1305 York Avenue, Manhattan
Health Center · built 2004 · Block 1464, Lot 28.
Building permits
- Alteration, filed Nov 10, 2026, described as “Industrial rope access CD5 for fisp inspection”
- Alteration, filed Aug 18, 2026, estimated cost $158K, described as “Repair stucco ceiling and walls and concrete crack and spalls at 1ST floor and cellar garage. No change in use, egress or occupancy.”
- Alteration, filed Jun 15, 2023, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy”
- Alteration, filed May 31, 2023, estimated cost $377K, described as “FISP Facade repair at existing Weill Greenberg building as per plans filed herewith only.”
- Alteration, filed Feb 28, 2023, described as “This application is filed to legalize the existing curb cut on York Avenue which was installed in 2004 in conjunction with BSA Cal. No71-03-BZ ; ;NB 103304657;”
- Alteration, filed Jan 21, 2022, estimated cost $3K, described as “Installation of temporary platform as per plans,platform shall comply with chapter # 33 of the code 2014, no cganges in use egress or occupancy under this application.”
- Alteration, filed Nov 19, 2021, estimated cost $1K, described as “Installation of temporary working platform as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 25, 2021, estimated cost $1.5M, described as “Modification of interior partition and finishes to accommodate alterations for the Y8 cardiology dept at partial 8TH floor as indicated on plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Oct 19, 2020, estimated cost $1K, described as “Filing to legalize existing curb cut in connection with NB 103304657.”
- Alteration, filed Dec 11, 2019, estimated cost $10K, described as “Plumbing modifications at sub & SC2”
- Alteration, filed Dec 11, 2019, estimated cost $20K, described as “Hvac modification to accommodate alterations to the existing MER/Storage room as per plans”
- Alteration, filed Dec 11, 2019, estimated cost $20K, described as “Sprinkler modification at b3 level (SC2 mer/ storage room as per plans”
Building history
- New Building — Mid-Rise, filed Oct 31, 2002, signed off Jul 15, 2024, 15 stories
- Demolition, filed Feb 25, 1997, signed off Feb 17, 1998, stories 6 to 0
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $48,710,250
- Market value (city estimate)
- $108,245,000
- Taxable value
- $0
- Assessed land
- $3,742,366
- Assessed improvements
- $44,967,884
Tax breaks
- Nonprofit exemption (hospital staff housing), with no end date, about $5,284,088 a year below the full tax.
Zoning
R10 (part of the lot is R8): floor area ratio 17.61 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Variance or Special Permit (Board of Standards and Appeals 71-03-BZ): Variance or Special Permit, Granted, filed Apr 24, 2003, decided Aug 12, 2003. Variance (§72-21) to permit in an R 10, R8, C1 5 overlay and C2 8 zoning district, the proposed erection of a new ambulatory care building housing 13 stories with two floors of mechanical space above contrary to zoning requirements for…
- CORNELL UNIV MEDICAL COLLEGE PKG (City Planning P1998M0319): Completed, decided Nov 9, 1998. 98DCP040M: CONSTRUCTION OF A 48 SPACES PARKING LOT