# 1467 1st Avenue, Manhattan

Co-op · 215 units · built 1963 · Block 1451, Lot 23.

On Umarelli: https://umarelli.org/nyc/1014510023/1467-1-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1451: https://umarelli.org/nyc/manhattan/1451.md

## Building permits

- Alteration, filed Feb 17, 2026, estimated cost $25K, described as “Interior renovation of apartment 2C as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 17, 2025, estimated cost $130K, described as “Interior renovation of apartment 10C, including open kitchen layout, new closets, updated kitchen finishes, new flooring, doors, trim, painting, and electrical fixture/outlet updates as per plans filed. No change to use or egress.”
- Alteration, filed Jun 3, 2025, estimated cost $85K, described as “Interior renovation of apartment 2L.”
- Alteration, filed Jun 3, 2025, estimated cost $15K, described as “Renovation of kitchen and bathroom, fixtures to be replaced in kind.”
- Alteration, filed Mar 14, 2025, estimated cost $24K, described as “9TH cycle fisp repairs including concrete repairs, sealant replacement and brick repointing. No change in use, egress or occupancy.”
- Alteration, filed Mar 13, 2025, described as “Installation and use of temporary suspended scaffold for facade repairs as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Mar 12, 2025, estimated cost $1K, described as “Installation and use of temporary sidewalk shed equipment as per plans filed herewith. No change to use, egress or occupancy under this application”
- Alteration, filed Mar 4, 2025, estimated cost $1K, described as “Installation and use of Temporary pipe scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Sep 13, 2024, estimated cost $46K, described as “Interior renovation at apt 2B as per plans filed herewith”
- Alteration, filed Jul 3, 2024, estimated cost $10K, described as “Herwith filing for general construciton work related to bathroom renovation. No change in use, egress or occupancy”
- Alteration, filed May 10, 2024, estimated cost $187K, described as “Interior renovation of apts 19FGJ filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Mar 11, 2024, estimated cost $40K, described as “Hereby filing for the interior renovation of apartment 17EF on the 17TH floor. Plumbing work to be filed under laa application. No change to use, occupancy, or egress.”
- Alteration, filed Mar 6, 2024, estimated cost $90K, described as “General construction to renovate apt 14B on the 13TH floor. Work will include demo of non-load bearing partitions, new flooring, and new plumbing fixtures. No change in use, egress, or occupancy under this filing.”
- Alteration, filed Dec 11, 2023, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS. Designated Primary Site supervisor: Kenneth Cole.”
- Alteration, filed Nov 16, 2023, estimated cost $38K, described as “Interior renovation of apt #1B per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 9, 2022, estimated cost $30K, described as “Interior apartment renovation for Unit 10L. No change in use, egress, or occupancy.”
- Alteration, filed Apr 18, 2022, estimated cost $100K, described as “Mechanical work related to General renovation of building lobbies, vestibule, office and storage rooms. No change to use, egress and occupancy”
- Alteration, filed Apr 14, 2022, estimated cost $90K, described as “Herewith filing new Alt2 application for general construction work to be performed in existing unit 11. All in accordance with submitted plans. No changes to use, egress, or occupancy under this application.”
- Alteration, filed Apr 12, 2022, estimated cost $17K, described as “Minor plumbing work related to General renovation of building lobbies, vestibule, office and storage rooms. No change to use, egress and occupancy”
- Alteration, filed Mar 4, 2022, estimated cost $830K, described as “General renovation of building lobbies, vestibule, office and storage rooms. Replace exterior doors/windows as noted on plans. Minor plumbing and mechanical work to be filed separately. No change to use, egress and occupancy .”
- Alteration, filed Mar 4, 2022, estimated cost $600K, described as “Exterior courtyard roof and entry plaza repairs as per the plans filed including: Removal and replacement of roof membrane, flashing & drains. Minor concrete spall repairs.”
- Alteration, filed Jan 2, 2022, estimated cost $34K, described as “Interior renovation at existing apartment #9B with partition work. No change to use, egress or occupancy.”
- Alteration, filed Jul 16, 2021, estimated cost $22K, described as “Plumbing work in connection with the interior renovation / combination of apartments 14H & 14G as per plans filed herewith.no change in use, egress or occupancy.”
- Alteration, filed Jul 16, 2021, estimated cost $114K, described as “Interior renovation / combination with related mechanical work of apartments 14H & 14G as per plans filed herewith.no change in use, egress or occupancy.”
- Alteration, filed Mar 29, 2021, estimated cost $400K, described as “Install (1) new low pressure boiler. Install (1) new combination gas/oil burner. Straight gas only at this time. No change in means of egress use group or occupancy.”

11 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1014510023/1467-1-avenue.

## Property taxes

- Assessment: $28,848,150
- 2026–27 tax: $2,827,023
- Market value (city estimate): $64,107,000
- Taxable value: $26,437,414
- Assessed land: $3,253,500
- Assessed improvements: $25,594,650

## Tax breaks

- Co-op and condo abatement, with no end date, a $464,357 credit this tax year.

## Zoning

C2-8 (part of the lot is R8B): floor area ratio 10.99 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 14, 2026: $805,000
- Aug 21, 2026: $380,000
- Aug 19, 2026: $399,000
- Aug 17, 2026: $775,000
- May 5, 2026: $477,000
- Apr 7, 2026: $745,000
- Apr 6, 2026: $425,000
- Dec 19, 2025: $420,000
- Dec 2, 2025: $1,275,000
- Sep 5, 2025: $1,690,000

The 10 most recent of 118 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- LA PLAYA (City Planning P1988M1087): Completed, decided Jan 29, 1988. CONSENT-UNENCLOSED SIDEWALK CAFE WITH 30 SEATS
- TUESDAY'S 76 (City Planning P1983M2041): Completed, decided Jun 14, 1984. CONSENT-UNENCLOSED SIDEWALK CAFE
- ARTHUR'COURT (City Planning P1977M0475): Completed, decided Jun 10, 1977. RENEWAL-CONSENT TO OCCUPY SIDEWALK SPACE FOR UNENCL CAFE

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
