# 210 East 77th Street, Manhattan

Private School · built c. 1927 · Block 1431, Lot 41.

On Umarelli: https://umarelli.org/nyc/1014310041/210-east-77-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1431: https://umarelli.org/nyc/manhattan/1431.md

## Building permits

- Alteration, filed Jun 24, 2025, estimated cost $45K, described as “Herewith filing plumbing work as per plans. No change in use, egress or occpancy”
- Alteration, filed Oct 12, 2022, estimated cost $209K, described as “Local law 11 repairwork as per plans filed herewith. No change to use, group, or occupancy. Plans for a sidewalk shed are being filed separately for this project.”
- Alteration, filed Sep 21, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Aug 8, 2019, estimated cost $13K, described as “Modification to sprinkler work as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 28, 2018, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”

## Building history

- Alteration, filed May 4, 2011, permit issued - entire job/work, described as “Filing herewith alteration type one application to amend the occupant load on the cellar level lunch room.”
- Alteration, filed Nov 24, 2003, signed off Feb 14, 2007, described as “Filing to enclose exist. Yard at cellar level, enlarging auditorium over yard below at first floor, enlargin g 2ND and 9TH floors, reconfiguring classrooms at 7TH floor. Addition of 10 th, 11TH, penthouse and roof floors, all as per plans…”
- Alteration, filed Jun 30, 1999, plan exam - disapproved, described as “Construction of two additional stories, new partitions, walls, ceilings, windows doors as shown on drawings filed herewith.”
- Alteration, filed Jun 13, 1996, permit issued - entire job/work, described as “No work performed under this application . Change description of use on the 9TH floor "classrooms, sundeck" to "classrooms, outdoor recreation area".”
- Alteration, filed Aug 7, 1991, permit issued - entire job/work, described as “No work to be done;application filed for change of use only. (clr office and classroom use changed to lunchroom use; first floor lunchroom use changed to auditorium use).”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $7,505,550
- Market value (city estimate): $16,679,000
- Taxable value: $0
- Assessed land: $2,092,500
- Assessed improvements: $5,413,050

## Tax breaks

- Nonprofit exemption (college or university), with no end date, about $814,202 a year below the full tax.

## Zoning

R8B: floor area ratio 6.33 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Change to an Earlier Grant (Board of Standards and Appeals 144-00-BZII): Change to an Earlier Grant, Granted, filed Jan 28, 2004, decided Apr 13, 2004. Amendment of a previously approved variance to permit the enlargement of an existing school, which increased the degree of non compliances with respect to floor area, lot coverage, height, setbacks and side yard. The amendment seeks to…
- Variance or Special Permit (Board of Standards and Appeals 144-00-BZ): Variance or Special Permit, Granted, filed May 25, 2000, decided Sep 12, 2000. Variance (§72-21) to permit the proposed expansion of an existing school building (Use Group 3) within an R8B zoning district, creating non-compliance with the side and front yards, floor area ratio, lot coverage and height of building,…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
