998 5th Avenue, Manhattan
Co-op · 17 units · built c. 1912 · Block 1493, Lot 1.
Building permits
- Alteration, filed Jan 6, 2026, estimated cost $185K, described as “Partition, finish, fixture work at Penthouse super's apartment. New HVAC system. No change to use, egress or occupancy filed under this application.”
- Alteration, filed Oct 24, 2025, estimated cost $5K, described as “Installation of a temporarily heavy-duty sidewalk shed and shoring via supported scaffold and per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 5, 2025, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Apr 4, 2024, described as “Facade Repairs”
- Alteration, filed Sep 8, 2023, described as “Installation of temporary custom color sidewalk shed as per plan. No change in use,egress or occupancy”
- Alteration, filed Aug 24, 2023, estimated cost $1K, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed May 5, 2023, estimated cost $1K, described as “Temporary installation and use of sidewalk shed as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 5, 2023, estimated cost $1K, described as “Temporary installation and use of supported scaffold as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Feb 17, 2023, estimated cost $225K, described as “Mechanical work proposed for an existing apartment. No change to use, occupancy or egress.”
- Alteration, filed Feb 8, 2023, estimated cost $35K, described as “New dunnage proposed for condensing units apartment 11W. No change to use, occupancy or egress.”
- Alteration, filed Dec 23, 2022, estimated cost $35K, described as “Installation of Electrical Riser proposed for an existing apartment. No Change to Use, Occupancy or Egress.”
- Alteration, filed Nov 17, 2022, estimated cost $1.4M, described as “Facade and exterior masonry repairs as per drawings. No change in use, egress or occupancy is involved under this application.”
- Alteration, filed Aug 2, 2022, estimated cost $105K, described as “Plumbing work proposed for an existing apartment. No change to use, occupancy or egress.”
- Alteration, filed Jul 29, 2022, estimated cost $3.3M, described as “Renovation of an existing apartment. No change to use, occupancy or egress.”
Property taxes
- Assessment
- $17,604,900
- 2026–27 tax
- $1,697,959
- Market value (city estimate)
- $39,122,000
- Taxable value
- $15,984,630
- Assessed land
- $2,245,500
- Assessed improvements
- $15,359,400
Tax breaks
- Co-op and condo abatement, with no end date, a $290,369 credit this tax year.
Zoning
R10 (part of the lot is R8B): floor area ratio 9.76 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 12, 2025: $37,500,000
- Aug 25, 2021: $22,000,000
- Aug 29, 2017: $23,500,000
- Jun 16, 2016: $21,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of 998 Fifth Avenue Apartment House: Individual Landmark, Metropolitan Museum Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.