527 Fdr Drive, Manhattan
Hospital · built 1955 · Block 1482, Lot 20.
Building permits
- Alteration, filed Apr 20, 2026, estimated cost $80K, described as “HSS LL Railings: Modification and installation of new railings to accommodate the LL11 filings within the existing hospital building. No change to use, egress, or occupancy.”
- Alteration, filed Feb 24, 2026, estimated cost $125K, described as “CT Replacement: Remove and install new partitions and finishes on partial 3rd floor in the existing hospital as per plans filed herewith only. minor work on 5th floor to accommodate AC unit. No change to zoning, use, egress, occuapncy.”
- Alteration, filed Feb 24, 2026, estimated cost $110K, described as “EOS + X-Ray Replacement: Remove and install new partitions and finishes on partial 5th floor in the existing hospital as per plans filed herewith only. No change to zoning, use, egress, occupancy.”
- Alteration, filed Dec 11, 2025, estimated cost $125K, described as “Provide new 2" domestic water distribution including ductile saddle on existing 6" dia. Booster pump intake; provide new 2" double check valve for irrigation and 3/4"double check valve for outdoor drinking fountains.”
- Alteration, filed Aug 19, 2025, estimated cost $327K, described as “HSS Central Sterile: Modification to interior finishes to accommodate the sterilizing equipment replacements in the existing hospital building. No change to use, egress, or occupancy.”
- Alteration, filed Aug 12, 2025, estimated cost $826K, described as “HSS Central Sterile: Modification to HVAC ductwork, piping and equipment to accommodate the CSPD Expansion project in the existing hospital building. No change to use, egress, or occupancy.”
- Alteration, filed May 14, 2025, estimated cost $232K, described as “HSS 8FL: modification and removals of interior partitions and finishes to accommodate alterations within the existing hospital building as per plans. No change to use, egress or occupancy”
- Alteration, filed Apr 13, 2025, described as “IRA to assist with Condition Assessment.”
- Alteration, filed Jul 30, 2024, estimated cost $300K, described as “High Pressure steam piping installation for new con edison service to act as a backup source of heat for if the primary source of heat serving the hospital should fail”
- Alteration, filed Jun 5, 2024, estimated cost $294K, described as “Hss block a&b: modification of interior partitions and finishes to accommodate alterations at partial 2ND floor withi the existing hospital building as per plans. No change to use, egress or occupancy.”
- Alteration, filed May 1, 2024, estimated cost $294K, described as “Hss block c: modification of interior partitions and finishes to accommodate alterations at partial 2ND floor withi the existing hospital building as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 18, 2024, described as “Installation of ADT work access system”
- Alteration, filed Jan 2, 2024, estimated cost $75K, described as “Filing for the removal and installation of non-load bearing partitions, flooring, New RFI shielding, ceiling related to the MRI Room "B" Equipment replacement.”
- Alteration, filed Sep 5, 2023, estimated cost $1.0M, described as “Filing to indicate 488 SF of floor area attributed to part of the connecting bridge located on the 3rd floor. The bridge is located in de-mapped air space above former East 71st Street, and was approved by the City Planning Commission as…”
- Alteration, filed Apr 27, 2023, estimated cost $80K, described as “Demolition of partitions and finishes on partial 3rd floor and create a new opening in the exterior wall in preparation for the new bridge connection; all work as per plans filed herewith.”
- Alteration, filed Dec 22, 2022, estimated cost $1.8M, described as “Hss 9E: modification of HVAC equipment and ductwork to accommodate alterations with in the existing hospital building as indicated on plan filed herewith.”
- Alteration, filed Dec 22, 2022, estimated cost $108K, described as “Hss 9E: structural modifications to accommodate alterations within the existing hospital building as indicated on plans filed herewith.”
- Alteration, filed Dec 22, 2022, estimated cost $910K, described as “Hss 9E: plumbing and sprinkler modifications to accommodate alterations within the existing hospital building as indicated on plans filed herewith.”
- Alteration, filed Dec 22, 2022, estimated cost $1.3M, described as “Hss 9E: modifications of interior partitions and finishes to accommodate alterations within the existing hospital building. Refer to alt 120112476 for use, egress and occupancy.”
- Alteration, filed Dec 6, 2022, estimated cost $53K, described as “Hss 9 fl: plumbing and sprinkler removals, installation of temp sp loop as per plans filed herewith.”
- Alteration, filed Dec 5, 2022, estimated cost $140K, described as “HSS 9FL: modification and removals of interior partitions and finishes to accommodate alterations to the surgical suite within the existing hospital building as per plans”
- Alteration, filed Nov 4, 2022, estimated cost $100K, described as “Plumbing and sprinkler modifications to accommodate the camp alterations in the existing hospital building.”
- Alteration, filed Nov 4, 2022, estimated cost $100K, described as “HVAC modifications to ductwork and piping to accommodate the camp alterations in the existing hospital building.”
- Alteration, filed Nov 4, 2022, estimated cost $800K, described as “Remove and install new partitions and finishes on partial 8th floor in the existing hospital as per plans filed herewith only. No change to zoning, use, occupancy proposed herein.”
- Alteration, filed Jun 7, 2022, estimated cost $133K, described as “This Alteration application is being filed for the mechanical work in conjunction with the general construction work for Central Sterile area on 7th floor. as per plans filed herewith. There are no change in use, egress or occupancy.”
19 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $74,052,900
- Market value (city estimate)
- $164,562,000
- Taxable value
- $0
- Assessed land
- $5,310,000
- Assessed improvements
- $68,742,900
Tax breaks
- Nonprofit exemption (hospital), with no end date, about $8,033,259 a year below the full tax.
Zoning
R9: floor area ratio 11.73 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- HOSPITAL FOR SPECIAL SURGERY (City Planning P1994M0369): Completed, decided May 24, 1994. RENEWAL OF SPECIAL PERMIT PURSUANT TO CPC RULE 1.06 FOR THE*CONSTRUCTION OF A 7-STORY ENLARGEMENT TO THE EXISTING MAIN*BLDG, IN DEMAPPED AIR SPACE OVER THE FDR DRIVE
- HOSPITAL FOR SPECIAL SURGERY EXPNSN (City Planning P1992M0051): Completed, decided Apr 12, 1993. 90-015M: RECONSTR & RENOVATE OF HOPITAL'S MAIN BLDG & ALSO EXPANSION OF EXIST FACILITY EASTWARD WITH NEW CONSTR OVER FDR DRIVE; Additional Other #(s): 840900/A/B, 840900/C/D, 840900A
- HOSPITAL FOR SPECIAL SURGERY (City Planning P1991M0386): Completed, decided Apr 12, 1993. CPC APPROVL OF EASEMENT SPACE AND THE CONSTRUCTION OF BLDGS*IN THE SOCIETY'S SPACE AS PER ART.15 OF THE 1973 AGREEMENT
- HOSPITAL FOR SPECIAL SURGERY EXPNSN (City Planning P1991M0387): Completed, decided Mar 15, 1993. 90-015M: RECONSTR & RENOVATE OF HOPITAL'S MAIN BLDG & ALSO EXPANSION OF EXIST FACILITY EASTWARD WITH NEW CONSTR OVER FDR DRIVE