900 Park Avenue, Manhattan
Condominium · 124 units · built 1973 · Block 1491, Lot 7501.
Building permits
- Alteration, filed Sep 18, 2026, estimated cost $359K, described as “Renovation of apartment 20A on 19TH floor/20TH marketing floor. Non-structural partition work, related plumbing and electrical work. No change to use, occupancy or egress.”
- Alteration, filed Nov 12, 2025, estimated cost $120K, described as “Interior renovation work in the Apt. 12C and 12D as shown on the plans such as replace all plumbing fixtures, rearrange the non-load bearing walls and cosmetic work of painting. No changes in the Use, egress and occupancy.”
- Alteration, filed Mar 4, 2025, estimated cost $94K, described as “General construction for interior of unit 21B. Work includes removal & installation of non-load bearing partitions, installation of washer & dryer, fixtures as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Nov 21, 2023, estimated cost $95K, described as “Proposed non-structural interior renovation of apt 29BCD. Modification includes change of floor and wall finishes. No change in use, egress or occupancy is proposed in this application”
- Alteration, filed Aug 4, 2023, estimated cost $18K, described as “Proposed interior modification including the renovation of the kitchen, 2 bathrooms, the addition of a washing machine with electric dryer. No change in use, egress, or occupancy is proposed in this application”
- Alteration, filed Aug 4, 2023, estimated cost $156K, described as “Proposed interior modification including the renovation of the kitchen, 2 bathrooms, the addition of a washing machine with electric dryer and the modification of finishes throughout. No change in use, egress, or occupancy is proposed in…”
- Alteration, filed Jul 17, 2023, estimated cost $5K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 31, 2023, estimated cost $300K, described as “Propose interior renovation of apartment 18AB. Removal and installation of non load bearing partitions and related finishes. No change in use, egress or occupancy filed under this application.”
- Alteration, filed Feb 6, 2023, estimated cost $12K, described as “Plumbing work in conjunction with interior renovation of apt 29E on the 29th floor. No change in use, egress or occupancy.”
- Alteration, filed Feb 6, 2023, estimated cost $120K, described as “Interior renovation of existing apartment 29E on the 29th floor. Work as per plans herewith submitted. No change in use, egress or occupancy.”
- Alteration, filed Dec 8, 2022, estimated cost $40K, described as “Plumbing work in conjunction with interior renovation of apartments 7C & e. No change in use, egress or occupancy”
- Alteration, filed Dec 8, 2022, estimated cost $8K, described as “Mechanical work in conjunction with interior renovation of apartment 7C & e. No change in use, egress or occupancy”
- Alteration, filed Dec 8, 2022, estimated cost $440K, described as “Combination and renovation of apartments 7C and 7E on the seventh floor per tppn 3/97. No change to use, occupancy or egress.”
- Alteration, filed Jul 25, 2022, estimated cost $264K, described as “Work includes per the filed plans concrete crack/spall repair, concrete beam encasement repair, floor coating repair.”
- Alteration, filed Aug 26, 2021, estimated cost $13K, described as “Plumbing work for the combination of apartments 7A, 7B and 7C on the seventh floor per tppn 3/97. No change to use, occupancy or egress.”
- Alteration, filed Aug 25, 2021, estimated cost $238K, described as “Combination of apartments 7A, 7B and 7C on the seventh floor per tppn 3/97. Non-structural partition work. No change to use, occupancy or egress.”
- Alteration, filed Dec 18, 2020, estimated cost $8K, described as “Remove and replace 4 existing bathroom fixtures. Cap and remove 1-existing fixture”
- Alteration, filed Dec 18, 2020, estimated cost $5K, described as “Proposed addition of two sinks and a dish washer”
- Alteration, filed Dec 8, 2020, estimated cost $30K, described as “Plumbing work in apt 5A. Renovation of kitchen and bathrooms. New washer.”
- Alteration, filed Sep 18, 2020, estimated cost $12K, described as “Replace: (1) gas range (1) sink and (1) dishwasher at existing kitchen. Replace: (2) wc (2) lavatories (1) bathtub and (1) shower in existing bathrooms.replace: (1) wc, and (1) lavatory at existing powder room. New installation of wash…”
- Alteration, filed Jul 29, 2020, estimated cost $22K, described as “Replace 3 toilets and 3 lavs. Remove 1 tub. Replace 1 tub. Add 2 new showers and 1 new clothes washer.”
- Alteration, filed Mar 3, 2020, estimated cost $68K, described as “Plumbing work filed in conjunction with apartment renovation.”
- Alteration, filed Mar 3, 2020, estimated cost $30K, described as “Mechanical modification filed in conjunction with apartment renovation.”
- Alteration, filed Oct 9, 2019, estimated cost $45K, described as “Herewith filing plumbing work.”
Property taxes
- Assessment
- $28,871,087
- 2026–27 tax
- $3,222,847
- Market value (city estimate)
- $64,158,002
- Taxable value
- $27,365,886
- Assessed land
- $4,364,982
- Assessed improvements
- $24,506,105
- Condo units with their own tax lots
- 126
Tax breaks
- Co-op and condo abatement, with no end date, a $143,571 credit this tax year.
Zoning
R10: floor area ratio 10.96 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 30, 2026: $3,800,000, Apt 20A
- Jun 5, 2026: $9,975,000, Apt 7A, sold with other lots
- Jun 1, 2026: $5,350,000, Apt 11A, sold with other lots
- May 19, 2026: $2,525,000, Apt 5E
- May 15, 2026: $1,666,667, Apt 24E
- Sep 4, 2025: $1,750,000, Apt 18D
- Jul 24, 2025: $3,100,000, Apt 11E
- Jul 18, 2025: $1,510,000, Apt 10B
- Jul 18, 2025: $1,950,000, Apt 16C
- Apr 30, 2025: $930,000, Apt 12D
The 10 most recent of 52 open-market sales since 2016, from the Department of Finance’s sales files.