345 East 73rd Street, Manhattan
Co-op · 143 units · built 1961 · Block 1448, Lot 17.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed May 5, 2025, estimated cost $38K, described as “Interior renovation and combination of apartments 1J & 1K on the 1ST floor as per tppn 3/97. No change in use, egress, or occupancy.”
- Alteration, filed Jul 9, 2024, estimated cost $8K, described as “Perform demolition of existing plumbing fixtures in apartmenet #10A kitchen. Furnish and install new washer and dryer at new laundry room. Perform plumbing modification work in conjunction with apartment #10A& 10B renovation.”
- Alteration, filed Jul 9, 2024, estimated cost $50K, described as “Combination of two apt (#10A & 10B). Partition demolition & construction in conjunction with apt #10A & #10B renovation. Remove kitchen in apt #10A and add a laundry room. Application to comply with TPP#3/97. No change to use, egress,…”
- Alteration, filed Jun 27, 2024, estimated cost $15K, described as “Interior renovation of the existing apartment #7H on the 7TH floor including new partitions and finishes. No change to the use, egress, or occupancy.”
- Alteration, filed Dec 20, 2023, described as “Installation of suspended scaffold for facade work.”
- Alteration, filed Oct 27, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jul 13, 2023, estimated cost $826K, described as “Concrete patching of garage surfaces to include columns, reporting, crack repairs, stucco replacement. Facade repairs to include masonry, pointing, and caulking.”
- Alteration, filed Apr 4, 2022, estimated cost $24K, described as “Proposed renovation of existing apartment, new non bearing partition and new door. Minor repairs as per plans. No change in use , occupancy or egress.”
- Alteration, filed Aug 9, 2021, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 6, 2021, estimated cost $38K, described as “Alteration type 2, directive 14 application minor partition & finish work per drawings. No change in use, egress or occupancy. Existing multi-family, elevator building.”
- Alteration, filed Jun 22, 2021, estimated cost $9K, described as “Plumbing work associated with renovation of existing apt. PHH. No change in use, egress, or occupancy.”
- Alteration, filed Aug 6, 2019, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $14,890,950
- 2026–27 Tax
- $1,518,097
- Assessed land
- $2,119,500
- Assessed improvements
- $12,771,450
Tax breaks
- Co-op and Condo Abatement, with no end date, a $234,967 credit this tax year.
Zoning
R8B: floor area ratio 8.70 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 30, 2026: $910,000
- Aug 5, 2026: $1,695,050
- Jul 7, 2026: $885,000
- Jun 18, 2026: $640,000
- Jun 18, 2026: $1,260,000
- Jun 8, 2026: $900,000
- Apr 23, 2026: $660,000
- Apr 13, 2026: $1,460,000
- Aug 25, 2025: $645,000
- Aug 19, 2025: $835,000
The 10 most recent of 76 open-market sales since 2016, from the Department of Finance’s sales files.