# 200 East 75th Street, Manhattan

New or merged lot · Block 1429, Lot 45.

The city hasn’t published tax or zoning records for this lot yet; new and merged lots usually appear within a few months.

On Umarelli: https://umarelli.org/nyc/1014290045/200-east-75-street

## Building permits

- New Building — Mid-Rise, filed May 9, 2022, 35 units, 18 stories, described as “HUB Consultation on 4/22 (under 200 East 75th Street Address). Please assign to HUB examiner. New 18-story building.”
- Alteration, filed Oct 19, 2026, described as “Window and frame Inspection”
- Alteration, filed Oct 5, 2026, estimated cost $4K, described as “Erect illuminated accessory business wall sign for jo malone.”
- Alteration, filed Oct 5, 2026, estimated cost $5K, described as “Erect illuminated accessory business wall sign for jo malone on w. 75TH st elevation.”
- Alteration, filed Jun 3, 2026, estimated cost $250K, described as “General Construction work as shown on plans”
- Alteration, filed Mar 4, 2026, estimated cost $184K, described as “Install (5) new gas fired f/places with (5) new flues up to roof, direct vent. (1) f/place flue 1ST fl ground amenities room, direct vent. (1) f/place flue outdoor unit amenities courtyard, direct vent. All in conj with NB, gas fired under…”
- Alteration, filed Jun 2, 2025, estimated cost $2K, described as “Temporary trolley beam system as per drawings. Trolley beam shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 11, 2025, described as “Temporary suspended scaffold as per drawings during NB const, filed sep. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 12, 2024, estimated cost $2K, described as “Temporary pipe scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Feb 5, 2024, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Jul 31, 2023, estimated cost $1K, described as “Installation and use of temporary material platform as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed May 19, 2023, estimated cost $3K, described as “Temporary scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed May 8, 2023, estimated cost $10K, described as “Heavy duty sidewalk shed during NB const, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 25, 2023, estimated cost $20K, described as “Installation of dual 7000# capacity personnel/material hoists during NB filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elev appl sub to elev dept.”
- Alteration, filed Jan 10, 2023, estimated cost $4K, described as “Installation of construction fence as per drawings during NB const, filed sep. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Fence installed on sw/rdwy. Dot permits…”
- Alteration, filed Oct 6, 2022, estimated cost $5K, described as “Installation of debris chute to be installed in accordance to approved DM plans.”
- Alteration, filed Feb 9, 2022, estimated cost $5K, described as “Installation of 300PSF sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2014 code no change in use, egress or occupancy under this application.”
- Alteration, filed Jun 30, 2021, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2014 code. No change inuse, egress or occupancy under this application.”
- Alteration, filed Jun 30, 2021, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence shall comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Jun 30, 2021, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence shall comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Jun 30, 2021, estimated cost $8K, described as “Installation of 300 psf sidewalk shed & pipe scaffolding as per plans. Sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed May 4, 2021, estimated cost $25K, described as “Interior demolition of 5 story with cellar masonry building. There is no change to use, egress, occupancy, or fire protection.”
- Alteration, filed May 4, 2021, estimated cost $24K, described as “Interior demolition of 4 story with penthouse masonry building. There is no change to use, egress, occupancy, or fire protection.”

## In the news

[200 East 75th Street Wraps Up Construction on Manhattan’s Upper East Side](https://newyorkyimby.com/2025/10/200-east-75th-street-wraps-up-construction-on-manhattans-upper-east-side.html), New York YIMBY, Oct 25, 2025.