# 521 East 72nd Street, Manhattan

Mixed Use · 15 units · built c. 1920 · Block 1484, Lot 14.

On Umarelli: https://umarelli.org/nyc/1014840014/521-east-72-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1484: https://umarelli.org/nyc/manhattan/1484.md

## Building permits

- Alteration, filed Apr 25, 2025, estimated cost $5K, described as “Installation of pipe scaffolding, stair tower and hoist material as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 23, 2025, estimated cost $5K, described as “Installation of 300PSF sidewalk shed, stair tower and hoist material as per plans. Sidewalk shed shall comply with chapter 33 of NYC code 2022. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 17, 2025, estimated cost $1.1M, described as “General construction taking place on 8TH and 9TH floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Feb 24, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Nov 9, 2021, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 12, 2021, estimated cost $25K, described as “Facade repair shown on drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 23, 2020, estimated cost $37K, described as “Sprinkler modification to the cellar, Basement, 2nd floor thru 5th floor and 7th thru 8th floors as per plans filed hererwith. No change in use, egress or occupancy.”
- Alteration, filed Aug 19, 2019, estimated cost $57K, described as “Sprinkler and plumbing modification at partial 3RD floor office area as per plans.”

## Building history

- Alteration, filed Aug 5, 2011, permit issued - entire job/work, units 23 to 15, described as “Change of use at 5TH &amp; 6TH floor from class a apartments to hospital (1) as shown on drawings filed herewith.”
- Alteration, filed Feb 20, 1997, permit issued - entire job/work, described as “File to amend certificate of occupancy in 1ST floor,new mechanical ventilation work,plumbing work,flooring &amp; suspended ceiling to be reapired. Sprinkler heads will be dropped as shown.no change of use or egress.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $29,462,850
- 2026–27 Tax: $2,956,988
- Market value (city estimate): $65,473,000
- Taxable value: $27,230,760
- Assessed land: $10,893,150
- Assessed improvements: $18,569,700

## Zoning

M1-4 (part of the lot is R10): floor area ratio 10.69 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- SOLOW EAST RIVER (City Planning P1989M0443): Completed, decided Mar 15, 1989. 4TH MODIFICATION TO SPECIAL PERMIT (ZR74-95) TO COMBINE\*APARTMENTS I & H ON THE 33RD FLOOR
- SOLOW EAST RIVER DEVELOPMENT CORP (City Planning P1986M0991): Completed, decided Apr 14, 1988. 1ST MODIF TO INSURE THE INCORPORATION THAT THE ENLARGE LOT\*DOES NOT EXCEED THE MAXIMUM OF FLOOR AREA. BL1484.\*LOT19,22,23,24. P/O 14,16,26.
- SOLOW EAST RIVER DEVELOPMENT CORP (City Planning P1984M0984): Completed, decided Nov 12, 1985. SPEC PERM-HOUSING QUALITY (ZR74-95) & A PUBLIC PARKING\*GARAGE FOR 84 SPACES (ZR74-92) FOR A 52 STY MIXED USE GROUP\*4A BUILDING (POPS)
- SOLOW EAST RIVER (City Planning P1984M0887): Completed, decided Oct 10, 1985. REZO FROM M1-4 TO R10 TO BUILD A 52 STY MIXED USE BLDG W/441\*RESDL UNITS (POPS)

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology