# 333 East 66th Street, Manhattan

Co-op · 191 units · built 1964 · Block 1441, Lot 17.

On Umarelli: https://umarelli.org/nyc/1014410017/333-east-66-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1441: https://umarelli.org/nyc/manhattan/1441.md

## Building permits

- Alteration, filed Aug 27, 2026, estimated cost $64K, described as “Application filed for interior renovation as per plan”
- Alteration, filed May 4, 2026, estimated cost $11K, described as “Gc - general construction to include removal and construction of non-load bearing walls. No change to use, egress or occupancy.”
- Alteration, filed Jul 3, 2025, estimated cost $8K, described as “Interior work at existing APT#8H on the 8TH floor. Minor partitions work and associates finishes all as per vplan submitted. No change in use egress or occupancy.”
- Alteration, filed Jun 24, 2025, estimated cost $25K, described as “Removal of non load bearing partitions, flooring lighting, millwork and fixtures. Provide new non load bearing partitions, finishes, millwork, fixtures and lighting. No change to use egress or occupancy under this filing.”
- Alteration, filed Apr 28, 2025, estimated cost $25K, described as “Minor partition work in apt 2EF. No change to use, egress or occupancy.”
- Alteration, filed Apr 17, 2025, estimated cost $8K, described as “Installation of pipe scaffold as per plans in compliance with chapter 33 of nycbc. No change in use egress, or occupancy under this application”
- Alteration, filed Jan 22, 2025, estimated cost $18K, described as “Removal and installation of non-loadbearing partitions in apt. 7F on the 7TH floor, as shown on plans. All plumbing work filed under separate application. No change to egress, use, or occupancy.”
- Alteration, filed Jul 11, 2024, estimated cost $41K, described as “Gc - general construction to include removal and construction of non-load bearing walls. Kitchen & bathroom renovation including new cabinetry. Plumbing work will be filed under separate application in DOB now. No change to use, egress or…”
- Alteration, filed May 14, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed and storage materials as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 30, 2024, estimated cost $168K, described as “Filing for facade repairs for floors 001-012 as per plans filed herewith. No change in egress, use or occupancy.”
- Alteration, filed Apr 2, 2024, described as “Installation of suspended scaffold during facade inspection/ repair.”
- Alteration, filed Jun 29, 2023, estimated cost $30K, described as “Interior renovation at kitchen and bathroom”
- Alteration, filed May 1, 2023, estimated cost $13K, described as “Moderate plumbing modifications including new, relocation and removal of plumbing fixtures.”
- Alteration, filed Apr 28, 2023, estimated cost $29K, described as “Combining two apartments into a single unit as per TPPN 3/97. New partitions. Remove one kitchen. No change to use occupancy or egress. Apartment units within the Building are Coop.”
- Alteration, filed Aug 15, 2022, estimated cost $30K, described as “Interior renovation of existing unit 11MN. Removal of existing finishes, appliances,millwork and non load bearing partitions. Install new finishes, appliances, millwork and non load bearing partitions. No change to use, egress or occupancy.”
- Alteration, filed Jun 6, 2022, estimated cost $18K, described as “Sprint - Decommission of existing telecommunication site on the roof. Removal of antenna sectors, dunnage platform with related equipment and associated cabling/conduits from roof to cellar. No change in use, egress, or occupancy.”
- Alteration, filed Dec 23, 2021, estimated cost $103K, described as “Propose to install active soil depressurization system. No change to use, egress or occupancy.”
- Alteration, filed Aug 17, 2021, estimated cost $15K, described as “Application being filed to renovate an existing apartment on the 1st floor including demolition and construction of non-load bearing partitions as epr plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 28, 2021, estimated cost $15K, described as “Interior renovation of kitchen with minor partition and mill work changes as per plans. Direct replacement of plumbing fixtures under ordinary repair 28-105.4.2. No change in use, egress, or occupancy under this application.”
- Alteration, filed Apr 1, 2021, estimated cost $17K, described as “Plumbing modification as per plans filed herewith”
- Alteration, filed Feb 17, 2021, estimated cost $15K, described as “Filing plumbing renovations associated with apartment combination as per TPPN 3/97. Plans uploaded herewith. No change in use, egress, or occupancy under this application.”
- Alteration, filed Feb 5, 2021, estimated cost $40K, described as “Combining Apts 8A & 8B as per TPPN 3/97 with interior partitions, floor, doors, and finish work as per plans uploaded herewith. No change in use, egress, or occupancy under this application. Related PL scope filied under application…”

## Building history

- Major Renovation — Conversion, filed Dec 18, 1991, permit issued - partial job, 182 units added, 12 stories, described as “Combining apts, creating closets, removi ng kitchens, non-bearing partit ons, installation of new partitions, and installations of plumbing fixtures. All as shown on plans”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $21,031,650
- 2026–27 Tax: $1,999,301
- Market value (city estimate): $46,737,000
- Taxable value: $19,101,061
- Assessed land: $2,308,500
- Assessed improvements: $18,723,150

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $349,443 credit this tax year.

## Zoning

R8B (part of the lot is C1-9): floor area ratio 8.59 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Oct 13, 2026: $3,125,000
- Oct 7, 2026: $490,000
- Jun 11, 2026: $730,000
- Jun 10, 2026: $610,000
- Jun 10, 2026: $990,000
- Jun 5, 2026: $505,000
- Jun 4, 2026: $667,250
- May 19, 2026: $490,000
- May 7, 2026: $540,000
- Mar 20, 2026: $400,000

The 10 most recent of 101 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology