## Building permits

- Alteration, filed Mar 20, 2026, estimated cost $100K, described as “DHK 18: Modification to interior partitions and finishes to accommodate the On Call Room Renovation in the existing hospital building. No change to use, egress, occupancy.”
- Alteration, filed Feb 4, 2026, estimated cost $125K, described as “Plumbing modifications to accommodate the medivator filtration replacement project in the existing hospital building as per plans filed herewith. No change to zoning use, egress or occupancy.”
- Alteration, filed Sep 22, 2025, estimated cost $130K, described as “GP7: Renovation and fit out of an existing CT Scanner room to accommodate new medical equipment; all work in the existing ambulatory care building. No change to use, egress, occupancy.”
- Alteration, filed Sep 28, 2023, estimated cost $18K, described as “HVAC modifications to accommodate the conversion of endoscopy suites to ors in the existing hospital building.”
- Alteration, filed Sep 27, 2023, estimated cost $133K, described as “Modification to interior partitions and finishes to accommodate the conversion of endoscopy suites to ors in the existing hospital building. No change to zoning, use, egress.”
- Alteration, filed Nov 4, 2022, estimated cost $5K, described as “Sprinkler modifications to accommodate the nicu suite renovations as per plans filed herewith.”
- Alteration, filed Nov 3, 2022, estimated cost $130K, described as “Modification to interior partitions and finishes to accommodate the nicu suite modifications.”
- Alteration, filed Apr 11, 2022, estimated cost $600K, described as “DHK 589: Modification of interior partitions and finishes to accommodate alterations to the CSPD in the existing hospital building as per plans”
- Alteration, filed Apr 11, 2022, estimated cost $50K, described as “DHK 589: Modifications of plumbing lines and fixtures as indicated on plans filed herewith.”
- Alteration, filed Oct 13, 2021, estimated cost $71K, described as “Dhk mammo seed- modifications of interior partitions and finishes to accommodate alterations to the mammography seed unit within the existing hodpital building as per plans”
- Alteration, filed Oct 6, 2021, estimated cost $40K, described as “Dhk mammo seed- HVAC modificaitons to accommodate alterations to the mammography seed unit within the existing hospital building as per plans”
- Alteration, filed Jun 24, 2020, estimated cost $44K, described as “Install new sprinkler piping and 33 new heads in the existing tunnel level; connect to the existing system. All work as per plans filed herewith only.”
- Alteration, filed May 20, 2020, estimated cost $470K, described as “Plumbing and sprinkler modifications in floor 4 Mammography Suite and Locker Room in the DHK Building as per plans filed.”
- Alteration, filed Dec 21, 2017, estimated cost $50K, described as “Installation of scaffold stair tower as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 13, 2017, estimated cost $50K, described as “Installation of heavy duty sidewalk shed during new building construction, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 7, 2017, estimated cost $50K, described as “Installation of plywood fence, as per drawings. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”

## Property taxes

- Assessment: $157,550,400
- Market value (city estimate): $350,112,000
- Taxable value: $0
- Assessed land: $9,602,550
- Assessed improvements: $147,947,850

## Tax breaks

- Nonprofit exemption (hospital), with no end date, about $17,091,067 a year below the full tax.

## Zoning

R10 (part of the lot is R8): floor area ratio 17.19 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Change to an earlier grant (Board of Standards and Appeals 414-59-BZ): Change to an earlier grant, Granted, filed Dec 8, 2005, decided Apr 25, 2006. Extension of Term of a Variance to allow 77 transient parking spaces at the first and cellar floors of an existing multiple dwelling accessory garage. The premise is located in an R-9 and R-10 zoning district.
- MEMORIAL SLOAN-KETTERING CANCER CTR (City Planning P2001M0310): Completed, decided Dec 24, 2001. 01DCP050M: PROPOSES TO REZONE THE MIDBLOCK AREA BETWEEN E. 66TH & 69TH STS AND YORK AND 1ST AVES. FROM R8 TO R9 TO DESIGNATE THE MS KCC CAMPUS ON THESE 3 BLOCKS AS A LSCFD
- NEW YORK HOSPITAL TUNNEL (City Planning P1988M0877): Completed, decided Jun 29, 1989. 88-307M: CONSENT TO MAINTAIN & USE A PEDESTRIAN & SERVICE TUNNEL UNDER & ACROSS