79 East 79th Street, Manhattan
Co-op · 14 units · built c. 1928 · Block 1491, Lot 30.
Building permits
- Alteration, filed Jan 1, 2026, described as “Facade inspection”
- Alteration, filed Jun 30, 2025, estimated cost $260K, described as “Moderate interior renovation of apt #2 consisting of partitions, gwb, trim, tile, millwork, cosmetic finishes, and replacement of bathroom fixtures as indicated. No change to egress, occupancy, or use.”
- Alteration, filed Jun 16, 2025, estimated cost $5K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Oct 10, 2024, estimated cost $3K, described as “Installation of material hoists as per plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 3, 2024, estimated cost $11K, described as “Installation of a temporarily supported scaffold and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 25, 2024, estimated cost $268K, described as “General construction work as shown on the plans.”
- Alteration, filed Feb 5, 2024, described as “Window inspections via industrial rope access means and methods”
- Alteration, filed Dec 1, 2023, described as “Renewal of SR22-3504”
- Alteration, filed Nov 2, 2023, estimated cost $6K, described as “File-supported pipe scaffold as shown on the plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Oct 21, 2023, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Jan 16, 2023, estimated cost $450K, described as “Parapet replacement and related partial roof repairs as per plans, including additional parapet and masonry repairs at east elevation and masonry work at the south elevation as set forth in the PAA drawings No change to use, egress, or…”
- Alteration, filed Oct 28, 2022, estimated cost $127K, described as “Interior renovation to existing apt. On the 5TH fl. Work to include general construction work as per plans. Pl. Work is filed as subsequent to this applictaion. Mh work filed under# M00776792. No change in use, egress or occupancy under…”
- Alteration, filed Oct 25, 2022, estimated cost $32K, described as “Installation of new HVAC system with duct work in conjunction with apt. Renovation on the 5TH fl. Gc work filed under separate application#: M00776773-I1. No change in use, egress or occupancy under this application.”
Property taxes
- Assessment
- $8,290,800
- 2026–27 Tax
- $735,817
- Market value (city estimate)
- $18,424,000
- Taxable value
- $7,114,140
- Assessed land
- $720,000
- Assessed improvements
- $7,570,800
Tax breaks
- Co-op and Condo Abatement, with no end date, a $149,110 credit this tax year.
Zoning
R10: floor area ratio 9.28 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Nov 26, 2024: $5,500,000
- Jul 18, 2024: $10,600,000
- Mar 1, 2018: $11,500,000
Open-market sales since 2016, from the Department of Finance’s sales files.