1350 1st Avenue, Manhattan
Co-op · 165 units · built 1961 · Block 1467, Lot 1.
Building permits
- Alteration, filed May 28, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed May 13, 2025, described as “Installation and use of suspended scaffold for facade restoration/inspection as per plan submitted”
- Alteration, filed Oct 24, 2024, estimated cost $43K, described as “Application is filed for interior alteration to apt 8H on the 8TH floor of an existing 20-story mixed-use building. All work includes modification of existing bedroom & installation of double doors at dining room. No change in use, egress…”
- Alteration, filed Jul 24, 2024, estimated cost $30K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 14, 2024, described as “Installation and use of suspended scaffold for facade restoration/inspection as per plans submitted”
- Alteration, filed May 7, 2024, estimated cost $15K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 19, 2024, estimated cost $2.2M, described as “Miscellaneous facade restoration, main roof bulkhead exterior wall areas and related construction work as shown on plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 13, 2023, estimated cost $50K, described as “Installation of vibration isolation and variable frequency drives for (3) new roof exhaust fans. No change in egress or occupancy.”
- Alteration, filed Jul 10, 2023, estimated cost $38K, described as “Dish: Installation of new telecommunication antenna sectors, GPS antenna, and equipment cabinet on the roof. Installation of conduits and service room connection as per plans. All work is in compliance with 5/98. No change in use, egress,…”
- Alteration, filed Apr 11, 2023, estimated cost $18K, described as “Replacement of a 3-ton split a/c unit on the ground floor.”
- Alteration, filed Jun 21, 2022, estimated cost $8K, described as “At cellar level, removal of plumbing fixtures and related piping as per plans submitted herewith. There is no change in use, egress or occupancy.”
- Alteration, filed Jun 2, 2022, estimated cost $31K, described as “At cellar level removal and installation of interior non-bearing partitions, finishes and lockers as per plans submitted herewith. There is no change in use, egress or occupancy.”
- Alteration, filed Dec 21, 2021, estimated cost $18K, described as “Sprint - Decommission of existing telecommunication site. Removal of antenna sectors on the roof, removal of interior room with associated equipment and related cabling/conduits in cellar.”
- Alteration, filed Aug 19, 2020, estimated cost $10K, described as “Structural work for roof opening as per plans submitted herewith”
- Alteration, filed Aug 18, 2020, estimated cost $165K, described as “Removal of existing dated water cooled HVAC system which is being replaced with VRF air-cooled equipment. HVAC ductwork is being re-used as well as, electrical feeders. All as per plans.”
- Alteration, filed Feb 11, 2020, estimated cost $12K, described as “Plumbing fixtures in apartment 11E. No change to use,occupancy or egress.”
- Alteration, filed Aug 26, 2019, estimated cost $12K, described as “Plumbing work on the 11TH floor as per plans filed. No change in use egress or occupancy.”
Property taxes
- Assessment
- $18,531,000
- 2026–27 tax
- $1,910,228
- Market value (city estimate)
- $41,180,000
- Taxable value
- $17,030,434
- Assessed land
- $2,700,000
- Assessed improvements
- $15,831,000
Tax breaks
- Co-op and condo abatement, with no end date, a $207,404 credit this tax year.
Zoning
R10A: floor area ratio 13.81 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 15, 2026: $725,000
- Aug 20, 2026: $1,550,000
- Apr 6, 2026: $380,000
- Aug 18, 2025: $815,000
- Jul 1, 2025: $475,000
- Jul 10, 2024: $620,000
- Aug 23, 2023: $365,000
- Jan 6, 2023: $422,500
- Aug 9, 2022: $480,000
- May 10, 2022: $61,500
The 10 most recent of 41 open-market sales since 2016, from the Department of Finance’s sales files.