# 1133 Madison Avenue, Manhattan

Co-op · 60 units · built c. 1925 · Block 1496, Lot 54.

On Umarelli: https://umarelli.org/nyc/1014960054/1133-madison-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1496: https://umarelli.org/nyc/manhattan/1496.md

## Building permits

- Alteration, filed Apr 23, 2026, estimated cost $263K, described as “Interior alterations to Apt. 11C, as per plans. No change to Use, Occupancy, or Egress.”
- Alteration, filed Mar 12, 2026, estimated cost $3K, described as “Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 12, 2026, described as “Suspended scaffold system for AC sleeve installation”
- Alteration, filed Aug 19, 2025, estimated cost $105K, described as “Minor Demo. & Construction of Partitions, Millwork, Store Fixtures, Flooring and Paint Ceiling & Exposed Wall Surfaces on Part of 1st Fl. & Install Partitions, Door & Paint in Cellar to Enclose Existing Access Stair. No Change to…”
- Alteration, filed Jan 14, 2025, estimated cost $600K, described as “Demo work in the existing residential unit 11B. No change of use, occupancy, egress or zoning.”
- Alteration, filed Mar 8, 2024, estimated cost $295K, described as “Interior renovation and combination of apt 10B & 10C into one apartment as per TPPN 3/9.No change in use ,egress or occupancy.”
- Alteration, filed Mar 8, 2024, estimated cost $55K, described as “Combination of 2 apartments at 10th fl #'s 10B&C - mechanical work in conjunction with ot#M01014487-I1”
- Alteration, filed Mar 8, 2024, estimated cost $83K, described as “Combination of 2 apartments at 10th fl #'s 10B&C - plumbing work in conjunction with ot#M01014487-I1”
- Alteration, filed May 13, 2022, estimated cost $40K, described as “Filing alteration type ii to renovate one bathroom as per plans.”
- Alteration, filed Jan 24, 2022, estimated cost $35K, described as “Minimal localized facade \[ll11/98\] repairs of interior court and side yard East and North building elevations. Work scope in part responses to ECB Nov # 035577648R. No change to use, egress and or occupancy under this application.”
- Alteration, filed Dec 20, 2021, estimated cost $100K, described as “Interior renovation to APT#10A , remove and construct new partitions, modify part of ceiling and floor.. All as per plans submitted herewith. No change in use, egress or occupancy (plumbing filed under application #M00522495-I1)”
- Alteration, filed Dec 20, 2021, estimated cost $38K, described as “Replace, relocate & install new plumbing fixtures in conjunction in the renovation of apartment # 10A on the 10 floor. (gc application # M00522495-I1)”
- Alteration, filed Oct 26, 2021, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed to comply with chapter 33 of NYC building code 2014.”
- Alteration, filed Feb 22, 2021, estimated cost $11K, described as “Install new chimney extension as per plans. No change in use, occupancy or egress.”
- Alteration, filed Feb 16, 2021, estimated cost $10K, described as “Replacement of plumbing fixtures as per plans.”
- Alteration, filed Feb 12, 2021, estimated cost $88K, described as “Formally filing alteration type ii to renovate one kitchen and one powder room as per plans. No change to use, egress, or occupancy is proposed under this application.”
- Alteration, filed Dec 17, 2019, estimated cost $5K, described as “Temporary placement of tubular steel scaffold structure as shown on plans. Installation shall comply with BSA-362-44-sm, ll-33/91 and chapter 33 of 2014 bc. No change in egress, occupancy or use associated with this permit.”
- Alteration, filed Nov 13, 2019, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans during facade repairs. No change in use, egress or occupancy. Sidewalk shed to comply with chapter 33 of NYC building code of 2104.”
- Alteration, filed Aug 19, 2019, estimated cost $32K, described as “Herewith filing alt2 application for Plumbing work type. All work in accordance with submitted plans. No changes to use, egress or occupancy under this application.”

## Property taxes

- Assessment: $15,466,050
- 2026–27 Tax: $1,545,156
- Market value (city estimate): $34,369,000
- Taxable value: $14,718,210
- Assessed land: $1,953,000
- Assessed improvements: $13,513,050

## Tax breaks

- Co-op and condo abatement, with no end date, a $286,514 credit this tax year.

## Zoning

C5-1: floor area ratio 10.53 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jul 8, 2026: $1,475,000
- Apr 21, 2026: $935,000
- Nov 13, 2025: $1,100,000
- Mar 31, 2025: $1,795,000
- Dec 19, 2024: $250,000
- Oct 30, 2024: $1,395,000
- Aug 8, 2024: $1,999,900
- Nov 13, 2023: $1,600,000
- Sep 11, 2023: $1,150,000
- Aug 14, 2023: $1,165,000

The 10 most recent of 20 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
