteration, filed Jan 6, 2025, estimated cost $981K, described as “Installation of new modular electric chillers/heat recovery heat Pumps in sub-cellar 1 (SC1). No change to use, egress, or occupancy.”
- Alteration, filed Jun 19, 2024, estimated cost $438K, described as “Installation of new boilers”
- Alteration, filed Dec 5, 2023, described as “Facade restoration/inspection”
- Alteration, filed Jun 15, 2023, estimated cost $25K, described as “Plumbing work in apt 15HJ (floor 015) as per plans. No change in use,bulk, occupancy or egress. Gc application: M00874959.”
- Alteration, filed Jun 15, 2023, estimated cost $133K, described as “Interior renovation of apt 15HJ (floor 015). No change in use, bulk, occupancy or egress.”
- Alteration, filed May 17, 2023, estimated cost $5K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 1, 2022, estimated cost $21K, described as “Bath#1-Rel tub to bath#3. Rel LAV, Replace WC. Bath #2-Rep tub, WC & LAV. Bath#3-Install relocated tub from bath#1, relocate WC & LAV. Kitchen-replace sink, DW. Relocate gas cooking equip. As per plans filed herewith. No change of use,…”
- Alteration, filed Jan 30, 2022, estimated cost $13K, described as “Replace, relocate and add plumbing fixtures as per schedule b and plans filed herewith. No change, etc.”
- Alteration, filed Jan 30, 2022, estimated cost $123K, described as “Combination of existing apartments 8F & 8G, to comply wth tppn 03/97. Renovation to include minor removal and installation of non load bearing interior partitions and finishes. No change in use, egress or occupancy.”
- Alteration, filed Jan 28, 2022, estimated cost $145K, described as “Renovation of an existing class A apartment. Combination of apartments 19M and 19N. As per plans filed herewith. No change of use, egress, or occupancy.”
- Alteration, filed Jul 16, 2021, estimated cost $401K, described as “Relocate existing boiler within boiler room, Reconnect boilers to existing breeching upstream of draft fan, and relocate an existing supply air fan within the boiler room.”
- Alteration, filed Apr 26, 2021, estimated cost $1K, described as “Plumbing filing in conjunction with ALT2 application M00476568. No change in use, egress, or occupancy.”
- Alteration, filed Apr 26, 2021, estimated cost $55K, described as “Alteration type 2 for apartment 15E for interior renovation work filed in conjunction with plumbing application #M00476430.”
- Alteration, filed Jun 26, 2020, estimated cost $13K, described as “Modifications to the existing sprinkler system on the 1st floor (Nike) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jun 26, 2020, estimated cost $30K, described as “Modifications to the existing HVAC system on the 1st floor (Nike) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Nov 20, 2019, estimated cost $9K, described as “Plumbing modifications associated with combination of Apartments 2F and 2G as per TPPN 3/97 as per plans submitted herewith. No Change in use, egress, or occupancy under this application.”
- Alteration, filed Jul 18, 2019, estimated cost $4K, described as “Cap and remove 1 gas stove. No change in use, egress, or occupancy.”

## Property taxes

- Assessment: $44,183,250
- 2026–27 tax: $4,502,217
- Market value (city estimate): $98,185,000
- Taxable value: $40,475,662
- Assessed land: $3,987,000
- Assessed improvements: $40,196,250

## Tax breaks

- Co-op and condo abatement, with no end date, a $543,852 credit this tax year.

## Zoning

C1-9: floor area ratio 15.59 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 10, 2026: $650,000
- Aug 20, 2026: $535,000
- Jul 30, 2026: $599,000
- Jul 16, 2026: $649,000
- Jun 2, 2026: $1,100,000
- Apr 30, 2026: $670,000
- Mar 11, 2026: $960,000
- Mar 11, 2026: $437,000
- Feb 3, 2026: $600,000
- Jan 28, 2026: $864,000

The 10 most recent of 115 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or special permit (Board of Standards and Appeals 78-15-BZ): Variance or special permit, Granted, filed Apr 9, 2015, decided Oct 27, 2015. Special Permit (§73-36) to permit the operation of a Physical Culture Establishment (Crunch Fitness) on the first floor and sub- cellar of a twenty one (21) story mixed-use building. C1-9 zoning district.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
