- Alteration, filed Aug 28, 2026, estimated cost $470K, described as “Filing herewith for general construction as per plans submitted. No change in occupancy use or egress.”
- Alteration, filed Aug 7, 2026, estimated cost $11.1M, described as “Interior fitout of portions of the 1ST floor, cellar and sub-cellar (rrl phase 2B). Removal and installation of interior non-load bearing partitions, doors, frames, ceilings, lighting, flooring, and related finishes. No change in use,…”
- Alteration, filed Oct 16, 2025, estimated cost $150K, described as “Installation and use of shanty/contractor office as per plans.”
- Alteration, filed Aug 25, 2025, estimated cost $100K, described as “Alteration of existing Workroom/Dry lab to a new Shared Tissue Culture Lab on the 4th floor room RL-430. New equipment, patching & repairing of existing surfaces, new flooring & wall finishes, and new light fixtures. No change in occupancy…”
- Alteration, filed Aug 25, 2025, estimated cost $242K, described as “Proposed equipment replacement of existing Autoclave located on the 12th fl room RL-1202 Soiled Utility (Dirty Cage Wash). Patching and repairing of existing finishes as required. No change to occupancy use, or egress.”
- Alteration, filed Oct 24, 2024, estimated cost $93K, described as “Installation of a temporary dry sprinkler loop on the cellar and sub-cellar level at mskcc phase 2, as per plans submitted herewith, no change in use, egress or occupancy group.”
- Alteration, filed Jun 19, 2024, estimated cost $20K, described as “Installation of Temp Weather Walls”
- Alteration, filed Jun 18, 2024, estimated cost $900K, described as “Install new steam supply piping through tunnel connected to 424 East 68 Street (DOB #M01059687) as per plans. No change of use, occupancy or egress.”
- Alteration, filed Mar 7, 2024, estimated cost $500K, described as “Means & methods for structural alteration, filed in conjunction with M00945823-S4. Includes phased selective demolitions of portions of levels & temporary shoring & bracing.”
- Alteration, filed Oct 27, 2023, estimated cost $20.7M, described as “General construction and partial demolition of the Rockefeller Research Lab (Pavilion Enabling) parking garage as per plans filed herewith. No change in use or occupancy under this application. Existing stair "2" re-routed at first floor.”
- Alteration, filed Aug 28, 2023, estimated cost $86K, described as “Interior renovations on the 1ST floor. No change in occupancy, use or egress.”
- Alteration, filed Jun 26, 2023, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupanncy”
- Alteration, filed Oct 4, 2022, estimated cost $740K, described as “Interior renovations on the 1st floor. No change in occupancy, use or egress.”
- Alteration, filed Oct 26, 2021, estimated cost $30K, described as “Modifications to the plumbing and sprinkler systems on the 3RD floor. No change in occupancy, use or egress.”
- Alteration, filed Oct 26, 2021, estimated cost $220K, described as “Replace existing terminal boxes and duct distribution. Provide (2) new Fan Coil Units”
- Alteration, filed Oct 20, 2021, estimated cost $195K, described as “Interior renovations on the 3RD floor. No change in occupancy, use or egress.”
- Alteration, filed Jun 28, 2021, estimated cost $243K, described as “Interior renovation on the 11TH floor. No change in occupancy, use or egress.”
- Alteration, filed Jun 25, 2021, estimated cost $132K, described as “Modifications to the Plumbing and Sprinkler systems on the 11th floor. No change in occupancy, use or egress.”
- Alteration, filed Jun 24, 2021, estimated cost $145K, described as “Mechanical work on the 11th floor. No change in occupancy, use or egress.”
- Alteration, filed May 27, 2021, estimated cost $41K, described as “Install new steel framing to accommodate the loading dock restoration as per plans filed herewith. No change to zoning, use, egress, occupancy.”
- Alteration, filed May 17, 2021, estimated cost $10K, described as “New loading dock platform within the existing loading dock”
- Alteration, filed May 6, 2021, estimated cost $831K, described as “Filing for plumbing and sprinkler work. No change in egress, use or occupancy.”
- Alteration, filed May 6, 2021, estimated cost $4.6M, described as “Filing for General Construction work as per plans submitted. No change in egress, use, or occupancy.”
- Alteration, filed May 5, 2021, estimated cost $2.4M, described as “Filing for mechanical work. No change in occupancy, use or egress.”
- Alteration, filed Apr 5, 2021, estimated cost $250K, described as “Filing to replace and upgrade nitrogen generation system. No change in egress, use, or occupancy.”

3 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1014610013/425-east-66-street.

## Building history

- Alteration, filed Jun 9, 2016, permit issued - entire job/work, described as “Filing to amend the certificate of occupancy for the 1ST floor only. Minor partition work on the 1ST floor.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $67,973,400
- Market value (city estimate): $151,052,000
- Taxable value: $64,821,960
- Assessed land: $7,133,400
- Assessed improvements: $60,840,000

## Zoning

R9: floor area ratio 10.67 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- MSK Pavilion (City Planning 2022M0359): Special Permit, Zoning Map Change, Zoning Text Change, Authorization, Certification, Completed, filed Jan 23, 2024, decided Jul 24, 2025. This is a private application by MSK requesting a zoning map amendment from R8 to R9, text amendment to ZR 79-43, authorizations per ZR 79-21, a ZR 79-43 special permit, modifications to the Large Scale Community Facility Development and…
- MEMORIAL SLOAN-KETTERING CANCER CTR (City Planning P2001M0310): Completed, decided Dec 24, 2001. 01DCP050M: PROPOSES TO REZONE THE MIDBLOCK AREA BETWEEN E. 66TH & 69TH STS AND YORK AND 1ST AVES. FROM R8 TO R9 TO DESIGNATE THE MS KCC CAMPUS ON THESE 3 BLOCKS AS A LSCFD

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology