1035 Madison Avenue, Manhattan
Co-op · 20 units · built c. 1925 · Block 1491, Lot 23.
Building permits
- Alteration, filed Oct 16, 2026, estimated cost $9K, described as “Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 13, 2026, estimated cost $63K, described as “Interior renovation, removal of millwork and replacement with new, new finishes as per plan. No change to use, egress or occupancy under this application.”
- Alteration, filed Oct 8, 2026, estimated cost $15K, described as “Facade and exterior repairs per drawings. No change in use, egress or occupancy is involved under this application.”
- Alteration, filed Aug 25, 2026, estimated cost $31K, described as “Facade exterior repairs as per drawings. No change in use, egress or occupancy is involved under this application.”
- Alteration, filed Jun 11, 2026, estimated cost $1.2M, described as “Interior renovation of existing apartment. Demolish and construct non-structural walls, doors,flooring and finishes. No changes to use, egress or occupancy. Mechanical, plumbing & sprinklerfield under subsequent applications.”
- Alteration, filed Aug 4, 2025, estimated cost $368K, described as “Interior renovation of existing Apt. #13B. Work to include non-structural demolition, general construction, and related finishes. No change in use, egress, or occupancy.”
- Alteration, filed Nov 28, 2023, estimated cost $200, described as “Erect non-illuminated accessory d/f blade wall sign on storefront, non-flashing, non-advertising sign, no change in use, egress, or occupancy”
- Alteration, filed Oct 10, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 10, 2022, estimated cost $4K, described as “Installation of temporary storage of materials as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 10, 2022, estimated cost $4K, described as “Installation of temporary betamax hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 10, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 12, 2022, estimated cost $354K, described as “Facade, masonry and exterior repairs as per drawings. No change in use, egress or occupancy is involved under this application.”
- Alteration, filed Oct 6, 2021, estimated cost $104K, described as “Interior renovation to penthouse apartment. Remove and construct non-load bearing interior partitions,cabinetry, finishes. No change to use, egress or occupancy”
- Alteration, filed Oct 6, 2021, estimated cost $27K, described as “Plumbing work filed with interior alterations to penthouse apartment. Install plumbing fixtures. No change to use, egress or occupancy.”
Property taxes
- Assessment
- $9,036,900
- 2026–27 Tax
- $872,515
- Market value (city estimate)
- $20,082,000
- Taxable value
- $8,000,100
- Assessed land
- $1,570,500
- Assessed improvements
- $7,466,400
Tax breaks
- Co-op and condo abatement, with no end date, a $122,618 credit this tax year.
Zoning
C5-1: floor area ratio 9.77 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 8, 2026: $5,881,200
- May 28, 2026: $23,575,000
- May 28, 2025: $9,100,000
- Nov 25, 2024: $3,125,000
- Jun 17, 2024: $8,200,000
- Sep 29, 2021: $4,650,000
- Jul 9, 2021: $8,550,000
- Dec 27, 2019: $3,400,000
- Jan 7, 2019: $4,300,000
Open-market sales since 2016, from the Department of Finance’s sales files.