960 Park Avenue, Manhattan
Co-op · 35 units · built c. 1912 · Block 1494, Lot 32.
Building permits
- Alteration, filed Feb 26, 2026, estimated cost $440K, described as “Masonry facade repair as per plans. No change to use, occupancy or egress.”
- Alteration, filed Feb 3, 2026, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 2, 2026, estimated cost $3K, described as “Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 2, 2026, estimated cost $3K, described as “Installation of temporary debris chute as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 30, 2026, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Jun 6, 2025, estimated cost $831K, described as “Interior renovation of existing 3W4C filed in conjunction with DOB now pl and mh. No change to use, occupancy or egress.”
- Alteration, filed Jun 3, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed May 1, 2025, estimated cost $112K, described as “Refiling the combination of apts 3W and 4C under tppn 3/97 filed in conjunction with pl previously filed under 100461420 . No change to use, occupancy or egress.”
- Alteration, filed Jan 17, 2025, estimated cost $75K, described as “Interior Renovation to existing Class "A" Apt. 1B on the 1st fl. remove and construct new partition, new opening at exterior wall for new thru the wall a/c units repair floor and ceiling as required, all as per plan, no change in use,…”
- Alteration, filed Jan 17, 2025, estimated cost $70K, described as “INSTALLATION OF A NEW THRU WALL SPLIT AIR CONDITIONING SYSTEM , DUCT WORK AND LOUVERS. in conjunction with alteration M01160541, all as per plan, no change in use, egress or occupancy”
- Alteration, filed Apr 18, 2024, estimated cost $75K, described as “Renovation of an existing laundry room and replacement of HVAC air handlers and in-window compressors. No change in use, occupancy or egress. All plumbing work is filed under app M00971439-S1. All mechanical work is filed under app…”
- Alteration, filed May 26, 2023, estimated cost $552K, described as “Interior renovation of partitions, ceilings and doors for unit 5W. No change in use, egress or occupancy.”
- Alteration, filed May 25, 2023, estimated cost $41K, described as “Modifications to existing plumbing system for unit 5W. No change in use, egress or occupancy.”
- Alteration, filed May 25, 2023, estimated cost $40K, described as “Modifications to existing HVAC system for unit 5W. No change in use, egress or occupancy.”
- Alteration, filed Apr 11, 2023, estimated cost $3K, described as “Modify window opening formechanical louver installation no change to use or egress under this application.”
- Alteration, filed Jul 27, 2022, estimated cost $1K, described as “Installation of pipe scaffolding as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Jul 26, 2022, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Jul 18, 2022, estimated cost $35K, described as “Filing herewith to provide domestic water, and sanitary plumbing no change to use or egress under this application.”
- Alteration, filed Jul 11, 2022, estimated cost $324K, described as “Filing herewith for the interior replacement of floor, walls and ceiling finsihes.new interior partitions and lighting . There is no changeto use, egress, or occupancyy.”
- Alteration, filed May 11, 2022, estimated cost $63K, described as “Mechanical work to replace air conditioning systems for apartment 12W as per plans. No change in use, egress of occupancy under this application.”
- Alteration, filed Nov 22, 2021, estimated cost $18K, described as “Replacement of packcaged unit with 5 ton split systtem in the lobby. No change to egress, use, or occupancy.”
- Alteration, filed Jul 21, 2021, estimated cost $400K, described as “Interior renovation of existing apartment as shown on drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed May 4, 2021, estimated cost $100K, described as “Mechanical work as per plans. Installation of condenser on the roof. No changes of use, egress or occupancy under this application.”
- Alteration, filed Apr 21, 2021, estimated cost $200K, described as “Filing herewith Interior renovation of existing apartment 3E as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Mar 19, 2021, estimated cost $70K, described as “Plumbing work as per plans. No change of use, egress or occupancy under this application.”
4 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $15,961,050
- 2026–27 tax
- $1,590,581
- Market value (city estimate)
- $35,469,000
- Taxable value
- $14,543,300
- Assessed land
- $2,317,500
- Assessed improvements
- $13,643,550
Tax breaks
- Co-op and condo abatement, with no end date, a $218,633 credit this tax year.
Zoning
R10 (part of the lot is R8B): floor area ratio 9.54 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Mar 4, 2026: $825,000
- Nov 6, 2025: $4,670,000
- Apr 28, 2025: $6,022,425
- Oct 16, 2024: $1,650,000
- Nov 3, 2021: $5,600,000
- Jul 21, 2021: $2,150,000
- Jun 7, 2021: $8,000,000
- Oct 26, 2020: $11,000,000, Apt 3-E
- Oct 28, 2019: $2,825,000
- May 13, 2019: $12,000,000
The 10 most recent of 12 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Park Avenue Historic District (Historic District). 38 Landmarks Preservation Commission permits are on file.