## Building permits

- Alteration, filed Oct 5, 2026, estimated cost $100K, described as “GSH FACP Room: Modification of partitions and finishes to accommodate alterations to the existing hospital building as per plans.”
- Alteration, filed Mar 23, 2026, estimated cost $100K, described as “GSH Pharm: Modification of partitions and finishes to accommodate alterations to the existing pharmacy within the existing hospital building as per plans.”
- Alteration, filed Sep 5, 2024, estimated cost $725K, described as “Dayroom/ group room: modification to interior partitions and finishes to accommodate the dayroom/ group room project in the existing hospital building as per plans filed herewith only.”
- Alteration, filed Sep 4, 2024, estimated cost $325K, described as “Dayroom/ group room: HVAC modifications to accommodate the dayroom/ group room project in the existing hospital building as per plans filed herewith only.”
- Alteration, filed Mar 5, 2024, estimated cost $54K, described as “Pharmacy: plumbing and sprinkler modifications to accommodate the GSH Pharmacy Relocation in the existing hospital building.”
- Alteration, filed Mar 5, 2024, estimated cost $52K, described as “Pharmacy: hvac modifications to accommodate the GSH Pharmacy Relocation in the existing hospital building.”
- Alteration, filed Feb 21, 2024, estimated cost $140K, described as “GSH: Remove and install new partitions and finishes on partial 1st floor to accommodate the office relocation in the existing hospital as per plans filed herewith. No change to zoning, use, egress or occupancy.”
- Alteration, filed Jan 11, 2024, described as “IRA to assist with FISP”
- Alteration, filed Jul 6, 2023, estimated cost $459K, described as “Modification to interior partitions and finishes to accommodate the locker rooms renovations in the existing hospital building as per plans filed herewith only.”
- Alteration, filed Apr 24, 2023, estimated cost $1K, described as “Installation of 80 lf heavy duty sidewalk shed as per plans. No hange in egress, use or occupancy.”
- Alteration, filed Feb 22, 2023, estimated cost $75K, described as “GSH Elec Closets: Structural modifications within the existing hospital building as indicated on plans filed herewith.”
- Alteration, filed Feb 8, 2023, estimated cost $100K, described as “GSH Elec Closet: Modification of partitions and finishes to accommodate alterations for the new electrical closets and areaway renovations within the existing hospital building as per plans.”
- Alteration, filed Nov 15, 2021, estimated cost $1K, described as “Work Platform protection per drawing plan. No change to egress or occupancy”
- Alteration, filed May 27, 2021, estimated cost $625K, described as “General construction and structural work to accommodate repair & replacement of the existing driveway”
- Alteration, filed Aug 12, 2020, estimated cost $1K, described as “Installation of temporary 105' high pipe scaffold originating (off grade) for facade repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Jul 20, 2020, estimated cost $245K, described as “Modification to existing sprinkler system by relocating 74 sprinkler heads with related piping and adding 16 new sprinkler heads on the third floor.”
- Alteration, filed Jul 14, 2020, estimated cost $50K, described as “Plumbing modifications at partial 3RD floor”
- Alteration, filed Jun 24, 2020, estimated cost $48K, described as “Filing as per plans for the modification to existing sprinkler system to include 17 new sprinkler heads with related piping on the first floor.”
- Alteration, filed Jun 8, 2020, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 3, 2020, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 23, 2019, estimated cost $200K, described as “Hvac modifications to accommodate alterations to the existing lobby.”
- Alteration, filed Oct 23, 2019, estimated cost $150K, described as “Sprinkler modifications to accommodate alterations to the existing lobby”
- Alteration, filed Oct 7, 2019, estimated cost $100K, described as “Minor structural modification to accommodate a temporary pedestrian tunnel in the existing hospital lobby during construction. refer to separate application for buildout”

## Property taxes

- Assessment: $10,045,350
- Market value (city estimate): $22,323,000
- Taxable value: $0
- Assessed land: $3,870,000
- Assessed improvements: $6,175,350

## Tax breaks

- Nonprofit exemption (hospital staff housing), with no end date, about $1,089,720 a year below the full tax.

## Zoning

R8B: floor area ratio 4.61 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology