# 208 East 79th Street, Manhattan

Utility · Block 1433, Lot 40.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1014330040/208-east-79-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1433: https://umarelli.org/nyc/manhattan/1433.md

## Building permits

- Alteration, filed Sep 15, 2025, estimated cost $2.1M, described as “Tear off roof replacement project, replace with siplast roofing system as shown on drawings. Installation of optim-r insulation panel with r value=33. Installation of ballast pavers above new roofing system. No change in use, egress or…”
- Alteration, filed Sep 15, 2025, estimated cost $179K, described as “Tear off roof replacement project, replace with siplast roofing system as shown on drawings. Installation of optim-r insulation panel with r value=33. Installation of ballast pavers above new roofing system. No change in use, egress or…”
- Alteration, filed Aug 27, 2025, estimated cost $5K, described as “Installation of a temporary construction fence enclosure as per plans. No change in use, egress or occupancy. Fence enclosure installed in accordance with 2022 NYC DOB code, chapter 33.”
- Alteration, filed Jul 31, 2025, estimated cost $10K, described as “Installation of temporary supported scaffold for betamax hoist as per plans during general construction work. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Jul 28, 2025, estimated cost $10K, described as “Installation of a heavy duty sidewalk shed as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Jan 9, 2025, estimated cost $15K, described as “Additions/Modifications to existing sprinkler system. No change to use, egress, or occupancy.”
- Alteration, filed Dec 4, 2024, estimated cost $5K, described as “Installation of a temporary scaffold as per plans in conjunction with general construction. No change in use, egress or occupancy. Scaffold to comply with 2022 NYC building code, chapter 33.”
- Alteration, filed Oct 8, 2024, estimated cost $1K, described as “Installation of temporary roof protection as per plan. No change in use, egress or occupancy.”
- Alteration, filed Sep 10, 2024, described as “Installation of suspended scaffold for facade inspection /repair. SR23/0869”
- Alteration, filed Sep 4, 2024, estimated cost $500K, described as “General construction in conjunction with installation of new chillers and air conditioning units under subsequent mechanical application. No change to use, egress, or occupancy.”
- Alteration, filed Jun 7, 2023, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Apr 10, 2023, estimated cost $365K, described as “Facade restoration including facebrick and lintel replacement as well as pointing of mortar joints, recaulking, window sill repalcement and limestone patching as per plans submitted here with. Nochange in use, egress or occupancy.”
- Alteration, filed Oct 11, 2022, estimated cost $470K, described as “Construction and finish work in support of ats replacement in cellar.”
- Alteration, filed Jun 27, 2022, described as “Installation of temporary plywood fence as per plan. No change in use, egress or occupancy.”
- Alteration, filed May 9, 2022, estimated cost $248K, described as “2nd Floor Mechanical Upgrade.”
- Alteration, filed May 3, 2022, estimated cost $141K, described as “Installation of concrete housekeeping pad, curbs, and wall penetrations in support of mechanical equipment upgrade at second floor.”
- Alteration, filed Feb 15, 2022, estimated cost $1K, described as “Installation of temporary plastic barricade as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jun 30, 2021, described as “Pipe scaffold proposed installation of pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jun 30, 2021, described as “Sidewalk shed proposed installation of sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Mar 1, 2021, estimated cost $1.1M, described as “Partial stairwell enclosure reconstruction as per plans submitted herewith. Welding of rebar reinfircing welding to existing beams for the new proposed concrete blocks. No change in use, occupancy or egress.”
- Alteration, filed Feb 13, 2019, estimated cost $56K, described as “Installation of heavy duty sidewalk shed during building alteration, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 17, 2018, estimated cost $56K, described as “Installation of heavy duty sidewalk shed during building alteration, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”

## Zoning

R10A: floor area ratio 0.00 built, 10.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology