515 East 72nd Street, Manhattan
Condominium · 323 units · built 1985 · Block 1484, Lot 7501.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Nov 24, 2026, described as “File suspended scaffold outrigger systems for facade restoration and inspection.”
- Alteration, filed Aug 7, 2026, estimated cost $8K, described as “File-supported pipe scaffold as shown on the plan. No change in use, egress, or occupancy under this application.”
- Alteration, filed Aug 29, 2025, estimated cost $63K, described as “Installation of a 5 ton, water cooled, Climatemaster A/C unit with a single line supply air duct layout, ceiling return air grilles, and condenser water supply & return piping and condensate drain on the first floor MRI Suite .”
- Alteration, filed Dec 23, 2024, estimated cost $120K, described as “Interior renovation and combination of apartments 4L, 4M, and 4N as per tppn 3/97. No change in use, egress, or occupancy.”
- Alteration, filed Aug 22, 2024, described as “Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.”
- Alteration, filed Aug 12, 2024, described as “Suspended scaffold (CD5) application renewal.”
- Alteration, filed Aug 2, 2024, described as “Installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycbc.”
- Alteration, filed Nov 30, 2023, estimated cost $8K, described as “Minor renovation to apartment 36C (36TH flr) to split the living rm into a living rm & a bedroom. Scope of work does not require change in occupancy, egress, or use.”
- Alteration, filed Aug 24, 2023, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter # 33 of the NYC code 2022, no changes in use egress or occupancy under this application.”
- Alteration, filed Jul 6, 2023, estimated cost $22K, described as “HSS X-Ray: Sprinkler and plumbing modifications to accommodate alterations to the X-Ray suite as indicated on plans filed herewith.”
- Alteration, filed Jul 6, 2023, estimated cost $60K, described as “HSS X-Ray: Modification of HVAC equipment and ductwork to accommodate alterations to the existing x-ray suite as indicated on plans filed herewith.”
- Alteration, filed Jul 6, 2023, estimated cost $80K, described as “HSS X-Ray: Modification of interior partitions and finishes to accommodate alterations to the existing x-ray suite as indicated on plans filed herewith”
- Alteration, filed Jun 9, 2023, estimated cost $25K, described as “Structural Modifications at 1st Floor medical Office as per plans filed herewith. filed in Conjunction with GC application M00875134-I1. No change in egress, occupancy, or use.”
- Alteration, filed Jun 7, 2023, estimated cost $10K, described as “Interior renovation of medical office on 1st floor as per shown on plans filed herewith. No change in egress, occupancy or use.”
- Alteration, filed Jul 2, 2021, estimated cost $227K, described as “Repair of concrete slab cracks and spalls at sub-cellar, cellar and ramp slabs, FRP reinforcing of one concrete beam at cellar. No change in use, egress or occupancy.”
- Alteration, filed Apr 29, 2021, estimated cost $500K, described as “Facade repairs as per plans filed herewith. no change in use, egress or occupancy.”
- Alteration, filed Feb 22, 2021, estimated cost $3K, described as “Installation of temporary overhead protection as per drawings. Temporary overhead protection shall comply with ch #33 of the NYC bldg code. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 15, 2020, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Sep 12, 2020, estimated cost $2K, described as “Combine Apartments 19H & 19J. Remove Kitchen in 19J & reconfigure Kitchen in 19H.”
- Alteration, filed Apr 24, 2020, estimated cost $110K, described as “Removed and Added New Fixtures for the sprinkler and plumbing work types. No change in use, egress or occupancy.”
- Alteration, filed Apr 24, 2020, estimated cost $140K, described as “Modifications to existing mechanical systems. No change in use, egress or occupany.”
- Alteration, filed Apr 7, 2020, estimated cost $11K, described as “Plumbing work as per plans filed herewith in apt 24B to restore apt after fire. No change in use, egress and occupancy.”
- Alteration, filed Oct 1, 2019, estimated cost $545K, described as “The project consists of creating a hospital grade 3-D printing facility within an existing office building. The HVAC system to support this operation consists of air cooled split systems with humidification controls. No change in use,…”
- Alteration, filed Sep 23, 2019, estimated cost $95K, described as “Modifications to existing plumbing work type. No change in use, egress or occupancy.”
- Alteration, filed Sep 23, 2019, estimated cost $40K, described as “Scope of the work the installation of 94 new sprinkler heads. No change in use, egress or occupancy.”
1 more, older permit is in this building’s full list on the map.
Property taxes
- Assessment
- $83,082,714
- Assessed land
- $13,095,109
- Assessed improvements
- $69,987,605
Tax breaks
- Nonprofit exemption (hospital), with no end date, about $646,578 a year below the full tax.
- Co-op and Condo Abatement, with no end date, a $714,763 credit this tax year.
Zoning
R10 (part of the lot is M1-4): floor area ratio 10.76 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Oct 1, 2026: $1,567,500, Apt 23G
- Sep 18, 2026: $930,000, Apt 11D
- Aug 27, 2026: $866,000, Apt 15D
- Jul 17, 2026: $835,000, Apt 10P
- Jul 16, 2026: $1,800,000, Apt 39C
- Jul 14, 2026: $840,000, Apt 10D
- Jul 1, 2026: $769,000, Apt 7H
- Jun 23, 2026: $1,550,000, Apt 4B
- Jun 4, 2026: $1,575,000, Apt 32C
- Mar 6, 2026: $1,700,000, Apt 18B
The 10 most recent of 152 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- RIVER TERRACE (City Planning P2007M0394): Completed, decided Mar 7, 2008. MOD TO THE SPECIAL PERMIT TO UPGRADE & RELOCATE THE REQUIRED*RECREATION SPACE; Additional Other #(s): 8507701
- RIVER TERRACE (City Planning P2008M0085): Completed, decided Mar 7, 2008. AUTH TO MODIFY THE SPECIAL PERMIT TO UPGRADE, INCREASE &*RELOCATE THE REQUIRED RECREATION SPACE
- RIVERTERRACE (City Planning P1990M0287): Completed, decided Sep 20, 1990. 5TH MODIFICATION TO CONSTRUCT A COMPUTER ROOM
- RIVERTERRACE (City Planning P1990M0291): Completed, decided May 30, 1990. 2ND MODIF TO EXCHANGE EXISTING RESIDENTIAL SPACE WITH COMMU-*NITY FACILITY ON THE GROUND FLOOR & CONSTRUCT A COMPUTER*ROOM ON THE 2ND FLOOR AS PART OF THE COMMUNITY FACILITY
- RIVERTERRACE (City Planning P1988M0042): Completed, decided Jan 27, 1988. MODIF TO THE RESTRICTIVE DECLARATION TO EXTEND THE DEADLINE*FOR THE COMPLETION OF THE AGREED UPON AMENITIES & TO LEAD TO*THE GRANTING OF A RESTRICTED CERTIFICATE OF OCCUPANCY
- RIVERTERRACE (City Planning P1986M0585): Completed, decided Jan 29, 1987. 3RD MODIF OF SPEC PERMIT TO REALLOCATE THE FLOOR AREA LAYOUT; Additional Other #(s): 840244S
- RIVER TERRACE (City Planning P1986M0125): Completed, decided Dec 23, 1985. 2ND MODIF OF SPEC PERMIT C821224ZSM TO REFLECT REALLOCATION*OF THE FLOOR AREA LAYOUT ON THE 1ST FLOOR
- RIVER TERRACE (City Planning P1985M0734): Completed, decided Jun 17, 1985. 1ST MODIF OF SPEC PERMIT 840233ZSM TO REFLECT CHANGES IN*HOUSING QUALITY SCORING & VARIOUS CHANGES IN FLR AREA
- RIVER TERRACE (City Planning P1984M0202): Completed, decided Feb 17, 1984. MAJOR MODIF TO SPEC PERMIT TO ALLOW REDUCED DU'S, CHANGE*FRONT PROJCTN & SIDE BREAK, LOC OF SETBACKS, USE OF 2ND FL,*LAYCUT OF 1ST, ADD BALCONY
- MACKLOWE BLDG (City Planning P1983M1665): Completed, decided Oct 4, 1983. MOD SPEC PERMIT TO FACILITATE IMPROVEMENT TO DESIGN A*STRUCTURE