200 East 69th Street, Manhattan
Condominium · 275 units · built 1950 · Block 1423, Lot 7501.
Building permits
- Alteration, filed Oct 16, 2026, estimated cost $70K, described as “Remodel existing kitchen and suspended ceiling, no change in occupancy use or egress”
- Alteration, filed Mar 6, 2026, estimated cost $5K, described as “Replacement of Fan-coil unit in the cellar. Existing ductwork to remain. No change in use egress and occupancy.”
- Alteration, filed Feb 5, 2026, estimated cost $225K, described as “Filing herewith structural work on existing roof. No change in use, occupancy or egress.”
- Alteration, filed Feb 4, 2026, estimated cost $800K, described as “Filing herewith plumbing work on existing roof. No change in use, occupancy or egress.”
- Alteration, filed Feb 4, 2026, estimated cost $1.5M, described as “Filing herewith mechanical work on existing roof. No change in use, occupancy or egress.”
- Alteration, filed Oct 9, 2025, described as “IRA to assist with Condition Assessment”
- Alteration, filed Sep 22, 2025, estimated cost $96K, described as “Interior renovations to create a Boiler room on the Mezz level for tenant space (Whole Food Market). No change in occupancy, use or egress.”
- Alteration, filed Jul 28, 2025, estimated cost $24K, described as “Renovation of finishes in existing bedroom & bathroom. No changes to use, occupancy or egress”
- Alteration, filed Jun 11, 2025, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Feb 28, 2025, estimated cost $20K, described as “8936 - Extending existing elevator shaft to accommodate larger cab. No change in egress use group or occupancy. Pro Cert Requested.”
- Alteration, filed Jan 3, 2025, estimated cost $309K, described as “Interior renovation to include partitions, ceiling, doors, and finishes as shown on drawings filed herewith. No change to occupancy, use, or egress.”
- Alteration, filed Sep 4, 2024, estimated cost $250K, described as “General construction related to the gas infrastructure replacement in cellar. No change in egress or occupancy. Work to be completed in conjunction with M01087573.”
- Alteration, filed Sep 4, 2024, estimated cost $250K, described as “General construction in relation to gas infrastructure replacement in cellar, ground floor, second floor, and third floor. No change in egress or occupancy. Work to be completed in conjunction with M01101663.”
- Alteration, filed Jul 31, 2024, estimated cost $30K, described as “Propose modification of an existing sprinkler system on the 1st Floor and Mezzanine at 1175 Third Avenue NY NY all as per plans herewith filed. No change in use, egress, or occupancy filed under this application.”
- Alteration, filed Jul 24, 2024, described as “Installation of temporary custom color sidewalk shed as per plan. No change in use, egress or occupancy”
- Alteration, filed May 30, 2024, described as “Non-illuminated non-advertising double-face projecting accessory - five below. No change of use, egress or occupancy.”
- Alteration, filed May 21, 2024, estimated cost $2K, described as “Illuminated non-advertising accessory wall sign on existing louvers - five below. No change of use, egress or occupancy.”
- Alteration, filed May 21, 2024, described as “Non-illuminated non-advertising double-face projecting accessory - five below. No change of use, egress or occupancy.”
- Alteration, filed May 21, 2024, estimated cost $2K, described as “Illuminated non-advertising accessory sign on existing marquee - five below. No change of use, egress or occupancy.”
- Alteration, filed Apr 30, 2024, estimated cost $45K, described as “Five below-- plumbing installations and modifications for retail renovation.”
- Alteration, filed Apr 30, 2024, estimated cost $200K, described as “Five below-- mechanical modifications and installations in conjunction with retail renovation.”
- Alteration, filed Apr 30, 2024, estimated cost $506K, described as “Five below-- general construction inclusive of interior partitions modifications for retail renovation. No change to use, egress, or occupancy.”
- Alteration, filed Apr 29, 2024, estimated cost $70K, described as “Filing herewith for sprinkler modifications as per plans submitted. No change in egress, use, or occupancy.”
- Alteration, filed Mar 26, 2024, estimated cost $1.5M, described as “Interior renovation to include partitions, ceiling, doors, and finishes as shown on drawings. No change to occupancy, use, or egress.”
- Alteration, filed Mar 22, 2024, estimated cost $385K, described as “Interior renovation and combination of existing apartments 46A and 46B. Work to include non-structural demolition, general construction, and finishes. Apartments combined in compliance with TPPN 3/97. No change in use, egress & occupancy.”
24 more, older permits are in this building’s full list on the map.
Building history
- Major Renovation — Conversion, filed Jun 27, 1995, signed off Jun 20, 1996, 283 units added, 54 stories, described as “Plans & applications filed to combine ap ts. #20A & 20C on the 19TH floor only. All proposed construction ch anges filed on separate type 2 appl.”
- Alteration, filed Jul 8, 1993, permit issued - entire job/work, described as “Create new supermarket at cellar, first and mezzanine, obtain amended c of o.”
- Major Renovation — Conversion, filed Dec 2, 1992, plan exam - approved, 279 units added, 54 stories, described as “Obtain amended c. Of o. All work was per formed under separate appl. No work.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $79,000,838
- 2026–27 Tax
- $8,559,014
- Market value (city estimate)
- $175,557,463
- Taxable value
- $75,020,045
- Assessed land
- $14,091,719
- Assessed improvements
- $64,909,119
- Condo units with their own tax lots
- 408
Tax breaks
- Co-op and Condo Abatement, with no end date, a $542,485 credit this tax year.
Zoning
R8B (part of the lot is C1-9): floor area ratio 8.69 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 22, 2026: $1,275,000, Apt 7B
- Aug 20, 2026: $1,250,000, Apt 16E
- Jul 1, 2026: $3,700,000, Apt SU107, sold with other lots
- Jun 26, 2026: $2,238,000, Apt 29B
- Jun 18, 2026: $695,000, Apt 2R
- Jun 15, 2026: $1,170,000, Apt 17E
- Jun 11, 2026: $19,000, Apt SRU85
- Mar 27, 2026: $530,000, Apt T5B
- Mar 13, 2026: $2,250,000, Apt SRU47, sold with other lots
- Feb 24, 2026: $545,000, Apt 8F
The 10 most recent of 162 open-market sales since 2016, from the Department of Finance’s sales files.