# 1114 1st Avenue, Manhattan

Condominium · built 1947 · Block 1456, Lot 7503.

On Umarelli: https://umarelli.org/nyc/1014567503/1114-1-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1456: https://umarelli.org/nyc/manhattan/1456.md

## Building permits

- Alteration, filed Sep 4, 2026, estimated cost $20K, described as “Modification of existing T-Mobile site. Install 3 antennas and 3 RRUs. Replace 1 equipment cabinet and install 1 new equipment cabinet on the existing roof platform.”
- Alteration, filed Jul 3, 2025, estimated cost $20K, described as “Installation of 210KW emergency generator to serve homeless shelter with fuel oil storage. Filed in conjunction with Alt CO #M01153658.”
- Alteration, filed Dec 20, 2024, estimated cost $3.1M, described as “As-of-right conversion of a portion of an existing eight (8) story building from commercial use group vi to hotel use group v. Remove & install new non-load bearing partitions, finishes and fixtures for an interior renovation as per plans…”
- Alteration, filed Oct 16, 2024, estimated cost $143K, described as “Plumbing work as per plans filed. Filed in conjunction with alt co #M01153658-I1.”
- Alteration, filed Sep 12, 2024, estimated cost $1.8M, described as “Proposed alteration renovation of an existing 8 story office building as per plans filed. No change in occupancy, use or egress.”
- Alteration, filed Jul 13, 2023, estimated cost $45K, described as “Replacement of existing air cooled self-contained HVAC unit with new 10-ton unit, connect to existing ductwork.”
- Alteration, filed May 15, 2023, estimated cost $10K, described as “Structure design for 2 advertising face signs ( 12' x 30') & (25' x 20'). No change to use, egress, or occupancy.”
- Alteration, filed Sep 18, 2020, estimated cost $1K, described as “Filing for Structural modifications as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Aug 25, 2020, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 29, 2020, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 22, 2020, estimated cost $19K, described as “AT&T - Replacement of existing antennas with installation of RRH units on roof. Retrofit and installation of cabinets in existing equipment room in cellar. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.”
- Alteration, filed Feb 10, 2020, described as “Installation of HVAC”
- Alteration, filed Dec 29, 2019, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 17, 2018, estimated cost $6K, described as “Modification to existing telecommunications site. Replace antennas with related rrh units and install rrh units on roof. All in conformance with tppn 5/98. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $5,969,686
- 2026–27 tax: $568,305
- Market value (city estimate): $13,265,969
- Taxable value: $5,238,803
- Assessed land: $1,498,500
- Assessed improvements: $4,471,186
- Condo units with their own tax lots: 3

## Zoning

C8-4: floor area ratio 6.67 built, above the 5.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
